skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Reactor Vessel Head Degradation
Current NRC Activities
0350 Oversight Panel
Overview
Images
News and Correspondence
Public Meetings
Correspondence Related to NRC Bulletin 2002-01
Correspondence Related to NRC Order EA-03-009
Specific Communications with Spring 2002 Outage Plants
Petition Related Documents
References
Lessons Learned Task Force

Specific Communications with Spring 2002 Outage Plants

This page presents NRC communications with Nuclear Power Plants having outages during the spring 2002 season. NRC staff held telephone conversations in Pre-Inspection Communications with managers of all plants conducting refueling outages this Spring to ensure they inspect reactor vessel heads for signs of degradation as required in Bulletin 2002-01. Results of those inspections were discussed with NRC staff in Post-Inspection Communications. Links to communications in the table will be activated as quickly as is possible.

All links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information.

 Plant
Pre-Inspection Communications
Post-Inspection Communications
Other Communications
Arkansas 2    
Byron 1
 
 
Calvert Cliffs 1
 
 
Comanche Peak  
Cook    
Diablo Canyon 1
 
 
Ginna
 
McGuire 2
 
 
Millstone 2
 
Oconee 1
 
Palo Verde 2
 
Surry 2
 
Turkey Point 4
 
Vogtle 1
 
 
Waterford 3
 
 
Watts Bar
 
 
Wolf Creek
 

(To top of page)



Privacy Policy | Site Disclaimer
Tuesday, February 13, 2007