Pressurizer Issues
News and Correspondence
References
Correspondence Related to NRC Bulletin 2004-01

Correspondence Related to NRC Bulletin 2004-01

On May 28, 2004, NRC issued NRC Bulletin 2004-01, "Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors."

Operating experience has demonstrated that Alloy 82/182/600 materials exposed to primary coolant water (or steam) at the normal operating conditions of PWR plants have cracked due primary water stress corrosion cracking (PWSCC). The purpose of Bulletin 2004-01 is to (1) advise PWR licensees that current methods of inspecting Alloy 82/182/600 materials used in the fabrication of pressurizer penetrations and steam space piping connections may need to be supplemented with additional measures to detect and adequately characterize flaws due to PWSCC, (2) request PWR addressees to provide information related to pressurizer penetrations, steam space piping connections, and its Alloy 82/182/600 inspection program, and (3) require PWR addressees to provide a written response in accordance with 10 CFR 50.54(f).

On this page:

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Region 1

Plant Name Initial 60 Day Response 60 Day Post Outage Response Related Documents
Beaver Valley 1 ADAMS Icon ADAMS Icon 09/29/04 Supplemental Response
Beaver Valley 2 ADAMS Icon ADAMS Icon 09/29/04 Supplemental Response
Calvert Cliffs 1 ADAMS Icon ADAMS Icon 12/28/04 RAI
01/27/05
RAI Response
Calvert Cliffs 2 ADAMS Icon ADAMS Icon 12/28/04 RAI
01/27/05 RAI Response
Ginna ADAMS Icon    
Indian Point 2 ADAMS Icon    
Indian Point 3 ADAMS Icon    
Millstone 2 ADAMS Icon ADAMS Icon 10/04/04 Supplemental Response
03/31/05 Supplemental Response
Millstone 3 ADAMS Icon   10/04/04 Supplemental Response
03/31/05 Supplemental Response
Salem 1 ADAMS Icon    
Salem 2 ADAMS Icon    
Seabrook 1 ADAMS Icon ADAMS Icon 11/18/04 RAI
01/18/05 RAI Response
Three Mile Island 1 ADAMS Icon   07/07/05 Supplemental Response

(To top of page)

Region 2

Plant Name Initial 60 Day Response 60 Day Post Outage Response Related Documents
Catawba 1 ADAMS Icon ADAMS Icon 09/21/04 Supplemental Response
Catawba 2 ADAMS Icon ADAMS Icon 09/21/04 Supplemental Response
Crystal River 3 ADAMS Icon ADAMS Icon  
Farley 1 ADAMS Icon   10/21/04 Supplemental Response
Farley 2 ADAMS Icon   10/21/04 Supplemental Response
McGuire 1 ADAMS Icon   09/21/04 Supplemental Response
McGuire 2 ADAMS Icon ADAMS Icon 09/21/04 Supplemental Response
North Anna 1 ADAMS Icon ADAMS Icon 10/04/04 Supplemental Response
North Anna 2 ADAMS Icon   10/04/04 Supplemental Response
Oconee 1 ADAMS Icon ADAMS Icon 09/21/04 Supplemental Response
Oconee 2 ADAMS Icon   09/21/04 Supplemental Response
Oconee 3 ADAMS Icon ADAMS Icon 09/21/04 Supplemental Response
Robinson 2 ADAMS Icon    
Sequoyah 1 ADAMS Icon ADAMS Icon 11/10/04 RAI
02/07/05
RAI Withdrawal Letter
06/14/05
15 day Response Letter
Sequoyah 2 ADAMS Icon   11/10/04 RAI
02/07/05 RAI Withdrawal Letter
06/14/05 15 day Response Letter
Shearon Harris 1 ADAMS Icon ADAMS Icon 10/01/04 RAI
10/29/04
RAI Response
St. Lucie 1 ADAMS Icon   11/23/04 RAI
01/18/05 RAI Response
St. Lucie 2 ADAMS Icon ADAMS Icon 11/23/04 RAI
01/18/05
RAI Response
Summer ADAMS Icon   06/11/05 15 day Response Letter
Surry 1 ADAMS Icon   10/04/04 Supplemental Response
Surry 2 ADAMS Icon   10/04/04 Supplemental Response
Turkey Point 3 ADAMS Icon    
Turkey Point 4 ADAMS Icon    
Vogtle 1 ADAMS Icon ADAMS Icon 10/21/04 Supplemental Response
Vogtle 2 ADAMS Icon   10/21/04 Supplemental Response
Watts Bar 1 ADAMS Icon ADAMS Icon 02/11/05 Supplemental Response
06/14/05 15 day Response Letter

(To top of page)

Region 3

Plant Name Initial 60 Day Response 60 Day Post Outage Response Related Documents
Braidwood 1 ADAMS Icon ADAMS Icon  
Braidwood 2 ADAMS Icon ADAMS Icon  
Byron 1 ADAMS Icon ADAMS Icon  
Byron 2 ADAMS Icon ADAMS Icon  
Davis Besse ADAMS Icon ADAMS Icon 02/25/05 Supplemental Response
DC Cook 1 ADAMS Icon   10/28/04 Supplemental Response
DC Cook 2 ADAMS Icon ADAMS Icon 10/28/04 Supplemental Response
Kewaunee ADAMS Icon   09/3/04 Supplemental Response
Palisades ADAMS Icon ADAMS Icon 11/9/04 Supplemental Response
Point Beach 1 ADAMS Icon    
Point Beach 2 ADAMS Icon    
Prairie Island 1 ADAMS Icon    
Prairie Island 2 ADAMS Icon    

(To top of page)

Region 4

Plant Name Initial 60 Day Response 60 Day Post Outage Response Related Documents
Arkansas Nuclear 1    ADAMS Icon    
Arkansas Nuclear 2 ADAMS Icon ADAMS Icon  
Callaway ADAMS Icon ADAMS Icon  
Comanche Peak 1 ADAMS Icon   03/07/05 Supplemental Response
Comanche Peak 2 ADAMS Icon   03/07/05 Supplemental Response
Diablo Canyon 1 ADAMS Icon ADAMS Icon 10/14/04 Supplemental Response
Diablo Canyon 2 ADAMS Icon   10/14/04 Supplemental Response
Fort Calhoun ADAMS Icon    
Palo Verde 1 ADAMS Icon   02/23/06 Supplemental Response
Palo Verde 2 ADAMS Icon    
Palo Verde 3 ADAMS Icon ADAMS Icon  
San Onofre 2 ADAMS Icon    
San Onofre 3 ADAMS Icon ADAMS Icon  
South Texas 1 ADAMS Icon ADAMS Icon  
South Texas 2 ADAMS Icon ADAMS Icon  
Waterford 3 ADAMS Icon    
Wolf Creek 1 ADAMS Icon    