Reactor Vessel Head Degradation
Current NRC Activities
0350 Oversight Panel
Overview
Images
News and Correspondence
Public Meetings
Correspondence Related to NRC Bulletin 2002-01
Correspondence Related to NRC Order EA-03-009
Specific Communications with Spring 2002 Outage Plants
Petition Related Documents
References
Lessons Learned Task Force

Images

On this page:

Reactor Pressure Vessel Top Head Images

Typical Pressurized Water Reactor Reactor Vessel Head Degradation Location
See the following for a larger version of the above image or PDF Icon See the following for a larger version of the above image or PDF Icon

Overview of the Davis Besse Reactor Head Inspection Area
Looking Down at the Davis Besse Reactor Head Inspection Area
Looking Down (second angle) at the Davis Besse Reactor Head Inspection Area
Looking Up at the Davis Besse Reactor Head Inspection Area
Underneath the Davis Besse Reactor Head
Davis Besse Control Rod Drive Open Access Hatch View
Davis Besse Reactor Vessel Head Insulation Top View with Nozzle #3 Removed
Davis Besse Reactor Vessel Head Insulation Top View with Nozzle #3 Removed (overhead view)
Degradation Area of Davis Besse Nozzle #2 PDF Icon
Degradation Area of Davis Besse Nozzle #3 PDF Icon
Degradation Area of Davis Besse Nozzle #3 Sketch PDF Icon
Cavity Looking Toward Nozzle Eleven
Closeup View of Cavity Looking Toward Nozzle Eleven
Containment Access Location
Underneath View of Cutout
Underneath View of Cutout - Closeup View
17 Inch Cutout - View 1
17 Inch Cutout - View 2
Downward View of Reactor Vessel Head Cutout Hole - View 1
Downward View of Reactor Vessel Head Cutout Hole - View 2
Downward View of Reactor Vessel Head Cutout Hole - View 3
Looking Back Toward Nozzle Three
Looking Toward Nozzle Eleven
Nozzle Eleven Perspective
Undercut Area Toward Nozzle Eleven
Transporting New Head to Davis Besse
Top View of Cladding PDF Icon
Crack in Cladding PDF Icon

(To top of page)

Reactor Pressure Vessel Bottom Head Images

Typical Pressurized Water Reactor
See the following for a larger version of the above image


Undervessel Pre-Cleaning Center Incore Nozzel - View 1
Undervessel Pre-Cleaning - View 2
Undervessel Post-Cleaning - View 3

For related information see Generic Activities on Alloy 600 Cracking.

(To top of page)



Privacy Policy | Site Disclaimer