Escalated Enforcement Actions Issued to Reactor Licensees - Q

Quad Cities 1 & 2 - Docket Nos. 050-00254; 050-00265

NRC Action Number(s) and
Facility Name
Action Type
(Severity) &
Civil Penalty
(if any)
Date
Issued
Description
EA-06-112
Quad Cities 1 & 2
NOV
(White)
06/29/2006 On June 29, 2006, a Notice of Violation associated with a White SDP finding was issued for a finding involving the failure to establish measures to ensure that the Unit 1 electromatic relief valves (ERVs) remained suitable for operation prior to implementing an extended power uprate (EPU) in November 2002. This resulted in multiple ERVs becoming inoperable and unavailable due to being subjected to significantly higher vibration levels during Unit 1 operation at EPU power levels.
EA-98-231
Quad Cities 1 & 2

NOVCP
(SL II)

$88,000

09/11/1998 This action is based on one Severity Level II problem involving very significant inadequacies in ComEd's capability to shut down the Quad Cities facility and maintain the units in a safe shutdown condition following a postulated design basis fire.
EA-97-591
Quad Cities 1 & 2
NOVCP
(SL III)

$330,000
03/12/1998 Licensee used critical heat to perform code required leak testing and licensee lived with a failed inner o-ring in the RV for over one year.
EA-97-466
Quad Cities 1 & 2
NOVCP
(SL III)

$ 55,000
03/03/1998 Maintenance rule violation.
EA-96-530 &
EA-96-531
Quad Cities 1 & 2
NOVCP
(SL III)

$ 50,000
06/24/1997 Failure to maintain secondary containment as safety related.
EA-96-114
Quad Cities 1 & 2
NOVCP
(SL III)

$ 50,000
06/13/1996 Corner rooms structural steel in a condition outside of FSAR caused by failure to account for modifications in the original design calculations.