Adequacy Status of the Submitted 2005 and 2007 Revised Attainment
Demonstration Budgets for the 1-hour Ozone National Ambient Air Quality
Standard for Transportation Conformity Purposes for the Chicago, IL
Severe Ozone Nonattainment Area
[Federal Register: July 25, 2003 (Volume 68, Number 143)]
[Notices]
[Page 44078]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr25jy03-69]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[IL200-3; FRL-7535-7]
Adequacy Status of the Submitted 2005 and 2007 Revised Attainment
Demonstration Budgets for the 1-hour Ozone National Ambient Air Quality
Standard for Transportation Conformity Purposes for the Chicago, IL
Severe Ozone Nonattainment Area
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice of adequacy.
-----------------------------------------------------------------------
SUMMARY: In this notice, EPA is notifying the public that we have found
the revised attainment year motor vehicle emissions budgets
(``budgets'') for volatile organic compounds (VOC) and nitrogen oxides
(NOX) in the submitted revision to the 1-hour ozone
attainment demonstration state implementation plan (SIP) for the
Chicago, Illinois severe nonattainment area to be adequate for
conformity purposes. These attainment year budgets were recalculated
using EPA's latest motor vehicle emissions factor model, MOBILE6. On
March 2, 1999, the DC Circuit Court ruled that submitted state
implementation plan budgets cannot be used for conformity
determinations until EPA has affirmatively found them adequate. As a
result of our finding, the Chicago, Illinois severe ozone nonattainment
area can use the revised 2007 attainment year budgets of VOC and
NOX from the submitted revision to the 1-hour ozone
attainment demonstration SIP for future conformity determinations.
Illinois also submitted an updated 2005 VOC budget as part of the Rate
Of Progress requirement. As a result of this finding, the 2005 VOC
budget can also be used for conformity determinations in the Chicago,
Illinois area.
DATES: This finding is effective August 11, 2003.
FOR FURTHER INFORMATION CONTACT: Patricia Morris, Environmental
Scientist, Regulation Development Section (AR-18J), Air Programs
Branch, Air and Radiation Division, United States Environmental
Protection Agency, Region 5, 77 West Jackson Boulevard, Chicago,
Illinois 60604, (312) 353-8656, morris.patricia@epa.gov.
SUPPLEMENTARY INFORMATION: Throughout this document, whenever ``we'',
``us'' or ``our'' is used, we mean EPA.
Background
Today's notice is simply an announcement of a finding that we have
already made. EPA Region 5 sent a letter to the Illinois Environmental
Protection Agency on June 26, 2003, stating that the revised attainment
year motor vehicle emissions budgets in the Chicago, Illinois submitted
1-hour ozone attainment demonstration SIP revision (dated April 11,
2003) are adequate for conformity purposes. The purpose of Illinois's
April 11, 2003 submittal was to address its enforceable commitment to
revise the attainment year budgets using MOBILE6 within two years of
the release of the model. This enforceable commitment was approved by
EPA on November 13, 2001 (66 FR 56903). EPA's adequacy finding will
also be announced on EPA's conformity Web site: http://www.epa.gov/
otaq/traq, (once there, click on the ``Conformity'' button, then look
for ``Adequacy Review of SIP Submissions for Conformity'').
Transportation conformity is required by section 176(c) of the
Clean Air Act. EPA's conformity rule requires that transportation
plans, programs, and projects conform to SIPs and establishes the
criteria and procedures for determining whether or not they conform.
Conformity to a SIP means that transportation activities will not
produce new air quality violations, worsen existing violations, or
delay timely attainment of the national ambient air quality standards.
The criteria by which we determine whether a SIP's motor vehicle
emission budgets are adequate for conformity purposes are outlined in
40 CFR 93.118(e)(4). Please note that an adequacy review is separate
from EPA's completeness review, and it also should not be used to
prejudge EPA's ultimate approval of the SIP. Even if we find a budget
adequate, the SIP could later be disapproved.
We have described our process for determining the adequacy of
submitted SIP budgets in guidance (May 14, 1999 memo titled
``Conformity Guidance on Implementation of March 2, 1999 Conformity
Court Decision''). We followed this guidance, which can also be found
on EPA's Web site at: http://www.epa.gov/otaq/traq, in making our
adequacy determination.
Authority: 42 U.S.C. et seq.
Dated: July 9, 2003.
Bharat Mathur,
Acting Regional Administrator, Region 5.
[FR Doc. 03-19004 Filed 7-24-03; 8:45 am]
BILLING CODE 6560-50-P