Zion - Docket Nos. 050-00295;
050-00304
NRC Action Number(s) and
Facility Name |
Action Type
(Severity) &
Civil Penalty
(if any) |
Date
Issued |
Description |
EA-98-518
EA-98-518-O
Zion |
NOVCP
(SL II)
$110,000 |
11/13/1999 |
Violation involving discrimination against a Senior
Reactor Operator for raising nuclear safety issues. |
ORDERCP
$110,000 |
06/12/2000 |
EA-99-100
Zion |
NOV
(SL III) |
07/20/1999 |
Deliberate violation of the procedures implementing the NRC-approved
security plan for the Zion Station. |
EA-98-558
Zion |
NOV
(SL III) |
04/09/1999 |
Unattended safeguard materials. |
EA-97-249
Zion |
NOVCP
(SL III)
$110,000 |
01/15/1998 |
Fitness-For-Duty program breakdown. |
EA-97-224
Zion |
NOV
(SL III) |
09/12/1997 |
Fuel handling building filtered exhaust. |
EA-97-222
Zion |
NOVCP
(SL III)
$330,000 |
09/02/1997 |
Nitrogen bubble in reactor head event. |
EA-97-048
Zion |
NOVCP
(SL III)
$ 50,000 |
06/17/1997 |
Multiple low level examples of program deficiencies related to transportation
of radioactive materials and failure of QA audit to identify. |
EA-96-355
Zion |
NOVCP
(SL III)
$100,000 |
03/12/1997 |
The action was based on multiple violations that involved failures
to: (1) perform adequate10 CFR 50.59 analyses for modifications on
safety-related systems; (2) follow procedures in the areas of modifications,
corrective actions, operations and maintenance; (3) conduct tests
to demonstrate systems would perform satisfactorily following modification;
and (4) take prompt corrective action for significant conditions adverse
to quality involving repetitive out-of-tolerance settings for containment
spray system sodium hydroxide spray additive tank level indication
and repetitive failures of a 4KV breaker. |
EA-96-216
Zion |
NOVCP
(SL III)
$50,000 |
08/23/1996 |
Multiple procedure violations by operations personnel indicating
possible breakdown in control of operations. |
|