The following is a list of correspondence on the Possible Completion of Construction Activities.

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Date Originator Description
05/08/2008 NRC Assessment of Generic Communications Status
05/08/2008 NRC Assessment of remaining licensing review scope
03/20/2008 TVA Letter addressing Watts Bar Unit 2 Generic Communication status
2/15/2008 NRC Instruction Manual Chapter 2517-WBN Unit 2 Construction Inspection Program
2/15/2008 TVA Submittal of Final Supplemental Environmental Impact Statement
1/29/2008 TVA Submittal of regulatory framework letter for completion of unit 2
10/22/2007 NRC Acceptance of TVA 120 day notice of reactivation letter
08/03/2007 TVA 120 day letter informing NRC reactivation of Unit 2
07/25/2007 NRC Commission Staff Requirements Memorandum on SECY-07-0096
06/07/2007 NRC Commission paper SECY-07-0096 describing policy issues
04/03/2007 TVA Key Assumptions for the Possible Completion of Construction Activities
11/14/2006 TVA Feasibility Study for the Completion of Construction Activities