2006-GS INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 7.84 8.10 8.36 8.62 8.88 9.03 9.29 9.55 9.56 9.80 O 11.76 12.15 12.54 12.93 13.32 13.55 13.94 14.33 14.34 14.70 2 B 8.81 9.02 9.31 9.56 9.66 9.95 10.23 10.52 10.80 11.08 O 13.22 13.53 13.97 14.34 14.49 14.93 15.35 15.78 16.20 16.62 3 B 9.61 9.93 10.25 10.57 10.89 11.21 11.54 11.86 12.18 12.50 O 14.42 14.90 15.38 15.86 16.34 16.82 17.31 17.79 18.27 18.75 4 B 10.79 11.15 11.51 11.87 12.23 12.59 12.95 13.31 13.67 14.03 O 16.19 16.73 17.27 17.81 18.35 18.89 19.43 19.97 20.51 21.05 5 B 12.07 12.47 12.88 13.28 13.68 14.08 14.49 14.89 15.29 15.69 O 18.11 18.71 19.32 19.92 20.52 21.12 21.74 22.34 22.94 23.54 6 B 13.46 13.91 14.35 14.80 15.25 15.70 16.15 16.60 17.05 17.49 O 20.19 20.87 21.53 22.20 22.88 23.55 24.23 24.90 25.58 26.24 7 B 14.95 15.45 15.95 16.45 16.95 17.45 17.94 18.44 18.94 19.44 O 22.43 23.18 23.93 24.68 25.43 26.18 26.91 27.66 28.41 29.16 8 B 16.56 17.11 17.67 18.22 18.77 19.32 19.87 20.43 20.98 21.53 O 24.84 25.67 26.51 27.33 28.16 28.98 29.81 30.21 30.21 30.21 9 B 18.29 18.90 19.51 20.12 20.73 21.34 21.95 22.56 23.17 23.78 O 27.44 28.35 29.27 30.18 30.21 30.21 30.21 30.21 30.21 30.21 10 B 20.14 20.82 21.49 22.16 22.83 23.50 24.17 24.84 25.51 26.19 O 30.21 30.21 30.21 30.21 30.21 30.21 30.21 30.21 30.21 30.21 11 B 22.13 22.87 23.61 24.35 25.08 25.82 26.56 27.30 28.03 28.77 O 30.21 30.21 30.21 30.21 30.21 30.21 30.21 30.21 30.21 30.21 12 B 26.53 27.41 28.29 29.18 30.06 30.95 31.83 32.71 33.60 34.48 O 30.21 30.21 30.21 30.21 30.21 30.95 31.83 32.71 33.60 34.48 13 B 31.54 32.60 33.65 34.70 35.75 36.80 37.85 38.90 39.95 41.01 O 31.54 32.60 33.65 34.70 35.75 36.80 37.85 38.90 39.95 41.01 14 B 37.28 38.52 39.76 41.00 42.24 43.49 44.73 45.97 47.21 48.46 O 37.28 38.52 39.76 41.00 42.24 43.49 44.73 45.97 47.21 48.46 15 B 43.85 45.31 46.77 48.23 49.69 51.15 52.61 54.08 55.54 57.00 O 43.85 45.31 46.77 48.23 49.69 51.15 52.61 54.08 55.54 57.00 2006-ATL INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 15.10% FOR THE LOCALITY PAY AREA OF ATLANTA-SANDY SPRINGS-GAINESVILLE, GA-AL (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.20%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.02 9.32 9.62 9.92 10.22 10.39 10.69 10.99 11.00 11.28 O 13.53 13.98 14.43 14.88 15.33 15.59 16.04 16.49 16.50 16.92 2 B 10.14 10.38 10.72 11.00 11.12 11.45 11.78 12.10 12.43 12.76 O 15.21 15.57 16.08 16.50 16.68 17.18 17.67 18.15 18.65 19.14 3 B 11.06 11.43 11.80 12.17 12.54 12.91 13.28 13.65 14.01 14.38 O 16.59 17.15 17.70 18.26 18.81 19.37 19.92 20.48 21.02 21.57 4 B 12.42 12.83 13.25 13.66 14.08 14.49 14.90 15.32 15.73 16.15 O 18.63 19.25 19.88 20.49 21.12 21.74 22.35 22.98 23.60 24.23 5 B 13.90 14.36 14.82 15.29 15.75 16.21 16.67 17.14 17.60 18.06 O 20.85 21.54 22.23 22.94 23.63 24.32 25.01 25.71 26.40 27.09 6 B 15.49 16.01 16.52 17.04 17.55 18.07 18.59 19.10 19.62 20.14 O 23.24 24.02 24.78 25.56 26.33 27.11 27.89 28.65 29.43 30.21 7 B 17.21 17.79 18.36 18.93 19.51 20.08 20.65 21.23 21.80 22.37 O 25.82 26.69 27.54 28.40 29.27 30.12 30.98 31.85 32.70 33.56 8 B 19.06 19.70 20.33 20.97 21.60 22.24 22.87 23.51 24.14 24.78 O 28.59 29.55 30.50 31.46 32.40 33.36 34.31 34.79 34.79 34.79 9 B 21.05 21.76 22.46 23.16 23.86 24.56 25.27 25.97 26.67 27.37 O 31.58 32.64 33.69 34.74 34.79 34.79 34.79 34.79 34.79 34.79 10 B 23.19 23.96 24.73 25.50 26.28 27.05 27.82 28.59 29.37 30.14 O 34.79 34.79 34.79 34.79 34.79 34.79 34.79 34.79 34.79 34.79 11 B 25.47 26.32 27.17 28.02 28.87 29.72 30.57 31.42 32.27 33.12 O 34.79 34.79 34.79 34.79 34.79 34.79 34.79 34.79 34.79 34.79 12 B 30.53 31.55 32.57 33.58 34.60 35.62 36.64 37.65 38.67 39.69 O 34.79 34.79 34.79 34.79 34.79 35.62 36.64 37.65 38.67 39.69 13 B 36.31 37.52 38.73 39.94 41.15 42.36 43.57 44.78 45.99 47.20 O 36.31 37.52 38.73 39.94 41.15 42.36 43.57 44.78 45.99 47.20 14 B 42.90 44.33 45.76 47.19 48.62 50.05 51.48 52.91 54.34 55.77 O 42.90 44.33 45.76 47.19 48.62 50.05 51.48 52.91 54.34 55.77 15 B 50.47 52.15 53.83 55.51 57.20 58.88 60.56 62.24 63.92 65.61 O 50.47 52.15 53.83 55.51 57.20 58.88 60.56 62.24 63.92 65.61 2006-BOS INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 19.99% FOR THE LOCALITY PAY AREA OF BOSTON-WORCESTER-MANCHESTER, MA-NH-ME-RI (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.39%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.40 9.72 10.03 10.34 10.65 10.84 11.14 11.46 11.47 11.76 O 14.10 14.58 15.05 15.51 15.98 16.26 16.71 17.19 17.21 17.64 2 B 10.57 10.82 11.17 11.47 11.60 11.94 12.28 12.62 12.96 13.30 O 15.86 16.23 16.76 17.21 17.40 17.91 18.42 18.93 19.44 19.95 3 B 11.53 11.92 12.30 12.69 13.07 13.46 13.84 14.23 14.61 15.00 O 17.30 17.88 18.45 19.04 19.61 20.19 20.76 21.35 21.92 22.50 4 B 12.95 13.38 13.81 14.24 14.67 15.11 15.54 15.97 16.40 16.83 O 19.43 20.07 20.72 21.36 22.01 22.67 23.31 23.96 24.60 25.25 5 B 14.49 14.97 15.45 15.93 16.42 16.90 17.38 17.87 18.35 18.83 O 21.74 22.46 23.18 23.90 24.63 25.35 26.07 26.81 27.53 28.25 6 B 16.15 16.69 17.22 17.76 18.30 18.84 19.38 19.91 20.45 20.99 O 24.23 25.04 25.83 26.64 27.45 28.26 29.07 29.87 30.68 31.49 7 B 17.94 18.54 19.14 19.74 20.33 20.93 21.53 22.13 22.73 23.32 O 26.91 27.81 28.71 29.61 30.50 31.40 32.30 33.20 34.10 34.98 8 B 19.87 20.53 21.20 21.86 22.52 23.18 23.85 24.51 25.17 25.83 O 29.81 30.80 31.80 32.79 33.78 34.77 35.78 36.26 36.26 36.26 9 B 21.95 22.68 23.41 24.14 24.88 25.61 26.34 27.07 27.80 28.54 O 32.93 34.02 35.12 36.21 36.26 36.26 36.26 36.26 36.26 36.26 10 B 24.17 24.98 25.78 26.59 27.39 28.20 29.00 29.81 30.61 31.42 O 36.26 36.26 36.26 36.26 36.26 36.26 36.26 36.26 36.26 36.26 11 B 26.56 27.44 28.33 29.21 30.10 30.98 31.87 32.75 33.64 34.52 O 36.26 36.26 36.26 36.26 36.26 36.26 36.26 36.26 36.26 36.26 12 B 31.83 32.89 33.95 35.01 36.07 37.13 38.19 39.25 40.31 41.38 O 36.26 36.26 36.26 36.26 36.26 37.13 38.19 39.25 40.31 41.38 13 B 37.85 39.11 40.37 41.63 42.90 44.16 45.42 46.68 47.94 49.20 O 37.85 39.11 40.37 41.63 42.90 44.16 45.42 46.68 47.94 49.20 14 B 44.73 46.22 47.71 49.20 50.69 52.18 53.67 55.16 56.65 58.14 O 44.73 46.22 47.71 49.20 50.69 52.18 53.67 55.16 56.65 58.14 15 B 52.61 54.36 56.12 57.87 59.63 61.38 63.13 64.89 66.64 68.39 O 52.61 54.36 56.12 57.87 59.63 61.38 63.13 64.89 66.64 68.39 2006-BU INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 13.52% FOR THE LOCALITY PAY AREA OF BUFFALO-NIAGARA-CATTARAUGUS, NY (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.75%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 8.89 9.19 9.49 9.78 10.08 10.25 10.54 10.84 10.85 11.12 O 13.34 13.79 14.24 14.67 15.12 15.38 15.81 16.26 16.28 16.68 2 B 10.00 10.24 10.57 10.85 10.97 11.29 11.62 11.94 12.26 12.58 O 15.00 15.36 15.86 16.28 16.46 16.94 17.43 17.91 18.39 18.87 3 B 10.91 11.28 11.64 12.00 12.37 12.73 13.09 13.46 13.82 14.19 O 16.37 16.92 17.46 18.00 18.56 19.10 19.64 20.19 20.73 21.29 4 B 12.25 12.66 13.07 13.47 13.88 14.29 14.70 15.11 15.52 15.93 O 18.38 18.99 19.61 20.21 20.82 21.44 22.05 22.67 23.28 23.90 5 B 13.70 14.16 14.62 15.08 15.53 15.99 16.45 16.90 17.36 17.82 O 20.55 21.24 21.93 22.62 23.30 23.99 24.68 25.35 26.04 26.73 6 B 15.28 15.79 16.29 16.80 17.31 17.82 18.33 18.84 19.35 19.86 O 22.92 23.69 24.44 25.20 25.97 26.73 27.50 28.26 29.03 29.79 7 B 16.98 17.54 18.11 18.67 19.24 19.80 20.37 20.94 21.50 22.07 O 25.47 26.31 27.17 28.01 28.86 29.70 30.56 31.41 32.25 33.11 8 B 18.80 19.43 20.05 20.68 21.31 21.93 22.56 23.19 23.81 24.44 O 28.20 29.15 30.08 31.02 31.97 32.90 33.84 34.31 34.31 34.31 9 B 20.76 21.46 22.15 22.84 23.53 24.23 24.92 25.61 26.30 27.00 O 31.14 32.19 33.23 34.26 34.31 34.31 34.31 34.31 34.31 34.31 10 B 22.87 23.63 24.39 25.15 25.92 26.68 27.44 28.20 28.96 29.73 O 34.31 34.31 34.31 34.31 34.31 34.31 34.31 34.31 34.31 34.31 11 B 25.12 25.96 26.80 27.64 28.47 29.31 30.15 30.99 31.83 32.66 O 34.31 34.31 34.31 34.31 34.31 34.31 34.31 34.31 34.31 34.31 12 B 30.11 31.12 32.12 33.12 34.13 35.13 36.13 37.14 38.14 39.14 O 34.31 34.31 34.31 34.31 34.31 35.13 36.13 37.14 38.14 39.14 13 B 35.81 37.00 38.20 39.39 40.58 41.78 42.97 44.16 45.36 46.55 O 35.81 37.00 38.20 39.39 40.58 41.78 42.97 44.16 45.36 46.55 14 B 42.31 43.72 45.14 46.55 47.96 49.37 50.78 52.19 53.60 55.01 O 42.31 43.72 45.14 46.55 47.96 49.37 50.78 52.19 53.60 55.01 15 B 49.77 51.43 53.09 54.75 56.41 58.07 59.73 61.39 63.05 64.71 O 49.77 51.43 53.09 54.75 56.41 58.07 59.73 61.39 63.05 64.71 2006-CHI INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 21.15% FOR THE LOCALITY PAY AREA OF CHICAGO-NAPERVILLE-MICHIGAN CITY, IL-IN-WI (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.34%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.49 9.81 10.13 10.44 10.75 10.94 11.25 11.57 11.58 11.87 O 14.24 14.72 15.20 15.66 16.13 16.41 16.88 17.36 17.37 17.81 2 B 10.67 10.93 11.28 11.58 11.71 12.05 12.40 12.74 13.08 13.43 O 16.01 16.40 16.92 17.37 17.57 18.08 18.60 19.11 19.62 20.15 3 B 11.64 12.03 12.42 12.81 13.20 13.59 13.98 14.36 14.75 15.14 O 17.46 18.05 18.63 19.22 19.80 20.39 20.97 21.54 22.13 22.71 4 B 13.07 13.51 13.94 14.38 14.82 15.25 15.69 16.12 16.56 17.00 O 19.61 20.27 20.91 21.57 22.23 22.88 23.54 24.18 24.84 25.50 5 B 14.63 15.11 15.60 16.09 16.58 17.06 17.55 18.04 18.53 19.01 O 21.95 22.67 23.40 24.14 24.87 25.59 26.33 27.06 27.80 28.52 6 B 16.30 16.85 17.39 17.93 18.48 19.02 19.56 20.11 20.65 21.19 O 24.45 25.28 26.09 26.90 27.72 28.53 29.34 30.17 30.98 31.79 7 B 18.12 18.72 19.32 19.93 20.53 21.14 21.74 22.34 22.95 23.55 O 27.18 28.08 28.98 29.90 30.80 31.71 32.61 33.51 34.43 35.33 8 B 20.06 20.73 21.40 22.07 22.74 23.41 24.08 24.75 25.41 26.08 O 30.09 31.10 32.10 33.11 34.11 35.12 36.12 36.60 36.60 36.60 9 B 22.16 22.90 23.64 24.38 25.12 25.86 26.59 27.33 28.07 28.81 O 33.24 34.35 35.46 36.57 36.60 36.60 36.60 36.60 36.60 36.60 10 B 24.40 25.22 26.03 26.84 27.66 28.47 29.28 30.10 30.91 31.72 O 36.60 36.60 36.60 36.60 36.60 36.60 36.60 36.60 36.60 36.60 11 B 26.81 27.71 28.60 29.49 30.39 31.28 32.18 33.07 33.96 34.86 O 36.60 36.60 36.60 36.60 36.60 36.60 36.60 36.60 36.60 36.60 12 B 32.14 33.21 34.28 35.35 36.42 37.49 38.56 39.63 40.70 41.78 O 36.60 36.60 36.60 36.60 36.60 37.49 38.56 39.63 40.70 41.78 13 B 38.22 39.49 40.76 42.04 43.31 44.58 45.86 47.13 48.40 49.68 O 38.22 39.49 40.76 42.04 43.31 44.58 45.86 47.13 48.40 49.68 14 B 45.16 46.66 48.17 49.67 51.18 52.68 54.19 55.70 57.20 58.71 O 45.16 46.66 48.17 49.67 51.18 52.68 54.19 55.70 57.20 58.71 15 B 53.12 54.89 56.66 58.43 60.20 61.97 63.74 65.51 67.28 68.52 O 53.12 54.89 56.66 58.43 60.20 61.97 63.74 65.51 67.28 68.52 * Rate limited to the rate for level IV of the Executive Schedule (5 U.S.C. 5304 (g)(1)). 2006-CIN INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 17.08% FOR THE LOCALITY PAY AREA OF CINCINNATI-MIDDLETOWN-WILMINGTON, OH-KY-IN (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.02%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.17 9.48 9.78 10.09 10.39 10.57 10.87 11.18 11.19 11.47 O 13.76 14.22 14.67 15.14 15.59 15.86 16.31 16.77 16.79 17.21 2 B 10.31 10.56 10.90 11.19 11.31 11.65 11.98 12.31 12.65 12.98 O 15.47 15.84 16.35 16.79 16.97 17.48 17.97 18.47 18.98 19.47 3 B 11.25 11.63 12.00 12.38 12.75 13.13 13.51 13.88 14.26 14.63 O 16.88 17.45 18.00 18.57 19.13 19.70 20.27 20.82 21.39 21.95 4 B 12.63 13.05 13.48 13.90 14.32 14.74 15.16 15.58 16.00 16.43 O 18.95 19.58 20.22 20.85 21.48 22.11 22.74 23.37 24.00 24.65 5 B 14.13 14.61 15.08 15.55 16.02 16.49 16.96 17.43 17.90 18.38 O 21.20 21.92 22.62 23.33 24.03 24.74 25.44 26.15 26.85 27.57 6 B 15.76 16.28 16.81 17.33 17.86 18.38 18.91 19.43 19.96 20.48 O 23.64 24.42 25.22 26.00 26.79 27.57 28.37 29.15 29.94 30.72 7 B 17.51 18.09 18.68 19.26 19.84 20.43 21.01 21.59 22.18 22.76 O 26.27 27.14 28.02 28.89 29.76 30.65 31.52 32.39 33.27 34.14 8 B 19.39 20.04 20.68 21.33 21.97 22.62 23.27 23.91 24.56 25.21 O 29.09 30.06 31.02 32.00 32.96 33.93 34.91 35.37 35.37 35.37 9 B 21.42 22.13 22.84 23.56 24.27 24.99 25.70 26.41 27.13 27.84 O 32.13 33.20 34.26 35.34 35.37 35.37 35.37 35.37 35.37 35.37 10 B 23.58 24.37 25.16 25.94 26.73 27.51 28.30 29.09 29.87 30.66 O 35.37 35.37 35.37 35.37 35.37 35.37 35.37 35.37 35.37 35.37 11 B 25.91 26.78 27.64 28.50 29.37 30.23 31.10 31.96 32.82 33.69 O 35.37 35.37 35.37 35.37 35.37 35.37 35.37 35.37 35.37 35.37 12 B 31.06 32.09 33.13 34.16 35.20 36.23 37.27 38.30 39.34 40.37 O 35.37 35.37 35.37 35.37 35.37 36.23 37.27 38.30 39.34 40.37 13 B 36.93 38.16 39.39 40.62 41.85 43.09 44.32 45.55 46.78 48.01 O 36.93 38.16 39.39 40.62 41.85 43.09 44.32 45.55 46.78 48.01 14 B 43.64 45.10 46.55 48.01 49.46 50.91 52.37 53.82 55.28 56.73 O 43.64 45.10 46.55 48.01 49.46 50.91 52.37 53.82 55.28 56.73 15 B 51.33 53.05 54.76 56.47 58.18 59.89 61.60 63.31 65.02 66.73 O 51.33 53.05 54.76 56.47 58.18 59.89 61.60 63.31 65.02 66.73 2006-CLE INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 15.41% FOR THE LOCALITY PAY AREA OF CLEVELAND-AKRON-ELYRIA, OH (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.15%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.04 9.34 9.65 9.94 10.25 10.42 10.72 11.02 11.03 11.31 O 13.56 14.01 14.48 14.91 15.38 15.63 16.08 16.53 16.55 16.97 2 B 10.17 10.41 10.75 11.03 11.15 11.48 11.81 12.14 12.47 12.79 O 15.26 15.62 16.13 16.55 16.73 17.22 17.72 18.21 18.71 19.19 3 B 11.09 11.46 11.83 12.20 12.57 12.94 13.31 13.68 14.05 14.42 O 16.64 17.19 17.75 18.30 18.86 19.41 19.97 20.52 21.08 21.63 4 B 12.45 12.87 13.28 13.70 14.11 14.53 14.94 15.36 15.78 16.19 O 18.68 19.31 19.92 20.55 21.17 21.80 22.41 23.04 23.67 24.29 5 B 13.93 14.40 14.86 15.33 15.79 16.26 16.72 17.18 17.65 18.11 O 20.90 21.60 22.29 23.00 23.69 24.39 25.08 25.77 26.48 27.17 6 B 15.53 16.05 16.57 17.08 17.60 18.12 18.64 19.15 19.67 20.19 O 23.30 24.08 24.86 25.62 26.40 27.18 27.96 28.73 29.51 30.29 7 B 17.26 17.83 18.41 18.98 19.56 20.13 20.71 21.28 21.86 22.43 O 25.89 26.75 27.62 28.47 29.34 30.20 31.07 31.92 32.79 33.65 8 B 19.11 19.75 20.39 21.02 21.66 22.30 22.94 23.57 24.21 24.85 O 28.67 29.63 30.59 31.53 32.49 33.45 34.41 34.88 34.88 34.88 9 B 21.11 21.81 22.52 23.22 23.93 24.63 25.33 26.04 26.74 27.45 O 31.67 32.72 33.78 34.83 34.88 34.88 34.88 34.88 34.88 34.88 10 B 23.25 24.02 24.80 25.57 26.35 27.12 27.90 28.67 29.45 30.22 O 34.88 34.88 34.88 34.88 34.88 34.88 34.88 34.88 34.88 34.88 11 B 25.54 26.39 27.25 28.10 28.95 29.80 30.65 31.50 32.36 33.21 O 34.88 34.88 34.88 34.88 34.88 34.88 34.88 34.88 34.88 34.88 12 B 30.61 31.63 32.65 33.67 34.69 35.72 36.74 37.76 38.78 39.80 O 34.88 34.88 34.88 34.88 34.88 35.72 36.74 37.76 38.78 39.80 13 B 36.40 37.62 38.83 40.04 41.26 42.47 43.68 44.90 46.11 47.32 O 36.40 37.62 38.83 40.04 41.26 42.47 43.68 44.90 46.11 47.32 14 B 43.02 44.45 45.89 47.32 48.75 50.19 51.62 53.06 54.49 55.92 O 43.02 44.45 45.89 47.32 48.75 50.19 51.62 53.06 54.49 55.92 15 B 50.60 52.29 53.98 55.66 57.35 59.04 60.72 62.41 64.10 65.78 O 50.60 52.29 53.98 55.66 57.35 59.04 60.72 62.41 64.10 65.78 2006-COL INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 14.85% FOR THE LOCALITY PAY AREA OF COLUMBUS-MARION-CHILLICOTHE, OH (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 2.88%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.00 9.30 9.60 9.90 10.20 10.37 10.67 10.97 10.98 11.25 O 13.50 13.95 14.40 14.85 15.30 15.56 16.01 16.46 16.47 16.88 2 B 10.12 10.36 10.69 10.98 11.10 11.43 11.75 12.08 12.40 12.73 O 15.18 15.54 16.04 16.47 16.65 17.15 17.63 18.12 18.60 19.10 3 B 11.04 11.41 11.78 12.14 12.51 12.88 13.25 13.62 13.98 14.35 O 16.56 17.12 17.67 18.21 18.77 19.32 19.88 20.43 20.97 21.53 4 B 12.39 12.81 13.22 13.63 14.05 14.46 14.87 15.29 15.70 16.11 O 18.59 19.22 19.83 20.45 21.08 21.69 22.31 22.94 23.55 24.17 5 B 13.86 14.33 14.79 15.25 15.71 16.18 16.64 17.10 17.56 18.03 O 20.79 21.50 22.19 22.88 23.57 24.27 24.96 25.65 26.34 27.05 6 B 15.46 15.97 16.49 17.00 17.52 18.03 18.55 19.06 19.58 20.09 O 23.19 23.96 24.74 25.50 26.28 27.05 27.83 28.59 29.37 30.14 7 B 17.17 17.75 18.32 18.89 19.46 20.04 20.61 21.18 21.75 22.33 O 25.76 26.63 27.48 28.34 29.19 30.06 30.92 31.77 32.63 33.50 8 B 19.02 19.65 20.29 20.92 21.56 22.19 22.82 23.46 24.09 24.73 O 28.53 29.48 30.44 31.38 32.34 33.29 34.23 34.71 34.71 34.71 9 B 21.01 21.71 22.41 23.11 23.81 24.51 25.21 25.91 26.61 27.31 O 31.52 32.57 33.62 34.67 34.71 34.71 34.71 34.71 34.71 34.71 10 B 23.14 23.91 24.68 25.45 26.22 26.99 27.76 28.53 29.30 30.07 O 34.71 34.71 34.71 34.71 34.71 34.71 34.71 34.71 34.71 34.71 11 B 25.42 26.27 27.11 27.96 28.81 29.66 30.50 31.35 32.20 33.05 O 34.71 34.71 34.71 34.71 34.71 34.71 34.71 34.71 34.71 34.71 12 B 30.47 31.48 32.50 33.51 34.53 35.54 36.56 37.57 38.59 39.60 O 34.71 34.71 34.71 34.71 34.71 35.54 36.56 37.57 38.59 39.60 13 B 36.23 37.44 38.64 39.85 41.06 42.26 43.47 44.68 45.89 47.09 O 36.23 37.44 38.64 39.85 41.06 42.26 43.47 44.68 45.89 47.09 14 B 42.81 44.24 45.66 47.09 48.52 49.95 51.37 52.80 54.23 55.65 O 42.81 44.24 45.66 47.09 48.52 49.95 51.37 52.80 54.23 55.65 15 B 50.36 52.04 53.71 55.39 57.07 58.75 60.43 62.11 63.78 65.46 O 50.36 52.04 53.71 55.39 57.07 58.75 60.43 62.11 63.78 65.46 2006-DFW INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 16.39% FOR THE LOCALITY PAY AREA OF DALLAS-FORT WORTH, TX (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.27%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.12 9.42 9.73 10.03 10.33 10.51 10.81 11.11 11.12 11.40 O 13.68 14.13 14.60 15.05 15.50 15.77 16.22 16.67 16.68 17.10 2 B 10.25 10.50 10.84 11.12 11.25 11.58 11.91 12.24 12.57 12.90 O 15.38 15.75 16.26 16.68 16.88 17.37 17.87 18.36 18.86 19.35 3 B 11.19 11.56 11.93 12.31 12.68 13.05 13.43 13.80 14.17 14.55 O 16.79 17.34 17.90 18.47 19.02 19.58 20.15 20.70 21.26 21.83 4 B 12.56 12.98 13.40 13.82 14.23 14.65 15.07 15.49 15.91 16.33 O 18.84 19.47 20.10 20.73 21.35 21.98 22.61 23.24 23.87 24.50 5 B 14.05 14.52 14.99 15.46 15.92 16.39 16.86 17.33 17.80 18.27 O 21.08 21.78 22.49 23.19 23.88 24.59 25.29 26.00 26.70 27.41 6 B 15.66 16.18 16.71 17.23 17.75 18.27 18.79 19.32 19.84 20.36 O 23.49 24.27 25.07 25.85 26.63 27.41 28.19 28.98 29.76 30.54 7 B 17.40 17.99 18.56 19.15 19.72 20.30 20.89 21.46 22.05 22.62 O 26.10 26.99 27.84 28.73 29.58 30.45 31.34 32.19 33.08 33.93 8 B 19.28 19.92 20.56 21.20 21.85 22.49 23.13 23.77 24.41 25.06 O 28.92 29.88 30.84 31.80 32.78 33.74 34.70 35.18 35.18 35.18 9 B 21.29 22.00 22.71 23.42 24.13 24.84 25.55 26.26 26.97 27.68 O 31.94 33.00 34.07 35.13 35.18 35.18 35.18 35.18 35.18 35.18 10 B 23.45 24.23 25.01 25.79 26.57 27.35 28.13 28.91 29.70 30.48 O 35.18 35.18 35.18 35.18 35.18 35.18 35.18 35.18 35.18 35.18 11 B 25.76 26.62 27.48 28.34 29.19 30.05 30.91 31.77 32.63 33.49 O 35.18 35.18 35.18 35.18 35.18 35.18 35.18 35.18 35.18 35.18 12 B 30.87 31.90 32.93 33.96 34.99 36.02 37.05 38.08 39.11 40.13 O 35.18 35.18 35.18 35.18 35.18 36.02 37.05 38.08 39.11 40.13 13 B 36.71 37.94 39.16 40.38 41.61 42.83 44.06 45.28 46.50 47.73 O 36.71 37.94 39.16 40.38 41.61 42.83 44.06 45.28 46.50 47.73 14 B 43.38 44.83 46.28 47.72 49.17 50.61 52.06 53.51 54.95 56.40 O 43.38 44.83 46.28 47.72 49.17 50.61 52.06 53.51 54.95 56.40 15 B 51.03 52.73 54.43 56.14 57.84 59.54 61.24 62.94 64.64 66.34 O 51.03 52.73 54.43 56.14 57.84 59.54 61.24 62.94 64.64 66.34 2006-DAY INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 13.83% FOR THE LOCALITY PAY AREA OF DAYTON-SPRINGFIELD-GREENVILLE, OH (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 2.98%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 8.92 9.22 9.51 9.81 10.10 10.28 10.57 10.87 10.88 11.15 O 13.38 13.83 14.27 14.72 15.15 15.42 15.86 16.31 16.32 16.73 2 B 10.03 10.27 10.60 10.88 11.00 11.32 11.65 11.97 12.29 12.62 O 15.05 15.41 15.90 16.32 16.50 16.98 17.48 17.96 18.44 18.93 3 B 10.94 11.31 11.67 12.04 12.40 12.77 13.13 13.50 13.86 14.23 O 16.41 16.97 17.51 18.06 18.60 19.16 19.70 20.25 20.79 21.35 4 B 12.28 12.69 13.10 13.51 13.92 14.33 14.74 15.15 15.56 15.97 O 18.42 19.04 19.65 20.27 20.88 21.50 22.11 22.73 23.34 23.96 5 B 13.74 14.20 14.66 15.12 15.57 16.03 16.49 16.95 17.41 17.87 O 20.61 21.30 21.99 22.68 23.36 24.05 24.74 25.43 26.12 26.81 6 B 15.32 15.83 16.34 16.85 17.36 17.87 18.38 18.89 19.40 19.91 O 22.98 23.75 24.51 25.28 26.04 26.81 27.57 28.34 29.10 29.87 7 B 17.02 17.59 18.16 18.72 19.29 19.86 20.43 20.99 21.56 22.13 O 25.53 26.39 27.24 28.08 28.94 29.79 30.65 31.49 32.34 33.20 8 B 18.85 19.48 20.11 20.74 21.36 21.99 22.62 23.25 23.88 24.51 O 28.28 29.22 30.17 31.11 32.04 32.99 33.93 34.40 34.40 34.40 9 B 20.82 21.52 22.21 22.90 23.60 24.29 24.99 25.68 26.38 27.07 O 31.23 32.28 33.32 34.35 34.40 34.40 34.40 34.40 34.40 34.40 10 B 22.93 23.69 24.46 25.22 25.99 26.75 27.51 28.28 29.04 29.81 O 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 11 B 25.19 26.03 26.87 27.71 28.55 29.39 30.23 31.07 31.91 32.75 O 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 12 B 30.19 31.20 32.21 33.21 34.22 35.23 36.23 37.24 38.25 39.25 O 34.40 34.40 34.40 34.40 34.40 35.23 36.23 37.24 38.25 39.25 13 B 35.91 37.10 38.30 39.50 40.69 41.89 43.09 44.28 45.48 46.68 O 35.91 37.10 38.30 39.50 40.69 41.89 43.09 44.28 45.48 46.68 14 B 42.43 43.84 45.26 46.67 48.09 49.50 50.92 52.33 53.74 55.16 O 42.43 43.84 45.26 46.67 48.09 49.50 50.92 52.33 53.74 55.16 15 B 49.91 51.57 53.24 54.90 56.56 58.23 59.89 61.55 63.22 64.88 O 49.91 51.57 53.24 54.90 56.56 58.23 59.89 61.55 63.22 64.88 2006-DEN INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 19.49% FOR THE LOCALITY PAY AREA OF DENVER-AURORA-BOULDER, CO (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.34%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.36 9.67 9.99 10.30 10.61 10.79 11.10 11.41 11.42 11.71 O 14.04 14.51 14.99 15.45 15.92 16.19 16.65 17.12 17.13 17.57 2 B 10.53 10.78 11.13 11.42 11.55 11.89 12.23 12.57 12.91 13.25 O 15.80 16.17 16.70 17.13 17.33 17.84 18.35 18.86 19.37 19.88 3 B 11.49 11.87 12.25 12.63 13.02 13.40 13.78 14.17 14.55 14.93 O 17.24 17.81 18.38 18.95 19.53 20.10 20.67 21.26 21.83 22.40 4 B 12.89 13.32 13.75 14.18 14.61 15.04 15.47 15.90 16.33 16.76 O 19.34 19.98 20.63 21.27 21.92 22.56 23.21 23.85 24.50 25.14 5 B 14.43 14.91 15.39 15.87 16.35 16.83 17.31 17.79 18.27 18.75 O 21.65 22.37 23.09 23.81 24.53 25.25 25.97 26.69 27.41 28.13 6 B 16.08 16.62 17.15 17.69 18.22 18.76 19.30 19.83 20.37 20.90 O 24.12 24.93 25.73 26.54 27.33 28.14 28.95 29.75 30.56 31.35 7 B 17.87 18.46 19.06 19.66 20.25 20.85 21.44 22.04 22.63 23.23 O 26.81 27.69 28.59 29.49 30.38 31.28 32.16 33.06 33.95 34.85 8 B 19.79 20.45 21.11 21.77 22.43 23.09 23.75 24.41 25.07 25.72 O 29.69 30.68 31.67 32.66 33.65 34.64 35.63 36.11 36.11 36.11 9 B 21.86 22.59 23.31 24.04 24.77 25.50 26.23 26.96 27.69 28.42 O 32.79 33.89 34.97 36.06 36.11 36.11 36.11 36.11 36.11 36.11 10 B 24.07 24.87 25.67 26.48 27.28 28.08 28.88 29.68 30.49 31.29 O 36.11 36.11 36.11 36.11 36.11 36.11 36.11 36.11 36.11 36.11 11 B 26.45 27.33 28.21 29.09 29.97 30.85 31.74 32.62 33.50 34.38 O 36.11 36.11 36.11 36.11 36.11 36.11 36.11 36.11 36.11 36.11 12 B 31.70 32.75 33.81 34.86 35.92 36.98 38.03 39.09 40.15 41.20 O 36.11 36.11 36.11 36.11 36.11 36.98 38.03 39.09 40.15 41.20 13 B 37.69 38.95 40.20 41.46 42.72 43.97 45.23 46.48 47.74 49.00 O 37.69 38.95 40.20 41.46 42.72 43.97 45.23 46.48 47.74 49.00 14 B 44.54 46.02 47.51 48.99 50.48 51.96 53.45 54.93 56.42 57.90 O 44.54 46.02 47.51 48.99 50.48 51.96 53.45 54.93 56.42 57.90 15 B 52.39 54.14 55.88 57.63 59.38 61.12 62.87 64.62 66.36 68.11 O 52.39 54.14 55.88 57.63 59.38 61.12 62.87 64.62 66.36 68.11 2006-DET INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 21.00% FOR THE LOCALITY PAY AREA OF DETROIT-WARREN-FLINT, MI (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.23%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.48 9.80 10.11 10.43 10.74 10.93 11.24 11.55 11.56 11.86 O 14.22 14.70 15.17 15.65 16.11 16.40 16.86 17.33 17.34 17.79 2 B 10.66 10.91 11.27 11.56 11.69 12.04 12.38 12.72 13.07 13.41 O 15.99 16.37 16.91 17.34 17.54 18.06 18.57 19.08 19.61 20.12 3 B 11.63 12.02 12.41 12.79 13.18 13.57 13.96 14.35 14.73 15.12 O 17.45 18.03 18.62 19.19 19.77 20.36 20.94 21.53 22.10 22.68 4 B 13.06 13.49 13.93 14.36 14.80 15.23 15.67 16.10 16.54 16.97 O 19.59 20.24 20.90 21.54 22.20 22.85 23.51 24.15 24.81 25.46 5 B 14.61 15.09 15.58 16.07 16.56 17.04 17.53 18.02 18.50 18.99 O 21.92 22.64 23.37 24.11 24.84 25.56 26.30 27.03 27.75 28.49 6 B 16.28 16.83 17.37 17.91 18.45 19.00 19.54 20.08 20.62 21.17 O 24.42 25.25 26.06 26.87 27.68 28.50 29.31 30.12 30.93 31.76 7 B 18.09 18.70 19.30 19.90 20.51 21.11 21.71 22.32 22.92 23.52 O 27.14 28.05 28.95 29.85 30.77 31.67 32.57 33.48 34.38 35.28 8 B 20.04 20.71 21.37 22.04 22.71 23.38 24.05 24.71 25.38 26.05 O 30.06 31.07 32.06 33.06 34.07 35.07 36.08 36.56 36.56 36.56 9 B 22.13 22.87 23.61 24.35 25.09 25.82 26.56 27.30 28.04 28.78 O 33.20 34.31 35.42 36.53 36.56 36.56 36.56 36.56 36.56 36.56 10 B 24.37 25.19 26.00 26.81 27.62 28.44 29.25 30.06 30.87 31.68 O 36.56 36.56 36.56 36.56 36.56 36.56 36.56 36.56 36.56 36.56 11 B 26.78 27.67 28.56 29.46 30.35 31.24 32.14 33.03 33.92 34.82 O 36.56 36.56 36.56 36.56 36.56 36.56 36.56 36.56 36.56 36.56 12 B 32.10 33.17 34.24 35.31 36.38 37.45 38.51 39.58 40.65 41.72 O 36.56 36.56 36.56 36.56 36.56 37.45 38.51 39.58 40.65 41.72 13 B 38.17 39.44 40.71 41.98 43.26 44.53 45.80 47.07 48.34 49.62 O 38.17 39.44 40.71 41.98 43.26 44.53 45.80 47.07 48.34 49.62 14 B 45.10 46.61 48.11 49.61 51.12 52.62 54.12 55.63 57.13 58.63 O 45.10 46.61 48.11 49.61 51.12 52.62 54.12 55.63 57.13 58.63 15 B 53.05 54.82 56.59 58.36 60.13 61.90 63.66 65.43 67.20 68.52 O 53.05 54.82 56.59 58.36 60.13 61.90 63.66 65.43 67.20 68.52 * Rate limited to the rate for level IV of the Executive Schedule (5 U.S.C. 5304 (g)(1)). 2006-HAR INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 21.30% FOR THE LOCALITY PAY AREA OF HARTFORD-WEST HARTFORD-WILLIMANTIC, CT-MA (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.62%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.50 9.82 10.14 10.45 10.77 10.95 11.27 11.58 11.59 11.89 O 14.25 14.73 15.21 15.68 16.16 16.43 16.91 17.37 17.39 17.84 2 B 10.69 10.94 11.29 11.59 11.72 12.07 12.41 12.76 13.10 13.45 O 16.04 16.41 16.94 17.39 17.58 18.11 18.62 19.14 19.65 20.18 3 B 11.66 12.05 12.44 12.83 13.21 13.60 13.99 14.38 14.77 15.16 O 17.49 18.08 18.66 19.25 19.82 20.40 20.99 21.57 22.16 22.74 4 B 13.09 13.53 13.96 14.40 14.83 15.27 15.71 16.14 16.58 17.02 O 19.64 20.30 20.94 21.60 22.25 22.91 23.57 24.21 24.87 25.53 5 B 14.64 15.13 15.62 16.11 16.60 17.08 17.57 18.06 18.55 19.04 O 21.96 22.70 23.43 24.17 24.90 25.62 26.36 27.09 27.83 28.56 6 B 16.32 16.87 17.41 17.96 18.50 19.04 19.59 20.13 20.68 21.22 O 24.48 25.31 26.12 26.94 27.75 28.56 29.39 30.20 31.02 31.83 7 B 18.14 18.74 19.35 19.95 20.56 21.16 21.77 22.37 22.98 23.58 O 27.21 28.11 29.03 29.93 30.84 31.74 32.66 33.56 34.47 35.37 8 B 20.09 20.76 21.43 22.10 22.77 23.44 24.11 24.78 25.45 26.11 O 30.14 31.14 32.15 33.15 34.16 35.16 36.17 36.65 36.65 36.65 9 B 22.19 22.93 23.67 24.41 25.15 25.89 26.63 27.37 28.11 28.85 O 33.29 34.40 35.51 36.62 36.65 36.65 36.65 36.65 36.65 36.65 10 B 24.43 25.25 26.06 26.88 27.69 28.51 29.32 30.13 30.95 31.76 O 36.65 36.65 36.65 36.65 36.65 36.65 36.65 36.65 36.65 36.65 11 B 26.85 27.74 28.64 29.53 30.43 31.32 32.22 33.11 34.01 34.90 O 36.65 36.65 36.65 36.65 36.65 36.65 36.65 36.65 36.65 36.65 12 B 32.18 33.25 34.32 35.39 36.47 37.54 38.61 39.68 40.76 41.83 O 36.65 36.65 36.65 36.65 36.65 37.54 38.61 39.68 40.76 41.83 13 B 38.26 39.54 40.81 42.09 43.36 44.64 45.91 47.19 48.46 49.74 O 38.26 39.54 40.81 42.09 43.36 44.64 45.91 47.19 48.46 49.74 14 B 45.21 46.72 48.23 49.74 51.24 52.75 54.26 55.76 57.27 58.78 O 45.21 46.72 48.23 49.74 51.24 52.75 54.26 55.76 57.27 58.78 15 B 53.19 54.96 56.73 58.50 60.28 62.05 63.82 65.59 67.37 68.52 O 53.19 54.96 56.73 58.50 60.28 62.05 63.82 65.59 67.37 68.52 * Rate limited to the rate for level IV of the Executive Schedule (5 U.S.C. 5304 (g)(1)). 2006-HOU INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 26.37% FOR THE LOCALITY PAY AREA OF HOUSTON-BAYTOWN-HUNTSVILLE, TX (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.41%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.90 10.23 10.56 10.89 11.22 11.41 11.74 12.06 12.08 12.38 O 14.85 15.35 15.84 16.34 16.83 17.12 17.61 18.09 18.12 18.57 2 B 11.13 11.40 11.77 12.08 12.21 12.57 12.93 13.29 13.65 14.01 O 16.70 17.10 17.66 18.12 18.32 18.86 19.40 19.94 20.48 21.02 3 B 12.15 12.55 12.96 13.36 13.77 14.17 14.58 14.98 15.39 15.79 O 18.23 18.83 19.44 20.04 20.66 21.26 21.87 22.47 23.09 23.69 4 B 13.64 14.09 14.54 15.00 15.45 15.91 16.36 16.82 17.27 17.73 O 20.46 21.14 21.81 22.50 23.18 23.87 24.54 25.23 25.91 26.60 5 B 15.26 15.76 16.27 16.78 17.29 17.80 18.31 18.82 19.32 19.83 O 22.89 23.64 24.41 25.17 25.94 26.70 27.47 28.23 28.98 29.75 6 B 17.01 17.57 18.14 18.71 19.27 19.84 20.41 20.97 21.54 22.11 O 25.52 26.36 27.21 28.07 28.91 29.76 30.62 31.46 32.31 33.17 7 B 18.90 19.53 20.16 20.79 21.42 22.05 22.68 23.31 23.94 24.56 O 28.35 29.30 30.24 31.19 32.13 33.08 34.02 34.97 35.91 36.84 8 B 20.93 21.63 22.32 23.02 23.72 24.42 25.11 25.81 26.51 27.21 O 31.40 32.45 33.48 34.53 35.58 36.63 37.67 38.19 38.19 38.19 9 B 23.12 23.89 24.66 25.43 26.20 26.97 27.74 28.51 29.28 30.05 O 34.68 35.84 36.99 38.15 38.19 38.19 38.19 38.19 38.19 38.19 10 B 25.46 26.30 27.15 28.00 28.85 29.70 30.55 31.39 32.24 33.09 O 38.19 38.19 38.19 38.19 38.19 38.19 38.19 38.19 38.19 38.19 11 B 27.97 28.90 29.83 30.77 31.70 32.63 33.56 34.50 35.43 36.36 O 38.19 38.19 38.19 38.19 38.19 38.19 38.19 38.19 38.19 38.19 12 B 33.52 34.64 35.76 36.87 37.99 39.11 40.22 41.34 42.46 43.58 O 38.19 38.19 38.19 38.19 38.19 39.11 40.22 41.34 42.46 43.58 13 B 39.86 41.19 42.52 43.85 45.18 46.50 47.83 49.16 50.49 51.82 O 39.86 41.19 42.52 43.85 45.18 46.50 47.83 49.16 50.49 51.82 14 B 47.10 48.67 50.24 51.81 53.38 54.95 56.53 58.09 59.67 61.24 O 47.10 48.67 50.24 51.81 53.38 54.95 56.53 58.09 59.67 61.24 15 B 55.41 57.26 59.10 60.95 62.80 64.64 66.49 68.34 68.52 68.52 O 55.41 57.26 59.10 60.95 62.80 64.64 66.49 68.34 68.52 68.52 * Rate limited to the rate for level IV of the Executive Schedule (5 U.S.C. 5304 (g)(1)). 2006-HNT INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 13.35% FOR THE LOCALITY PAY AREA OF HUNTSVILLE-DECATUR, AL (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 2.94%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 8.88 9.18 9.47 9.77 10.06 10.24 10.53 10.82 10.83 11.11 O 13.32 13.77 14.21 14.66 15.09 15.36 15.80 16.23 16.25 16.67 2 B 9.99 10.22 10.55 10.83 10.95 11.28 11.60 11.92 12.24 12.56 O 14.99 15.33 15.83 16.25 16.43 16.92 17.40 17.88 18.36 18.84 3 B 10.90 11.26 11.62 11.99 12.35 12.71 13.08 13.44 13.80 14.17 O 16.35 16.89 17.43 17.99 18.53 19.07 19.62 20.16 20.70 21.26 4 B 12.23 12.64 13.05 13.45 13.86 14.27 14.68 15.09 15.49 15.90 O 18.35 18.96 19.58 20.18 20.79 21.41 22.02 22.64 23.24 23.85 5 B 13.68 14.14 14.60 15.05 15.51 15.97 16.42 16.88 17.33 17.79 O 20.52 21.21 21.90 22.58 23.27 23.96 24.63 25.32 26.00 26.69 6 B 15.25 15.76 16.27 16.78 17.29 17.80 18.30 18.81 19.32 19.83 O 22.88 23.64 24.41 25.17 25.94 26.70 27.45 28.22 28.98 29.75 7 B 16.95 17.52 18.08 18.64 19.21 19.77 20.34 20.90 21.47 22.03 O 25.43 26.28 27.12 27.96 28.82 29.66 30.51 31.35 32.21 33.05 8 B 18.77 19.40 20.02 20.65 21.27 21.90 22.53 23.15 23.78 24.40 O 28.16 29.10 30.03 30.98 31.91 32.85 33.80 34.25 34.25 34.25 9 B 20.73 21.43 22.12 22.81 23.50 24.19 24.88 25.57 26.26 26.96 O 31.10 32.15 33.18 34.22 34.25 34.25 34.25 34.25 34.25 34.25 10 B 22.83 23.59 24.35 25.12 25.88 26.64 27.40 28.16 28.92 29.68 O 34.25 34.25 34.25 34.25 34.25 34.25 34.25 34.25 34.25 34.25 11 B 25.09 25.92 26.76 27.60 28.43 29.27 30.10 30.94 31.78 32.61 O 34.25 34.25 34.25 34.25 34.25 34.25 34.25 34.25 34.25 34.25 12 B 30.07 31.07 32.07 33.07 34.08 35.08 36.08 37.08 38.08 39.09 O 34.25 34.25 34.25 34.25 34.25 35.08 36.08 37.08 38.08 39.09 13 B 35.76 36.95 38.14 39.33 40.52 41.71 42.90 44.10 45.29 46.48 O 35.76 36.95 38.14 39.33 40.52 41.71 42.90 44.10 45.29 46.48 14 B 42.25 43.66 45.07 46.48 47.88 49.29 50.70 52.11 53.52 54.93 O 42.25 43.66 45.07 46.48 47.88 49.29 50.70 52.11 53.52 54.93 15 B 49.70 51.36 53.01 54.67 56.33 57.98 59.64 61.30 62.95 64.61 O 49.70 51.36 53.01 54.67 56.33 57.98 59.64 61.30 62.95 64.61 2006-IND INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 12.85% FOR THE LOCALITY PAY AREA OF INDIANAPOLIS-ANDERSON-COLUMBUS, IN (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 2.87%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 8.84 9.14 9.43 9.72 10.02 10.19 10.48 10.77 10.79 11.06 O 13.26 13.71 14.15 14.58 15.03 15.29 15.72 16.16 16.19 16.59 2 B 9.94 10.18 10.51 10.79 10.91 11.23 11.55 11.87 12.19 12.51 O 14.91 15.27 15.77 16.19 16.37 16.85 17.33 17.81 18.29 18.77 3 B 10.85 11.21 11.57 11.93 12.29 12.66 13.02 13.38 13.74 14.10 O 16.28 16.82 17.36 17.90 18.44 18.99 19.53 20.07 20.61 21.15 4 B 12.18 12.58 12.99 13.39 13.80 14.21 14.61 15.02 15.43 15.83 O 18.27 18.87 19.49 20.09 20.70 21.32 21.92 22.53 23.15 23.75 5 B 13.62 14.08 14.53 14.99 15.44 15.89 16.35 16.80 17.26 17.71 O 20.43 21.12 21.80 22.49 23.16 23.84 24.53 25.20 25.89 26.57 6 B 15.19 15.69 16.20 16.70 17.21 17.72 18.22 18.73 19.24 19.74 O 22.79 23.54 24.30 25.05 25.82 26.58 27.33 28.10 28.86 29.61 7 B 16.88 17.44 18.00 18.56 19.13 19.69 20.25 20.81 21.37 21.94 O 25.32 26.16 27.00 27.84 28.70 29.54 30.38 31.22 32.06 32.91 8 B 18.69 19.31 19.93 20.56 21.18 21.80 22.43 23.05 23.67 24.30 O 28.04 28.97 29.90 30.84 31.77 32.70 33.65 34.10 34.10 34.10 9 B 20.64 21.33 22.02 22.71 23.40 24.08 24.77 25.46 26.15 26.84 O 30.96 32.00 33.03 34.07 34.10 34.10 34.10 34.10 34.10 34.10 10 B 22.73 23.49 24.25 25.00 25.76 26.52 27.28 28.03 28.79 29.55 O 34.10 34.10 34.10 34.10 34.10 34.10 34.10 34.10 34.10 34.10 11 B 24.98 25.81 26.64 27.47 28.31 29.14 29.97 30.80 31.64 32.47 O 34.10 34.10 34.10 34.10 34.10 34.10 34.10 34.10 34.10 34.10 12 B 29.93 30.93 31.93 32.93 33.93 34.92 35.92 36.92 37.92 38.91 O 34.10 34.10 34.10 34.10 34.10 34.92 35.92 36.92 37.92 38.91 13 B 35.60 36.78 37.97 39.16 40.34 41.53 42.72 43.90 45.09 46.27 O 35.60 36.78 37.97 39.16 40.34 41.53 42.72 43.90 45.09 46.27 14 B 42.06 43.47 44.87 46.27 47.67 49.08 50.48 51.88 53.28 54.68 O 42.06 43.47 44.87 46.27 47.67 49.08 50.48 51.88 53.28 54.68 15 B 49.48 51.13 52.78 54.43 56.08 57.73 59.38 61.02 62.67 64.32 O 49.48 51.13 52.78 54.43 56.08 57.73 59.38 61.02 62.67 64.32 2006-LA INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 23.18% FOR THE LOCALITY PAY AREA OF LOS ANGELES-LONG BEACH-RIVERSIDE, CA (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.38%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.65 9.97 10.29 10.61 10.94 11.12 11.44 11.76 11.77 12.07 O 14.48 14.96 15.44 15.92 16.41 16.68 17.16 17.64 17.66 18.11 2 B 10.85 11.11 11.47 11.77 11.90 12.25 12.60 12.95 13.30 13.65 O 16.28 16.67 17.21 17.66 17.85 18.38 18.90 19.43 19.95 20.48 3 B 11.84 12.23 12.63 13.02 13.42 13.81 14.21 14.60 15.00 15.39 O 17.76 18.35 18.95 19.53 20.13 20.72 21.32 21.90 22.50 23.09 4 B 13.29 13.73 14.18 14.62 15.06 15.51 15.95 16.39 16.84 17.28 O 19.94 20.60 21.27 21.93 22.59 23.27 23.93 24.59 25.26 25.92 5 B 14.87 15.37 15.86 16.36 16.85 17.35 17.85 18.34 18.84 19.33 O 22.31 23.06 23.79 24.54 25.28 26.03 26.78 27.51 28.26 29.00 6 B 16.58 17.13 17.68 18.23 18.79 19.34 19.89 20.44 21.00 21.55 O 24.87 25.70 26.52 27.35 28.19 29.01 29.84 30.66 31.50 32.33 7 B 18.42 19.03 19.65 20.26 20.88 21.49 22.10 22.72 23.33 23.94 O 27.63 28.55 29.48 30.39 31.32 32.24 33.15 34.08 35.00 35.91 8 B 20.40 21.08 21.76 22.44 23.12 23.80 24.48 25.16 25.84 26.52 O 30.60 31.62 32.64 33.66 34.68 35.70 36.72 37.22 37.22 37.22 9 B 22.53 23.28 24.03 24.79 25.54 26.29 27.04 27.79 28.54 29.29 O 33.80 34.92 36.05 37.19 37.22 37.22 37.22 37.22 37.22 37.22 10 B 24.81 25.64 26.47 27.29 28.12 28.95 29.77 30.60 31.43 32.26 O 37.22 37.22 37.22 37.22 37.22 37.22 37.22 37.22 37.22 37.22 11 B 27.26 28.17 29.08 29.99 30.90 31.81 32.72 33.62 34.53 35.44 O 37.22 37.22 37.22 37.22 37.22 37.22 37.22 37.22 37.22 37.22 12 B 32.67 33.76 34.85 35.94 37.03 38.12 39.21 40.30 41.39 42.48 O 37.22 37.22 37.22 37.22 37.22 38.12 39.21 40.30 41.39 42.48 13 B 38.86 40.15 41.45 42.74 44.04 45.33 46.63 47.92 49.22 50.51 O 38.86 40.15 41.45 42.74 44.04 45.33 46.63 47.92 49.22 50.51 14 B 45.92 47.45 48.98 50.51 52.04 53.57 55.10 56.63 58.16 59.69 O 45.92 47.45 48.98 50.51 52.04 53.57 55.10 56.63 58.16 59.69 15 B 54.01 55.81 57.61 59.41 61.21 63.01 64.81 66.61 68.41 68.52 O 54.01 55.81 57.61 59.41 61.21 63.01 64.81 66.61 68.41 68.52 * Rate limited to the rate for level IV of the Executive Schedule (5 U.S.C. 5304 (g)(1)). 2006-MFL INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 17.84% FOR THE LOCALITY PAY AREA OF MIAMI-FORT LAUDERDALE-MIAMI BEACH, FL (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.04%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.23 9.54 9.85 10.15 10.46 10.64 10.94 11.25 11.26 11.55 O 13.85 14.31 14.78 15.23 15.69 15.96 16.41 16.88 16.89 17.33 2 B 10.38 10.63 10.97 11.26 11.39 11.72 12.06 12.39 12.73 13.06 O 15.57 15.95 16.46 16.89 17.09 17.58 18.09 18.59 19.10 19.59 3 B 11.33 11.70 12.08 12.46 12.84 13.22 13.59 13.97 14.35 14.73 O 17.00 17.55 18.12 18.69 19.26 19.83 20.39 20.96 21.53 22.10 4 B 12.71 13.14 13.56 13.99 14.41 14.84 15.26 15.68 16.11 16.53 O 19.07 19.71 20.34 20.99 21.62 22.26 22.89 23.52 24.17 24.80 5 B 14.23 14.70 15.17 15.65 16.12 16.60 17.07 17.55 18.02 18.49 O 21.35 22.05 22.76 23.48 24.18 24.90 25.61 26.33 27.03 27.74 6 B 15.86 16.39 16.91 17.44 17.97 18.50 19.03 19.56 20.09 20.61 O 23.79 24.59 25.37 26.16 26.96 27.75 28.55 29.34 30.14 30.92 7 B 17.62 18.21 18.80 19.38 19.97 20.56 21.15 21.73 22.32 22.91 O 26.43 27.32 28.20 29.07 29.96 30.84 31.73 32.60 33.48 34.37 8 B 19.52 20.17 20.82 21.47 22.12 22.77 23.42 24.07 24.72 25.37 O 29.28 30.26 31.23 32.21 33.18 34.16 35.13 35.61 35.61 35.61 9 B 21.55 22.27 22.99 23.71 24.43 25.15 25.87 26.59 27.31 28.02 O 32.33 33.41 34.49 35.57 35.61 35.61 35.61 35.61 35.61 35.61 10 B 23.74 24.53 25.32 26.11 26.90 27.69 28.48 29.28 30.07 30.86 O 35.61 35.61 35.61 35.61 35.61 35.61 35.61 35.61 35.61 35.61 11 B 26.08 26.95 27.82 28.69 29.56 30.43 31.30 32.17 33.04 33.91 O 35.61 35.61 35.61 35.61 35.61 35.61 35.61 35.61 35.61 35.61 12 B 31.26 32.30 33.34 34.38 35.43 36.47 37.51 38.55 39.59 40.63 O 35.61 35.61 35.61 35.61 35.61 36.47 37.51 38.55 39.59 40.63 13 B 37.17 38.41 39.65 40.89 42.13 43.37 44.60 45.84 47.08 48.32 O 37.17 38.41 39.65 40.89 42.13 43.37 44.60 45.84 47.08 48.32 14 B 43.92 45.39 46.85 48.32 49.78 51.25 52.71 54.17 55.64 57.10 O 43.92 45.39 46.85 48.32 49.78 51.25 52.71 54.17 55.64 57.10 15 B 51.67 53.39 55.11 56.83 58.56 60.28 62.00 63.72 65.45 67.17 O 51.67 53.39 55.11 56.83 58.56 60.28 62.00 63.72 65.45 67.17 2006-MIL INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 14.74% FOR THE LOCALITY PAY AREA OF MILWAUKEE-RACINE-WAUKESHA, WI (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.11%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 8.99 9.29 9.59 9.89 10.19 10.36 10.66 10.95 10.97 11.24 O 13.49 13.94 14.39 14.84 15.29 15.54 15.99 16.43 16.46 16.86 2 B 10.11 10.35 10.68 10.97 11.09 11.41 11.74 12.07 12.39 12.72 O 15.17 15.53 16.02 16.46 16.64 17.12 17.61 18.11 18.59 19.08 3 B 11.03 11.40 11.76 12.13 12.50 12.87 13.24 13.60 13.97 14.34 O 16.55 17.10 17.64 18.20 18.75 19.31 19.86 20.40 20.96 21.51 4 B 12.38 12.79 13.21 13.62 14.03 14.45 14.86 15.27 15.68 16.10 O 18.57 19.19 19.82 20.43 21.05 21.68 22.29 22.91 23.52 24.15 5 B 13.85 14.31 14.78 15.24 15.70 16.16 16.62 17.08 17.55 18.01 O 20.78 21.47 22.17 22.86 23.55 24.24 24.93 25.62 26.33 27.02 6 B 15.44 15.96 16.47 16.98 17.50 18.01 18.53 19.04 19.56 20.07 O 23.16 23.94 24.71 25.47 26.25 27.02 27.80 28.56 29.34 30.11 7 B 17.16 17.73 18.30 18.87 19.45 20.02 20.59 21.16 21.73 22.30 O 25.74 26.60 27.45 28.31 29.18 30.03 30.89 31.74 32.60 33.45 8 B 19.00 19.64 20.27 20.90 21.54 22.17 22.80 23.44 24.07 24.70 O 28.50 29.46 30.41 31.35 32.31 33.26 34.20 34.67 34.67 34.67 9 B 20.99 21.69 22.39 23.09 23.79 24.49 25.19 25.89 26.59 27.29 O 31.49 32.54 33.59 34.64 34.67 34.67 34.67 34.67 34.67 34.67 10 B 23.11 23.88 24.65 25.42 26.19 26.96 27.73 28.50 29.28 30.05 O 34.67 34.67 34.67 34.67 34.67 34.67 34.67 34.67 34.67 34.67 11 B 25.39 26.24 27.09 27.93 28.78 29.63 30.47 31.32 32.17 33.01 O 34.67 34.67 34.67 34.67 34.67 34.67 34.67 34.67 34.67 34.67 12 B 30.44 31.45 32.46 33.48 34.49 35.51 36.52 37.54 38.55 39.57 O 34.67 34.67 34.67 34.67 34.67 35.51 36.52 37.54 38.55 39.57 13 B 36.19 37.40 38.61 39.81 41.02 42.22 43.43 44.64 45.84 47.05 O 36.19 37.40 38.61 39.81 41.02 42.22 43.43 44.64 45.84 47.05 14 B 42.77 44.20 45.62 47.05 48.47 49.90 51.32 52.75 54.17 55.60 O 42.77 44.20 45.62 47.05 48.47 49.90 51.32 52.75 54.17 55.60 15 B 50.31 51.99 53.66 55.34 57.02 58.69 60.37 62.05 63.72 65.40 O 50.31 51.99 53.66 55.34 57.02 58.69 60.37 62.05 63.72 65.40 2006-MSP INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 17.31% FOR THE LOCALITY PAY AREA OF MINNEAPOLIS-ST. PAUL-ST. CLOUD, MN-WI (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.26%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.19 9.50 9.80 10.11 10.41 10.59 10.90 11.20 11.21 11.49 O 13.79 14.25 14.70 15.17 15.62 15.89 16.35 16.80 16.82 17.24 2 B 10.33 10.58 10.92 11.21 11.34 11.67 12.00 12.34 12.67 13.00 O 15.50 15.87 16.38 16.82 17.01 17.51 18.00 18.51 19.01 19.50 3 B 11.28 11.65 12.03 12.40 12.78 13.16 13.53 13.91 14.28 14.66 O 16.92 17.48 18.05 18.60 19.17 19.74 20.30 20.87 21.42 21.99 4 B 12.66 13.08 13.50 13.92 14.35 14.77 15.19 15.61 16.03 16.46 O 18.99 19.62 20.25 20.88 21.53 22.16 22.79 23.42 24.05 24.69 5 B 14.16 14.63 15.11 15.58 16.05 16.52 17.00 17.47 17.94 18.41 O 21.24 21.95 22.67 23.37 24.08 24.78 25.50 26.21 26.91 27.62 6 B 15.79 16.31 16.84 17.37 17.89 18.42 18.94 19.47 20.00 20.52 O 23.69 24.47 25.26 26.06 26.84 27.63 28.41 29.21 30.00 30.78 7 B 17.54 18.13 18.71 19.30 19.88 20.47 21.05 21.63 22.22 22.80 O 26.31 27.20 28.07 28.95 29.82 30.71 31.58 32.45 33.33 34.20 8 B 19.43 20.08 20.72 21.37 22.02 22.67 23.31 23.96 24.61 25.26 O 29.15 30.12 31.08 32.06 33.03 34.01 34.97 35.45 35.45 35.45 9 B 21.46 22.17 22.89 23.60 24.32 25.04 25.75 26.47 27.18 27.90 O 32.19 33.26 34.34 35.40 35.45 35.45 35.45 35.45 35.45 35.45 10 B 23.63 24.42 25.21 25.99 26.78 27.57 28.36 29.14 29.93 30.72 O 35.45 35.45 35.45 35.45 35.45 35.45 35.45 35.45 35.45 35.45 11 B 25.96 26.83 27.69 28.56 29.43 30.29 31.16 32.02 32.89 33.75 O 35.45 35.45 35.45 35.45 35.45 35.45 35.45 35.45 35.45 35.45 12 B 31.12 32.15 33.19 34.23 35.27 36.30 37.34 38.38 39.41 40.45 O 35.45 35.45 35.45 35.45 35.45 36.30 37.34 38.38 39.41 40.45 13 B 37.00 38.24 39.47 40.70 41.94 43.17 44.40 45.64 46.87 48.10 O 37.00 38.24 39.47 40.70 41.94 43.17 44.40 45.64 46.87 48.10 14 B 43.73 45.18 46.64 48.10 49.56 51.01 52.47 53.93 55.39 56.85 O 43.73 45.18 46.64 48.10 49.56 51.01 52.47 53.93 55.39 56.85 15 B 51.44 53.15 54.86 56.58 58.29 60.01 61.72 63.44 65.15 66.87 O 51.44 53.15 54.86 56.58 58.29 60.01 61.72 63.44 65.15 66.87 2006-NY INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 22.97% FOR THE LOCALITY PAY AREA OF NEW YORK-NEWARK-BRIDGEPORT, NY-NJ-CT-PA (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.77%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.63 9.96 10.28 10.60 10.92 11.10 11.42 11.74 11.75 12.05 O 14.45 14.94 15.42 15.90 16.38 16.65 17.13 17.61 17.63 18.08 2 B 10.83 11.09 11.45 11.75 11.88 12.23 12.58 12.93 13.28 13.63 O 16.25 16.64 17.18 17.63 17.82 18.35 18.87 19.40 19.92 20.45 3 B 11.82 12.21 12.61 13.00 13.40 13.79 14.18 14.58 14.97 15.37 O 17.73 18.32 18.92 19.50 20.10 20.69 21.27 21.87 22.46 23.06 4 B 13.27 13.71 14.15 14.60 15.04 15.48 15.92 16.37 16.81 17.25 O 19.91 20.57 21.23 21.90 22.56 23.22 23.88 24.56 25.22 25.88 5 B 14.85 15.34 15.84 16.33 16.83 17.32 17.82 18.31 18.80 19.30 O 22.28 23.01 23.76 24.50 25.25 25.98 26.73 27.47 28.20 28.95 6 B 16.55 17.10 17.65 18.20 18.75 19.31 19.86 20.41 20.96 21.51 O 24.83 25.65 26.48 27.30 28.13 28.97 29.79 30.62 31.44 32.27 7 B 18.39 19.00 19.61 20.23 20.84 21.45 22.07 22.68 23.29 23.90 O 27.59 28.50 29.42 30.35 31.26 32.18 33.11 34.02 34.94 35.85 8 B 20.37 21.04 21.72 22.40 23.08 23.76 24.44 25.12 25.80 26.47 O 30.56 31.56 32.58 33.60 34.62 35.64 36.66 37.16 37.16 37.16 9 B 22.49 23.24 23.99 24.74 25.49 26.24 26.99 27.74 28.49 29.24 O 33.74 34.86 35.99 37.11 37.16 37.16 37.16 37.16 37.16 37.16 10 B 24.77 25.60 26.42 27.25 28.07 28.90 29.72 30.55 31.37 32.20 O 37.16 37.16 37.16 37.16 37.16 37.16 37.16 37.16 37.16 37.16 11 B 27.22 28.12 29.03 29.94 30.85 31.75 32.66 33.57 34.47 35.38 O 37.16 37.16 37.16 37.16 37.16 37.16 37.16 37.16 37.16 37.16 12 B 32.62 33.71 34.79 35.88 36.97 38.05 39.14 40.23 41.32 42.40 O 37.16 37.16 37.16 37.16 37.16 38.05 39.14 40.23 41.32 42.40 13 B 38.79 40.08 41.38 42.67 43.96 45.25 46.55 47.84 49.13 50.42 O 38.79 40.08 41.38 42.67 43.96 45.25 46.55 47.84 49.13 50.42 14 B 45.84 47.37 48.89 50.42 51.95 53.48 55.00 56.53 58.06 59.59 O 45.84 47.37 48.89 50.42 51.95 53.48 55.00 56.53 58.06 59.59 15 B 53.92 55.71 57.51 59.31 61.11 62.90 64.70 66.50 68.29 68.52 O 53.92 55.71 57.51 59.31 61.11 62.90 64.70 66.50 68.29 68.52 * Rate limited to the rate for level IV of the Executive Schedule (5 U.S.C. 5304 (g)(1)). 2006-PHL INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 18.04% FOR THE LOCALITY PAY AREA OF PHILADELPHIA-CAMDEN-VINELAND, PA-NJ-DE-MD (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.30%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.25 9.56 9.87 10.17 10.48 10.66 10.96 11.27 11.28 11.57 O 13.88 14.34 14.81 15.26 15.72 15.99 16.44 16.91 16.92 17.36 2 B 10.40 10.65 10.99 11.28 11.41 11.74 12.08 12.41 12.75 13.08 O 15.60 15.98 16.49 16.92 17.12 17.61 18.12 18.62 19.13 19.62 3 B 11.35 11.72 12.10 12.48 12.86 13.24 13.62 13.99 14.37 14.75 O 17.03 17.58 18.15 18.72 19.29 19.86 20.43 20.99 21.56 22.13 4 B 12.74 13.16 13.59 14.01 14.44 14.86 15.29 15.71 16.13 16.56 O 19.11 19.74 20.39 21.02 21.66 22.29 22.94 23.57 24.20 24.84 5 B 14.25 14.73 15.20 15.68 16.15 16.63 17.10 17.58 18.05 18.53 O 21.38 22.10 22.80 23.52 24.23 24.95 25.65 26.37 27.08 27.80 6 B 15.89 16.41 16.94 17.47 18.00 18.53 19.06 19.59 20.12 20.65 O 23.84 24.62 25.41 26.21 27.00 27.80 28.59 29.39 30.18 30.98 7 B 17.65 18.24 18.83 19.42 20.00 20.59 21.18 21.77 22.36 22.95 O 26.48 27.36 28.25 29.13 30.00 30.89 31.77 32.66 33.54 34.43 8 B 19.55 20.20 20.85 21.50 22.15 22.81 23.46 24.11 24.76 25.41 O 29.33 30.30 31.28 32.25 33.23 34.22 35.19 35.67 35.67 35.67 9 B 21.59 22.31 23.03 23.75 24.47 25.19 25.91 26.63 27.35 28.07 O 32.39 33.47 34.55 35.63 35.67 35.67 35.67 35.67 35.67 35.67 10 B 23.78 24.57 25.36 26.15 26.95 27.74 28.53 29.32 30.12 30.91 O 35.67 35.67 35.67 35.67 35.67 35.67 35.67 35.67 35.67 35.67 11 B 26.12 27.00 27.87 28.74 29.61 30.48 31.35 32.22 33.09 33.96 O 35.67 35.67 35.67 35.67 35.67 35.67 35.67 35.67 35.67 35.67 12 B 31.31 32.36 33.40 34.44 35.49 36.53 37.57 38.62 39.66 40.70 O 35.67 35.67 35.67 35.67 35.67 36.53 37.57 38.62 39.66 40.70 13 B 37.23 38.48 39.72 40.96 42.20 43.44 44.68 45.92 47.16 48.40 O 37.23 38.48 39.72 40.96 42.20 43.44 44.68 45.92 47.16 48.40 14 B 44.00 45.47 46.93 48.40 49.87 51.33 52.80 54.27 55.73 57.20 O 44.00 45.47 46.93 48.40 49.87 51.33 52.80 54.27 55.73 57.20 15 B 51.76 53.48 55.21 56.93 58.66 60.38 62.11 63.83 65.56 67.28 O 51.76 53.48 55.21 56.93 58.66 60.38 62.11 63.83 65.56 67.28 2006-PX INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 12.65% FOR THE LOCALITY PAY AREA OF PHOENIX-MESA-SCOTTSDALE, AZ (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 2.95%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 8.83 9.12 9.41 9.71 10.00 10.17 10.46 10.76 10.77 11.04 O 13.25 13.68 14.12 14.57 15.00 15.26 15.69 16.14 16.16 16.56 2 B 9.92 10.16 10.49 10.77 10.89 11.21 11.53 11.85 12.17 12.49 O 14.88 15.24 15.74 16.16 16.34 16.82 17.30 17.78 18.26 18.74 3 B 10.83 11.19 11.55 11.91 12.27 12.63 12.99 13.36 13.72 14.08 O 16.25 16.79 17.33 17.87 18.41 18.95 19.49 20.04 20.58 21.12 4 B 12.16 12.56 12.97 13.37 13.78 14.18 14.59 14.99 15.40 15.80 O 18.24 18.84 19.46 20.06 20.67 21.27 21.89 22.49 23.10 23.70 5 B 13.60 14.05 14.51 14.96 15.41 15.87 16.32 16.77 17.23 17.68 O 20.40 21.08 21.77 22.44 23.12 23.81 24.48 25.16 25.85 26.52 6 B 15.16 15.66 16.17 16.68 17.18 17.69 18.19 18.70 19.20 19.71 O 22.74 23.49 24.26 25.02 25.77 26.54 27.29 28.05 28.80 29.57 7 B 16.85 17.41 17.97 18.53 19.09 19.65 20.21 20.78 21.34 21.90 O 25.28 26.12 26.96 27.80 28.64 29.48 30.32 31.17 32.01 32.85 8 B 18.66 19.28 19.90 20.52 21.14 21.77 22.39 23.01 23.63 24.25 O 27.99 28.92 29.85 30.78 31.71 32.66 33.59 34.04 34.04 34.04 9 B 20.61 21.29 21.98 22.67 23.35 24.04 24.73 25.42 26.10 26.79 O 30.92 31.94 32.97 34.01 34.04 34.04 34.04 34.04 34.04 34.04 10 B 22.69 23.45 24.20 24.96 25.72 26.47 27.23 27.99 28.74 29.50 O 34.04 34.04 34.04 34.04 34.04 34.04 34.04 34.04 34.04 34.04 11 B 24.93 25.76 26.59 27.43 28.26 29.09 29.92 30.75 31.58 32.41 O 34.04 34.04 34.04 34.04 34.04 34.04 34.04 34.04 34.04 34.04 12 B 29.88 30.88 31.87 32.87 33.87 34.86 35.86 36.85 37.85 38.84 O 34.04 34.04 34.04 34.04 34.04 34.86 35.86 36.85 37.85 38.84 13 B 35.53 36.72 37.90 39.09 40.27 41.46 42.64 43.82 45.01 46.19 O 35.53 36.72 37.90 39.09 40.27 41.46 42.64 43.82 45.01 46.19 14 B 41.99 43.39 44.79 46.19 47.59 48.99 50.39 51.79 53.19 54.59 O 41.99 43.39 44.79 46.19 47.59 48.99 50.39 51.79 53.19 54.59 15 B 49.39 51.04 52.69 54.33 55.98 57.62 59.27 60.92 62.56 64.21 O 49.39 51.04 52.69 54.33 55.98 57.62 59.27 60.92 62.56 64.21 2006-PIT INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 13.81% FOR THE LOCALITY PAY AREA OF PITTSBURGH-NEW CASTLE, PA (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 2.96%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 8.92 9.22 9.51 9.81 10.10 10.28 10.57 10.87 10.88 11.15 O 13.38 13.83 14.27 14.72 15.15 15.42 15.86 16.31 16.32 16.73 2 B 10.03 10.26 10.60 10.88 11.00 11.32 11.65 11.97 12.29 12.62 O 15.05 15.39 15.90 16.32 16.50 16.98 17.48 17.96 18.44 18.93 3 B 10.94 11.30 11.67 12.03 12.40 12.76 13.13 13.49 13.86 14.22 O 16.41 16.95 17.51 18.05 18.60 19.14 19.70 20.24 20.79 21.33 4 B 12.28 12.69 13.10 13.51 13.92 14.33 14.74 15.15 15.56 15.97 O 18.42 19.04 19.65 20.27 20.88 21.50 22.11 22.73 23.34 23.96 5 B 13.74 14.20 14.66 15.11 15.57 16.03 16.49 16.95 17.40 17.86 O 20.61 21.30 21.99 22.67 23.36 24.05 24.74 25.43 26.10 26.79 6 B 15.32 15.83 16.34 16.85 17.36 17.87 18.38 18.89 19.40 19.91 O 22.98 23.75 24.51 25.28 26.04 26.81 27.57 28.34 29.10 29.87 7 B 17.02 17.59 18.15 18.72 19.29 19.85 20.42 20.99 21.56 22.12 O 25.53 26.39 27.23 28.08 28.94 29.78 30.63 31.49 32.34 33.18 8 B 18.85 19.48 20.10 20.73 21.36 21.99 22.62 23.25 23.87 24.50 O 28.28 29.22 30.15 31.10 32.04 32.99 33.93 34.40 34.40 34.40 9 B 20.82 21.51 22.21 22.90 23.59 24.29 24.98 25.68 26.37 27.07 O 31.23 32.27 33.32 34.35 34.40 34.40 34.40 34.40 34.40 34.40 10 B 22.93 23.69 24.45 25.22 25.98 26.75 27.51 28.27 29.04 29.80 O 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 11 B 25.19 26.03 26.87 27.71 28.55 29.39 30.23 31.07 31.91 32.75 O 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 34.40 12 B 30.19 31.20 32.20 33.21 34.21 35.22 36.23 37.23 38.24 39.24 O 34.40 34.40 34.40 34.40 34.40 35.22 36.23 37.23 38.24 39.24 13 B 35.90 37.10 38.29 39.49 40.69 41.88 43.08 44.28 45.47 46.67 O 35.90 37.10 38.29 39.49 40.69 41.88 43.08 44.28 45.47 46.67 14 B 42.42 43.84 45.25 46.66 48.08 49.49 50.91 52.32 53.74 55.15 O 42.42 43.84 45.25 46.66 48.08 49.49 50.91 52.32 53.74 55.15 15 B 49.90 51.56 53.23 54.89 56.55 58.22 59.88 61.54 63.21 64.87 O 49.90 51.56 53.23 54.89 56.55 58.22 59.88 61.54 63.21 64.87 2006-POR INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 17.16% FOR THE LOCALITY PAY AREA OF PORTLAND-VANCOUVER-BEAVERTON, OR-WA (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.18%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.18 9.49 9.79 10.10 10.40 10.58 10.88 11.19 11.20 11.48 O 13.77 14.24 14.69 15.15 15.60 15.87 16.32 16.79 16.80 17.22 2 B 10.32 10.57 10.91 11.20 11.32 11.66 11.99 12.32 12.65 12.99 O 15.48 15.86 16.37 16.80 16.98 17.49 17.99 18.48 18.98 19.49 3 B 11.26 11.64 12.01 12.39 12.76 13.14 13.51 13.89 14.27 14.64 O 16.89 17.46 18.02 18.59 19.14 19.71 20.27 20.84 21.41 21.96 4 B 12.64 13.06 13.48 13.91 14.33 14.75 15.17 15.59 16.01 16.44 O 18.96 19.59 20.22 20.87 21.50 22.13 22.76 23.39 24.02 24.66 5 B 14.14 14.62 15.09 15.56 16.03 16.50 16.97 17.44 17.92 18.39 O 21.21 21.93 22.64 23.34 24.05 24.75 25.46 26.16 26.88 27.59 6 B 15.77 16.29 16.82 17.34 17.87 18.39 18.92 19.44 19.97 20.50 O 23.66 24.44 25.23 26.01 26.81 27.59 28.38 29.16 29.96 30.75 7 B 17.52 18.10 18.69 19.27 19.86 20.44 21.02 21.61 22.19 22.77 O 26.28 27.15 28.04 28.91 29.79 30.66 31.53 32.42 33.29 34.16 8 B 19.40 20.05 20.70 21.34 21.99 22.64 23.28 23.93 24.58 25.22 O 29.10 30.08 31.05 32.01 32.99 33.96 34.92 35.40 35.40 35.40 9 B 21.43 22.15 22.86 23.57 24.29 25.00 25.72 26.43 27.15 27.86 O 32.15 33.23 34.29 35.36 35.40 35.40 35.40 35.40 35.40 35.40 10 B 23.60 24.39 25.17 25.96 26.75 27.53 28.32 29.11 29.89 30.68 O 35.40 35.40 35.40 35.40 35.40 35.40 35.40 35.40 35.40 35.40 11 B 25.93 26.79 27.66 28.52 29.39 30.25 31.12 31.98 32.85 33.71 O 35.40 35.40 35.40 35.40 35.40 35.40 35.40 35.40 35.40 35.40 12 B 31.08 32.11 33.15 34.19 35.22 36.26 37.29 38.33 39.36 40.40 O 35.40 35.40 35.40 35.40 35.40 36.26 37.29 38.33 39.36 40.40 13 B 36.96 38.19 39.42 40.65 41.88 43.11 44.35 45.58 46.81 48.04 O 36.96 38.19 39.42 40.65 41.88 43.11 44.35 45.58 46.81 48.04 14 B 43.67 45.13 46.58 48.04 49.49 50.95 52.41 53.86 55.32 56.77 O 43.67 45.13 46.58 48.04 49.49 50.95 52.41 53.86 55.32 56.77 15 B 51.37 53.08 54.79 56.51 58.22 59.93 61.64 63.36 65.07 66.78 O 51.37 53.08 54.79 56.51 58.22 59.93 61.64 63.36 65.07 66.78 2006-RA INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 15.57% FOR THE LOCALITY PAY AREA OF RALEIGH-DURHAM-CARY, NC (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 5.62%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.06 9.36 9.66 9.96 10.26 10.44 10.73 11.03 11.05 11.32 O 13.59 14.04 14.49 14.94 15.39 15.66 16.10 16.55 16.58 16.98 2 B 10.18 10.42 10.76 11.05 11.17 11.50 11.83 12.15 12.48 12.81 O 15.27 15.63 16.14 16.58 16.76 17.25 17.75 18.23 18.72 19.22 3 B 11.11 11.48 11.85 12.22 12.59 12.96 13.33 13.70 14.07 14.44 O 16.67 17.22 17.78 18.33 18.89 19.44 20.00 20.55 21.11 21.66 4 B 12.47 12.89 13.30 13.72 14.13 14.55 14.97 15.38 15.80 16.21 O 18.71 19.34 19.95 20.58 21.20 21.83 22.46 23.07 23.70 24.32 5 B 13.95 14.42 14.88 15.35 15.81 16.28 16.74 17.21 17.67 18.14 O 20.93 21.63 22.32 23.03 23.72 24.42 25.11 25.82 26.51 27.21 6 B 15.55 16.07 16.59 17.11 17.63 18.14 18.66 19.18 19.70 20.22 O 23.33 24.11 24.89 25.67 26.45 27.21 27.99 28.77 29.55 30.33 7 B 17.28 17.86 18.43 19.01 19.59 20.16 20.74 21.31 21.89 22.47 O 25.92 26.79 27.65 28.52 29.39 30.24 31.11 31.97 32.84 33.71 8 B 19.14 19.78 20.42 21.05 21.69 22.33 22.97 23.61 24.24 24.88 O 28.71 29.67 30.63 31.58 32.54 33.50 34.46 34.92 34.92 34.92 9 B 21.14 21.84 22.55 23.25 23.96 24.66 25.37 26.07 26.78 27.48 O 31.71 32.76 33.83 34.88 34.92 34.92 34.92 34.92 34.92 34.92 10 B 23.28 24.06 24.83 25.61 26.38 27.16 27.93 28.71 29.49 30.26 O 34.92 34.92 34.92 34.92 34.92 34.92 34.92 34.92 34.92 34.92 11 B 25.58 26.43 27.28 28.14 28.99 29.84 30.69 31.55 32.40 33.25 O 34.92 34.92 34.92 34.92 34.92 34.92 34.92 34.92 34.92 34.92 12 B 30.66 31.68 32.70 33.72 34.74 35.76 36.79 37.81 38.83 39.85 O 34.92 34.92 34.92 34.92 34.92 35.76 36.79 37.81 38.83 39.85 13 B 36.46 37.67 38.89 40.10 41.31 42.53 43.75 44.96 46.17 47.39 O 36.46 37.67 38.89 40.10 41.31 42.53 43.75 44.96 46.17 47.39 14 B 43.08 44.51 45.95 47.39 48.82 50.26 51.69 53.13 54.57 56.00 O 43.08 44.51 45.95 47.39 48.82 50.26 51.69 53.13 54.57 56.00 15 B 50.67 52.36 54.05 55.74 57.43 59.12 60.81 62.50 64.18 65.87 O 50.67 52.36 54.05 55.74 57.43 59.12 60.81 62.50 64.18 65.87 2006-RCH INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 14.15% FOR THE LOCALITY PAY AREA OF RICHMOND, VA (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.00%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 8.94 9.24 9.54 9.84 10.13 10.31 10.60 10.90 10.91 11.19 O 13.41 13.86 14.31 14.76 15.20 15.47 15.90 16.35 16.37 16.79 2 B 10.06 10.29 10.63 10.91 11.03 11.36 11.68 12.00 12.33 12.65 O 15.09 15.44 15.95 16.37 16.55 17.04 17.52 18.00 18.50 18.98 3 B 10.97 11.34 11.70 12.07 12.44 12.80 13.17 13.53 13.90 14.26 O 16.46 17.01 17.55 18.11 18.66 19.20 19.76 20.30 20.85 21.39 4 B 12.32 12.73 13.14 13.55 13.96 14.37 14.78 15.19 15.60 16.01 O 18.48 19.10 19.71 20.33 20.94 21.56 22.17 22.79 23.40 24.02 5 B 13.78 14.24 14.70 15.16 15.62 16.08 16.54 17.00 17.46 17.92 O 20.67 21.36 22.05 22.74 23.43 24.12 24.81 25.50 26.19 26.88 6 B 15.36 15.87 16.39 16.90 17.41 17.92 18.43 18.94 19.46 19.97 O 23.04 23.81 24.59 25.35 26.12 26.88 27.65 28.41 29.19 29.96 7 B 17.07 17.64 18.21 18.78 19.35 19.91 20.48 21.05 21.62 22.19 O 25.61 26.46 27.32 28.17 29.03 29.87 30.72 31.58 32.43 33.29 8 B 18.90 19.53 20.16 20.79 21.43 22.06 22.69 23.32 23.95 24.58 O 28.35 29.30 30.24 31.19 32.15 33.09 34.04 34.49 34.49 34.49 9 B 20.88 21.58 22.27 22.97 23.67 24.36 25.06 25.75 26.45 27.15 O 31.32 32.37 33.41 34.46 34.49 34.49 34.49 34.49 34.49 34.49 10 B 22.99 23.76 24.53 25.29 26.06 26.83 27.59 28.36 29.12 29.89 O 34.49 34.49 34.49 34.49 34.49 34.49 34.49 34.49 34.49 34.49 11 B 25.26 26.11 26.95 27.79 28.63 29.47 30.32 31.16 32.00 32.84 O 34.49 34.49 34.49 34.49 34.49 34.49 34.49 34.49 34.49 34.49 12 B 30.28 31.29 32.30 33.31 34.32 35.33 36.33 37.34 38.35 39.36 O 34.49 34.49 34.49 34.49 34.49 35.33 36.33 37.34 38.35 39.36 13 B 36.01 37.21 38.41 39.61 40.81 42.01 43.21 44.41 45.61 46.81 O 36.01 37.21 38.41 39.61 40.81 42.01 43.21 44.41 45.61 46.81 14 B 42.55 43.97 45.39 46.80 48.22 49.64 51.06 52.48 53.90 55.31 O 42.55 43.97 45.39 46.80 48.22 49.64 51.06 52.48 53.90 55.31 15 B 50.05 51.72 53.39 55.06 56.72 58.39 60.06 61.73 63.40 65.06 O 50.05 51.72 53.39 55.06 56.72 58.39 60.06 61.73 63.40 65.06 2006-SAC INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 17.91% FOR THE LOCALITY PAY AREA OF SACRAMENTO--ARDEN-ARCADE--TRUCKEE, CA-NV (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.33%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.24 9.55 9.85 10.16 10.47 10.65 10.95 11.26 11.27 11.55 O 13.86 14.33 14.78 15.24 15.71 15.98 16.43 16.89 16.91 17.33 2 B 10.39 10.63 10.98 11.27 11.39 11.73 12.07 12.40 12.74 13.07 O 15.59 15.95 16.47 16.91 17.09 17.60 18.11 18.60 19.11 19.61 3 B 11.33 11.71 12.09 12.47 12.85 13.22 13.60 13.98 14.36 14.74 O 17.00 17.57 18.14 18.71 19.28 19.83 20.40 20.97 21.54 22.11 4 B 12.72 13.15 13.57 14.00 14.42 14.84 15.27 15.69 16.12 16.54 O 19.08 19.73 20.36 21.00 21.63 22.26 22.91 23.54 24.18 24.81 5 B 14.23 14.71 15.18 15.66 16.13 16.61 17.08 17.56 18.03 18.51 O 21.35 22.07 22.77 23.49 24.20 24.92 25.62 26.34 27.05 27.77 6 B 15.87 16.40 16.92 17.45 17.98 18.51 19.04 19.57 20.10 20.63 O 23.81 24.60 25.38 26.18 26.97 27.77 28.56 29.36 30.15 30.95 7 B 17.63 18.22 18.81 19.39 19.98 20.57 21.16 21.75 22.33 22.92 O 26.45 27.33 28.22 29.09 29.97 30.86 31.74 32.63 33.50 34.38 8 B 19.53 20.18 20.83 21.48 22.13 22.78 23.43 24.08 24.73 25.38 O 29.30 30.27 31.25 32.22 33.20 34.17 35.15 35.63 35.63 35.63 9 B 21.57 22.29 23.01 23.73 24.44 25.16 25.88 26.60 27.32 28.04 O 32.36 33.44 34.52 35.60 35.63 35.63 35.63 35.63 35.63 35.63 10 B 23.75 24.54 25.33 26.13 26.92 27.71 28.50 29.29 30.08 30.88 O 35.63 35.63 35.63 35.63 35.63 35.63 35.63 35.63 35.63 35.63 11 B 26.10 26.97 27.84 28.71 29.58 30.45 31.32 32.19 33.06 33.93 O 35.63 35.63 35.63 35.63 35.63 35.63 35.63 35.63 35.63 35.63 12 B 31.28 32.32 33.36 34.40 35.45 36.49 37.53 38.57 39.62 40.66 O 35.63 35.63 35.63 35.63 35.63 36.49 37.53 38.57 39.62 40.66 13 B 37.19 38.43 39.67 40.91 42.15 43.39 44.63 45.87 47.11 48.35 O 37.19 38.43 39.67 40.91 42.15 43.39 44.63 45.87 47.11 48.35 14 B 43.95 45.42 46.88 48.35 49.81 51.28 52.74 54.21 55.67 57.14 O 43.95 45.42 46.88 48.35 49.81 51.28 52.74 54.21 55.67 57.14 15 B 51.70 53.42 55.15 56.87 58.59 60.31 62.04 63.76 65.48 67.21 O 51.70 53.42 55.15 56.87 58.59 60.31 62.04 63.76 65.48 67.21 2006-SD INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 19.19% FOR THE LOCALITY PAY AREA OF SAN DIEGO-CARLSBAD-SAN MARCOS, CA (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.41%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.34 9.65 9.96 10.27 10.58 10.76 11.07 11.38 11.39 11.68 O 14.01 14.48 14.94 15.41 15.87 16.14 16.61 17.07 17.09 17.52 2 B 10.50 10.75 11.10 11.39 11.52 11.86 12.20 12.53 12.87 13.21 O 15.75 16.13 16.65 17.09 17.28 17.79 18.30 18.80 19.31 19.82 3 B 11.46 11.84 12.22 12.60 12.98 13.37 13.75 14.13 14.51 14.90 O 17.19 17.76 18.33 18.90 19.47 20.06 20.63 21.20 21.77 22.35 4 B 12.86 13.29 13.72 14.15 14.58 15.01 15.43 15.86 16.29 16.72 O 19.29 19.94 20.58 21.23 21.87 22.52 23.15 23.79 24.44 25.08 5 B 14.39 14.87 15.35 15.83 16.31 16.79 17.27 17.75 18.23 18.71 O 21.59 22.31 23.03 23.75 24.47 25.19 25.91 26.63 27.35 28.07 6 B 16.04 16.57 17.11 17.64 18.18 18.71 19.25 19.78 20.32 20.85 O 24.06 24.86 25.67 26.46 27.27 28.07 28.88 29.67 30.48 31.28 7 B 17.82 18.42 19.01 19.61 20.20 20.79 21.39 21.98 22.58 23.17 O 26.73 27.63 28.52 29.42 30.30 31.19 32.09 32.97 33.87 34.76 8 B 19.74 20.40 21.06 21.71 22.37 23.03 23.69 24.34 25.00 25.66 O 29.61 30.60 31.59 32.57 33.56 34.55 35.54 36.02 36.02 36.02 9 B 21.80 22.53 23.26 23.98 24.71 25.44 26.16 26.89 27.62 28.34 O 32.70 33.80 34.89 35.97 36.02 36.02 36.02 36.02 36.02 36.02 10 B 24.01 24.81 25.61 26.41 27.21 28.01 28.81 29.61 30.41 31.21 O 36.02 36.02 36.02 36.02 36.02 36.02 36.02 36.02 36.02 36.02 11 B 26.38 27.26 28.14 29.02 29.90 30.78 31.66 32.54 33.41 34.29 O 36.02 36.02 36.02 36.02 36.02 36.02 36.02 36.02 36.02 36.02 12 B 31.62 32.67 33.72 34.78 35.83 36.89 37.94 38.99 40.05 41.10 O 36.02 36.02 36.02 36.02 36.02 36.89 37.94 38.99 40.05 41.10 13 B 37.60 38.85 40.10 41.36 42.61 43.86 45.11 46.37 47.62 48.87 O 37.60 38.85 40.10 41.36 42.61 43.86 45.11 46.37 47.62 48.87 14 B 44.43 45.91 47.39 48.87 50.35 51.83 53.31 54.79 56.28 57.76 O 44.43 45.91 47.39 48.87 50.35 51.83 53.31 54.79 56.28 57.76 15 B 52.26 54.00 55.74 57.49 59.23 60.97 62.71 64.45 66.20 67.94 O 52.26 54.00 55.74 57.49 59.23 60.97 62.71 64.45 66.20 67.94 2006-SF INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 28.68% FOR THE LOCALITY PAY AREA OF SAN JOSE-SAN FRANCISCO-OAKLAND, CA (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.95%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 10.08 10.42 10.75 11.09 11.42 11.62 11.95 12.29 12.30 12.61 O 15.12 15.63 16.13 16.64 17.13 17.43 17.93 18.44 18.45 18.92 2 B 11.34 11.61 11.98 12.30 12.44 12.80 13.17 13.53 13.90 14.26 O 17.01 17.42 17.97 18.45 18.66 19.20 19.76 20.30 20.85 21.39 3 B 12.37 12.78 13.19 13.61 14.02 14.43 14.84 15.26 15.67 16.08 O 18.56 19.17 19.79 20.42 21.03 21.65 22.26 22.89 23.51 24.12 4 B 13.88 14.35 14.81 15.27 15.74 16.20 16.66 17.13 17.59 18.05 O 20.82 21.53 22.22 22.91 23.61 24.30 24.99 25.70 26.39 27.08 5 B 15.53 16.05 16.57 17.09 17.61 18.12 18.64 19.16 19.68 20.20 O 23.30 24.08 24.86 25.64 26.42 27.18 27.96 28.74 29.52 30.30 6 B 17.32 17.89 18.47 19.05 19.63 20.20 20.78 21.36 21.93 22.51 O 25.98 26.84 27.71 28.58 29.45 30.30 31.17 32.04 32.90 33.77 7 B 19.24 19.88 20.53 21.17 21.81 22.45 23.09 23.73 24.37 25.01 O 28.86 29.82 30.80 31.76 32.72 33.68 34.64 35.60 36.56 37.52 8 B 21.31 22.02 22.73 23.44 24.15 24.86 25.57 26.28 26.99 27.70 O 31.97 33.03 34.10 35.16 36.23 37.29 38.36 38.88 38.88 38.88 9 B 23.54 24.32 25.11 25.89 26.68 27.46 28.25 29.03 29.82 30.60 O 35.31 36.48 37.67 38.84 38.88 38.88 38.88 38.88 38.88 38.88 10 B 25.92 26.78 27.65 28.51 29.38 30.24 31.10 31.97 32.83 33.70 O 38.88 38.88 38.88 38.88 38.88 38.88 38.88 38.88 38.88 38.88 11 B 28.48 29.43 30.38 31.33 32.28 33.23 34.18 35.13 36.08 37.02 O 38.88 38.88 38.88 38.88 38.88 38.88 38.88 38.88 38.88 38.88 12 B 34.13 35.27 36.41 37.55 38.68 39.82 40.96 42.10 43.23 44.37 O 38.88 38.88 38.88 38.88 38.88 39.82 40.96 42.10 43.23 44.37 13 B 40.59 41.94 43.30 44.65 46.00 47.35 48.71 50.06 51.41 52.77 O 40.59 41.94 43.30 44.65 46.00 47.35 48.71 50.06 51.41 52.77 14 B 47.97 49.56 51.16 52.76 54.36 55.96 57.56 59.16 60.76 62.35 O 47.97 49.56 51.16 52.76 54.36 55.96 57.56 59.16 60.76 62.35 15 B 56.42 58.30 60.18 62.06 63.94 65.82 67.70 68.52 68.52 68.52 O 56.42 58.30 60.18 62.06 63.94 65.82 67.70 68.52 68.52 68.52 * Rate limited to the rate for level IV of the Executive Schedule (5 U.S.C. 5304 (g)(1)). 2006-SEA INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 17.93% FOR THE LOCALITY PAY AREA OF SEATTLE-TACOMA-OLYMPIA, WA (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.33%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.24 9.55 9.86 10.16 10.47 10.65 10.95 11.26 11.27 11.56 O 13.86 14.33 14.79 15.24 15.71 15.98 16.43 16.89 16.91 17.34 2 B 10.39 10.64 10.98 11.27 11.40 11.73 12.07 12.40 12.74 13.07 O 15.59 15.96 16.47 16.91 17.10 17.60 18.11 18.60 19.11 19.61 3 B 11.34 11.71 12.09 12.47 12.85 13.23 13.60 13.98 14.36 14.74 O 17.01 17.57 18.14 18.71 19.28 19.85 20.40 20.97 21.54 22.11 4 B 12.72 13.15 13.57 14.00 14.42 14.85 15.27 15.70 16.12 16.54 O 19.08 19.73 20.36 21.00 21.63 22.28 22.91 23.55 24.18 24.81 5 B 14.24 14.71 15.19 15.66 16.14 16.61 17.08 17.56 18.03 18.51 O 21.36 22.07 22.79 23.49 24.21 24.92 25.62 26.34 27.05 27.77 6 B 15.87 16.40 16.93 17.46 17.99 18.51 19.04 19.57 20.10 20.63 O 23.81 24.60 25.40 26.19 26.99 27.77 28.56 29.36 30.15 30.95 7 B 17.64 18.22 18.81 19.40 19.99 20.57 21.16 21.75 22.34 22.92 O 26.46 27.33 28.22 29.10 29.99 30.86 31.74 32.63 33.51 34.38 8 B 19.53 20.18 20.83 21.48 22.13 22.79 23.44 24.09 24.74 25.39 O 29.30 30.27 31.25 32.22 33.20 34.19 35.16 35.64 35.64 35.64 9 B 21.57 22.29 23.01 23.73 24.45 25.17 25.89 26.61 27.33 28.05 O 32.36 33.44 34.52 35.60 35.64 35.64 35.64 35.64 35.64 35.64 10 B 23.76 24.55 25.34 26.13 26.92 27.71 28.51 29.30 30.09 30.88 O 35.64 35.64 35.64 35.64 35.64 35.64 35.64 35.64 35.64 35.64 11 B 26.10 26.97 27.84 28.71 29.58 30.45 31.32 32.19 33.06 33.93 O 35.64 35.64 35.64 35.64 35.64 35.64 35.64 35.64 35.64 35.64 12 B 31.28 32.32 33.37 34.41 35.45 36.49 37.54 38.58 39.62 40.67 O 35.64 35.64 35.64 35.64 35.64 36.49 37.54 38.58 39.62 40.67 13 B 37.20 38.44 39.68 40.92 42.16 43.40 44.64 45.88 47.12 48.36 O 37.20 38.44 39.68 40.92 42.16 43.40 44.64 45.88 47.12 48.36 14 B 43.96 45.42 46.89 48.35 49.82 51.28 52.75 54.22 55.68 57.15 O 43.96 45.42 46.89 48.35 49.82 51.28 52.75 54.22 55.68 57.15 15 B 51.71 53.43 55.15 56.88 58.60 60.33 62.05 63.77 65.50 67.22 O 51.71 53.43 55.15 56.88 58.60 60.33 62.05 63.77 65.50 67.22 2006-DCB INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 17.50% FOR THE LOCALITY PAY AREA OF WASHINGTON-BALTIMORE-NORTHERN VIRGINIA, DC-MD-PA-VA-WV (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 3.44%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 9.21 9.51 9.82 10.12 10.43 10.61 10.91 11.22 11.23 11.51 O 13.82 14.27 14.73 15.18 15.65 15.92 16.37 16.83 16.85 17.27 2 B 10.35 10.60 10.94 11.23 11.36 11.69 12.02 12.36 12.69 13.02 O 15.53 15.90 16.41 16.85 17.04 17.54 18.03 18.54 19.04 19.53 3 B 11.29 11.67 12.05 12.42 12.80 13.18 13.55 13.93 14.31 14.68 O 16.94 17.51 18.08 18.63 19.20 19.77 20.33 20.90 21.47 22.02 4 B 12.68 13.10 13.52 13.95 14.37 14.79 15.22 15.64 16.06 16.48 O 19.02 19.65 20.28 20.93 21.56 22.19 22.83 23.46 24.09 24.72 5 B 14.18 14.66 15.13 15.60 16.08 16.55 17.02 17.50 17.97 18.44 O 21.27 21.99 22.70 23.40 24.12 24.83 25.53 26.25 26.96 27.66 6 B 15.81 16.34 16.87 17.39 17.92 18.45 18.97 19.50 20.03 20.55 O 23.72 24.51 25.31 26.09 26.88 27.68 28.46 29.25 30.05 30.83 7 B 17.57 18.16 18.74 19.33 19.91 20.50 21.08 21.67 22.26 22.84 O 26.36 27.24 28.11 29.00 29.87 30.75 31.62 32.51 33.39 34.26 8 B 19.46 20.11 20.76 21.40 22.05 22.70 23.35 24.00 24.65 25.30 O 29.19 30.17 31.14 32.10 33.08 34.05 35.03 35.51 35.51 35.51 9 B 21.49 22.21 22.93 23.64 24.36 25.08 25.79 26.51 27.23 27.94 O 32.24 33.32 34.40 35.46 35.51 35.51 35.51 35.51 35.51 35.51 10 B 23.67 24.46 25.25 26.04 26.82 27.61 28.40 29.19 29.98 30.77 O 35.51 35.51 35.51 35.51 35.51 35.51 35.51 35.51 35.51 35.51 11 B 26.00 26.87 27.74 28.61 29.47 30.34 31.21 32.07 32.94 33.81 O 35.51 35.51 35.51 35.51 35.51 35.51 35.51 35.51 35.51 35.51 12 B 31.17 32.21 33.25 34.28 35.32 36.36 37.40 38.44 39.48 40.52 O 35.51 35.51 35.51 35.51 35.51 36.36 37.40 38.44 39.48 40.52 13 B 37.06 38.30 39.53 40.77 42.00 43.24 44.48 45.71 46.95 48.18 O 37.06 38.30 39.53 40.77 42.00 43.24 44.48 45.71 46.95 48.18 14 B 43.80 45.26 46.72 48.18 49.64 51.10 52.56 54.02 55.48 56.94 O 43.80 45.26 46.72 48.18 49.64 51.10 52.56 54.02 55.48 56.94 15 B 51.52 53.24 54.95 56.67 58.39 60.10 61.82 63.54 65.26 66.97 O 51.52 53.24 54.95 56.67 58.39 60.10 61.82 63.54 65.26 66.97 2006-RUS INCORPORATING THE 2.10% GENERAL SCHEDULE INCREASE AND A LOCALITY PAYMENT OF 12.52% FOR THE LOCALITY PAY AREA OF REST OF U.S. (See http://www.opm.gov/oca/06tables/locdef.asp for definitions of locality pay areas.) (TOTAL INCREASE: 2.83%) EFFECTIVE JANUARY 2006 Hourly/Overtime Rates by Grade and Step Grade B/O Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 1 B 8.82 9.11 9.40 9.70 9.99 10.16 10.45 10.74 10.75 11.03 O 13.23 13.67 14.10 14.55 14.99 15.24 15.68 16.11 16.13 16.55 2 B 9.91 10.15 10.48 10.75 10.87 11.19 11.51 11.83 12.15 12.47 O 14.87 15.23 15.72 16.13 16.31 16.79 17.27 17.75 18.23 18.71 3 B 10.82 11.18 11.54 11.90 12.26 12.62 12.98 13.34 13.70 14.06 O 16.23 16.77 17.31 17.85 18.39 18.93 19.47 20.01 20.55 21.09 4 B 12.14 12.55 12.95 13.36 13.76 14.17 14.57 14.98 15.38 15.79 O 18.21 18.83 19.43 20.04 20.64 21.26 21.86 22.47 23.07 23.69 5 B 13.58 14.04 14.49 14.94 15.40 15.85 16.30 16.75 17.21 17.66 O 20.37 21.06 21.74 22.41 23.10 23.78 24.45 25.13 25.82 26.49 6 B 15.14 15.65 16.15 16.66 17.16 17.67 18.17 18.67 19.18 19.68 O 22.71 23.48 24.23 24.99 25.74 26.51 27.26 28.01 28.77 29.52 7 B 16.83 17.39 17.95 18.51 19.07 19.63 20.19 20.75 21.31 21.87 O 25.25 26.09 26.93 27.77 28.61 29.45 30.29 31.13 31.97 32.81 8 B 18.63 19.26 19.88 20.50 21.12 21.74 22.36 22.98 23.60 24.22 O 27.95 28.89 29.82 30.75 31.68 32.61 33.54 34.01 34.01 34.01 9 B 20.58 21.27 21.95 22.64 23.33 24.01 24.70 25.39 26.07 26.76 O 30.87 31.91 32.93 33.96 34.01 34.01 34.01 34.01 34.01 34.01 10 B 22.67 23.42 24.18 24.93 25.69 26.44 27.20 27.95 28.71 29.46 O 34.01 34.01 34.01 34.01 34.01 34.01 34.01 34.01 34.01 34.01 11 B 24.90 25.73 26.56 27.39 28.22 29.05 29.88 30.71 31.54 32.38 O 34.01 34.01 34.01 34.01 34.01 34.01 34.01 34.01 34.01 34.01 12 B 29.85 30.84 31.84 32.83 33.83 34.82 35.82 36.81 37.80 38.80 O 34.01 34.01 34.01 34.01 34.01 34.82 35.82 36.81 37.80 38.80 13 B 35.49 36.68 37.86 39.04 40.22 41.41 42.59 43.77 44.96 46.14 O 35.49 36.68 37.86 39.04 40.22 41.41 42.59 43.77 44.96 46.14 14 B 41.94 43.34 44.74 46.14 47.53 48.93 50.33 51.73 53.13 54.52 O 41.94 43.34 44.74 46.14 47.53 48.93 50.33 51.73 53.13 54.52 15 B 49.34 50.98 52.62 54.27 55.91 57.56 59.20 60.85 62.49 64.14 O 49.34 50.98 52.62 54.27 55.91 57.56 59.20 60.85 62.49 64.14