Escalated Enforcement Actions Issued
to Reactor Licensees - L
A | B
| C | D |
E | F | G
| H | I |
J | K | L
| M | N |
O | P | Q
| R | S |
T | U | V
| W | X |
Y | Z
Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.
La Salle 1 & 2 - Docket
Nos. 050-00373; 050-00374
NRC Action Number(s) and
Facility Name |
Action Type
(Severity) &
Civil Penalty
(if any) |
Date
Issued |
Description |
EA-06-022 La Salle 2 |
NOV (SL III) |
03/31/2006 |
On March 31, 2006, a Notice of Violation was issued for a Severity Level III violation involving the failure to comply with the written procedures required by the facility’s Technical Specifications addressing entry into high radiation areas (HRAs). Specifically, a contractor pipefitter foreman and two contractor pipefitters entered a properly posted HRA without reviewing and signing the appropriate radiation work permit and without a briefing from radiation protection personnel for entry into a HRA. |
EA-05-103
La Salle 1 & 2 |
NOV
(White) |
09/07/2005 |
On September 7, 2005, a Notice of Violation was issued for a violation
associated with a White SDP finding involving a single point vulnerability
that could result in a loss of all onsite and offsite power sources
to both 4160 Vac Division 1 and Division 2 safety-related buses at
either of the LaSalle County Station units. The violation cited the
licensees failure to assure that applicable regulatory requirements
and the design basis for safety-related systems were correctly maintained
and controlled in accordance with the applicable standards, when
the licensee made modifications to the emergency diesel generator
(EDG) output circuit breakers. |
EA-04-170
La Salle 1 |
NOVCP
(SL III)
$60,000
ORDER
|
05/02/2005
11/22/2005 |
On May 2, 2005, a Notice of Violation and Proposed
Imposition of a Civil Penalty (NOV/CP) in the amount of $60,000 was
issued to Exelon
for a willful Severity Level III violation involving four contract
employees who violated radiation protection procedures associated
with entry into high radiation areas. On May 12, 2005, Exelon informed
the NRC of its intent to appeal this enforcement action using the
alternative dispute resolution (ADR) process as a means to obtain
resolution. In order to resolve disagreements, Exelon, The Venture,
and NRC representatives met with an independent mediator on July
11, 2005. As part of the ADR settlement agreement, Exelon agreed
that a willful violation occurred as documented in the NRC’s
May 2, 2005, NOV/CP and committed to implement numerous comprehensive
short-term and long-term corrective actions. Based on the expectation
that Exelon will satisfactorily implement these corrective actions,
the NRC agreed to reclassify the violation at Severity Level IV,
to reduce the civil penalty to $10,000, and to not consider the violation
as part of the civil penalty assessment process (NRC Enforcement
Policy, Section VI.C.2) should the NRC consider future enforcement
actions against LaSalle. Exelon acknowledged concurrence with the
terms and conditions of the settlement agreement in an August 25,
2005, letter, and Exelon signed a “Consent and Hearing Waiver
Form” on November 18, 2005. Therefore, a Confirmatory Order
confirming commitments reached as part of an ADR mediation settlement
agreement was issued to Exelon on November 22, 2005. |
EA-98-560
La Salle 1 & 2 |
NOV
(SL III) |
03/29/1999 |
Failure to establish and implement written policies and procedures
for the Fitness for Duty (FFD) program. |
EA-96-325
La Salle 1 & 2 |
NOVCP
(SL III)
$650,000 |
01/24/1997 |
Service water system clogging resulting from the licensee injecting
foam material into the service water system. |
Limerick 1 & 2 - Docket
Nos. 050-00352; 050-00353
NRC Action Number(s) and
Facility Name |
Action Type
(Severity) &
Civil Penalty
(if any) |
Date
Issued |
Description |
EA-01-293
Limerick 2 |
NOV
(White) |
01/11/2002 |
On January 11, 2002, a Notice of Violation was issued for a violation
associated with a White SDP finding involving the 2N Safety/Relief
Valve (SRV). The violation cited the failure to establish adequate
measures to identify that the SRV was in a degraded condition and
was vulnerable to a failure to re-close after lifting. |
EA-01-189
Limerick 1 & 2 |
NOV
(SL III) |
10/23/2001 |
On October 23, 2001, a Notice of Violation was issued for a Severity
Level III problem involving the willful creation of inaccurate and
incomplete siren testing maintenance records by two former maintenance
technicians and deficiencies with the ability to provide early notification
to the populace surrounding the facility in the event of an emergency. |
EA-98-141
Limerick 1 & 2 |
NOVCP
(SL III)
$ 55,000 |
07/07/1998 |
Corrective action. |
EA-97-340
Limerick 1 & 2 |
NOV
(SL III) |
09/29/1997 |
Failure to pre-stage Appendix R equipment. |
EA-97-050
Limerick 1 & 2 |
NOVCP
(SL III)
$80,000 |
08/05/1997 |
Falsification of reactor enclosure cooling water sample and fire
protection Surveillances documentation. |
EA-96-243
Limerick 1 & 2 |
NOV
(SL III) |
02/03/1997 |
Secretary enter text file for entire physical security plan onto
LAN. Failure to protect aperture cards containing safeguards information. |
EA-96-209
Limerick 1 & 2 |
NOV
(SL III) |
10/17/1996 |
Failure to exclude foreign material from the suppression pool. |
|