Jump to main content.


Approval and Promulgation of Implementation Plans; Florida: Tampa Bay Area Maintenance Plan Update

 [Federal Register: March 29, 2004 (Volume 69, Number 60)]
[Proposed Rules]
[Page 16191]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr29mr04-17]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[FL-90-200322(b); FRL-7640-5]
 
Approval and Promulgation of Implementation Plans; Florida: Tampa 
Bay Area Maintenance Plan Update

AGENCY: Environmental Protection Agency (EPA).
ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The EPA is proposing to approve the State Implementation Plan 
(SIP) revision submitted by the Florida Department of Environmental 
Protection on December 20, 2002. This SIP revision satisfies the 
requirement of the Clean Air Act (CAA) as amended in 1990 for the 
second 10-year update for the Tampa Bay area (Hillsborough and Pinellas 
Counties) 1-hour ozone maintenance plan. For transportation purposes, 
EPA is also finalizing its adequacy determination of the new Motor 
Vehicle Emissions Budgets (MVEBs) for the year 2015. EPA has determined 
that the MVEBs for the year 2015 contained in this SIP revision are 
adequate for transportation conformity purposes. In the Final Rules 
section of this Federal Register, the EPA is approving the State's SIP 
revision as a direct final rule without prior proposal because the 
Agency views this as a noncontroversial submittal and anticipates no 
adverse comments. A detailed rationale for the approval is set forth in 
the direct final rule. If no significant, material, and adverse 
comments are received in response to this rule, no further activity is 
contemplated. If EPA receives adverse comments, the direct final rule 
will be withdrawn and all public comments received will be addressed in 
a subsequent final rule based on this rule. The EPA will not institute 
a second comment period on this document. Any parties interested in 
commenting on this document should do so at this time.

DATES: Written comments must be received on or before April 28, 2004.

ADDRESSES: Comments may be submitted by mail to: Sean Lakeman, 
Regulatory Development Section, Air Planning Branch, Air, Pesticides 
and Toxics Management Division, U.S. Environmental Protection Agency, 
Region 4, 61 Forsyth Street, SW., Atlanta, Georgia 30303-8960. Comments 
may also be submitted electronically, or through hand delivery/courier. 
Please follow the detailed instructions described in the direct final 
rule, SUPPLEMENTARY INFORMATION (sections V. B.1. through 3.) which is 
published in the Rules Section of this Federal Register.

FOR FURTHER INFORMATION CONTACT: Sean Lakeman, Regulatory Development 
Section, Air Planning Branch, Air, Pesticides and Toxics Management 
Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth 
Street, SW., Atlanta, Georgia 30303-8960. The telephone number is (404) 
562-90343. Mr. Lakeman can also be reached via electronic mail at 
lakeman.sean@epa.gov or Lynorae Benjamin, Air Quality Modeling & 
Transportation Section, Air Planning Branch, Air, Pesticides and Toxics 
Management Division, U.S. Environmental Protection Agency, Region 4, 61 
Forsyth Street, SW., Atlanta, Georgia 30303-8960. Ms. Benjamin's phone 
number is 404-562-9040. She can be reached via electronic mail at 
benjamin.lynorae@epa.gov.

SUPPLEMENTARY INFORMATION: For additional information see the direct 
final rule which is published in the Rules section of this Federal 
Register.

    Dated: March 17, 2004.
A. Stanley Meiburg,
Acting Regional Administrator, Region 4.
[FR Doc. 04-6825 Filed 3-26-04; 8:45 am]
BILLING CODE 6560-50-P 

 
 


Local Navigation


Jump to main content.