[Federal Register: November 2, 1998 (Volume 63, Number 211)] [Notices] [Page 58714] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr02no98-55] [[Page 58714]] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP99-22-000] Gasdel Pipeline System, Inc.; Notice of Application October 27, 1998. Take notice that on October 19, 1998, Gasdel Pipeline System, Inc. (Applicant), 110 West Broadway, P.O. Box 909 Ardmore, Oklahoma, 73402, filed in Docket No. CP99-22-000 an abbreviated application pursuant to Section 7(b) of the Natural Gas Act, as amended, and Section 157.18 of the Federal Energy Regulatory Commission's (Commission) regulations thereunder, for permission and approval to authorize Applicant to abandon by sale its interests in twelve pipeline segments as well as seeking an order vacating the authorization in Docket No. CP96-478-000 under the blanket certificate issued in Docket No. CP83-276-000 for the acquisition of the East Cameron Block 311 Lateral on the grounds that the East Cameron Block 311 Lateral is exempt from the Commission's jurisdiction pursuant to the production and gathering exemption contained in Section 1(b) of the NGA, all as more fully set forth in the application which is on file with the Commission and open to public inspection. Applicant, a wholly-owned subsidiary of Energy Development Corporation (EDC), has sold, subject to receipt of the requisite regulatory approvals, its interest in twelve of its thirteen line segments to Transcontinental Gas Pipe Line Corporation (Transco). Applicant states that because some of the facilities were constructed and/or acquired under specific certificates and some under blanket certificates, Applicant is seeking Commission authorization to abandon by sale for $500,000 its interests in those facilities. Applicant further states that upon completion of this sale to Transco, the only remaining natural gas pipeline facility owned by Applicant will be its East Cameron Block 311 line. In addition to granting its request to abandon by sale its interests in the twelve line segments being sold to Transco, Applicant requests the Commission to vacate the blanket certificate authorization previously used by Applicant from the East Cameron Block 311 line as not having been necessary for the reasons stated above. Applicant asserts that upon receipt of the abandonment authorization and the vacation of the blanket certificate authorization for the East Cameron Block 311 line, Applicant will no longer be jurisdictional because it will no longer own or operate any facilities, or conduct any operations, subject to the Commission's jurisdiction under the NGA. Therefore, Applicant requests cancellation of its FERC Gas Pipeline Tariff and vacation of the Order on Request for Waiver, 79 FERC para. 61,102, (1997), denying Applicant's request for a waiver of the standards relating to electronic delivery mechanisms (EDM), electronic data interchanges (EDI) and capacity release practices contained in FERC Order No. 587. Any person desiring to be heard or to make any protest with reference to said application should on or before November 17, 1998, file with the Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, a petition to intervene or a protest in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the regulations under the Natural Gas Act (18 CFR 157.10). All protests filed with the Commission will be considered by it in determining the appropriate action to be taken but will not serve to make the protestants parties to the proceeding. Any person wishing to become a party to the proceeding or to participate as a party in any hearing therein must file a petition to intervene in accordance with the Commission's Rules. Take further notice that, pursuant to the authority contained in and subject to the jurisdiction conferred upon the Federal Energy Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and the Commission's Rules of Practice and Procedure, a hearing will be held without further notice before the Commission on this application if no petition to intervene is filed within the time required herein, and if the Commission on its own review of the matter finds that the abandonment is required by the public convenience and necessity. If a petition for leave to intervene is timely filed, or if the Commission on its motion believes that a formal hearing is required, further notice of such hearing will be duly given. Under the procedure herein provide for, unless otherwise advised, it will be unnecessary for Applicant to appear or be represented at the hearing. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 98-29231 Filed 10-30-98; 8:45 am] BILLING CODE 6717-01-M