Jump to main content.


Approval and Promulgation of Implementation Plans Georgia: Enhanced Inspection and Maintenance Plan



[Federal Register: May 24, 2007 (Volume 72, Number 100)]
[Proposed Rules]
[Page 29101-29102]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr24my07-18]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R04-OAR-2006-0985-200625; FRL-8317-9]

Approval and Promulgation of Implementation Plans Georgia:
Enhanced Inspection and Maintenance Plan

AGENCY: Environmental Protection Agency (EPA).
ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: EPA is proposing to approve the State Implementation Plan
(SIP) revisions submitted by the State of Georgia, through the Georgia
Environmental Protection Division (GA EPD), on July 25, 2006, and
January 25, 2007, pertaining to rules for Enhanced Inspection and
Maintenance (I/M). In the Final Rules Section of this Federal Register,
EPA is approving the State's SIP revision as a direct final rule
without prior proposal because the Agency views this as a
noncontroversial submittal and anticipates no adverse comments. A
detailed rationale for the approval is set forth in the direct final
rule. If no adverse comments are received in response to this rule, no
further activity is contemplated. If EPA receives adverse comments, the
direct final rule will be withdrawn and all public comments received
will be addressed in a subsequent final rule based on this proposed
rule. EPA will not institute a second comment period on this document.
Any parties interested in commenting on this document should do so at
this time.

DATES: Written comments must be received on or before June 25, 2007.

ADDRESSES: Submit your comments, identified by Docket ID No. EPA-R04-
OAR-2006-0985, by one of the following methods:
    1. http://www.regulations.gov Follow the on-line instructions for
submitting comments.
    2. E-mail: harder.stacy@epa.gov.
    3. Fax: (404) 562-9019.
    4. Mail: ``EPA-R04-OAR-2006-0985,'' Regulatory Development Section,
Air Planning Branch, Air, Pesticides and Toxics Management Division,
U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street, SW.,
Atlanta, Georgia 30303-8960.
    5. Hand Delivery or Courier: Stacy Harder, Regulatory Development
Section, Air Planning Branch, Air, Pesticides and Toxics Management
Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth
Street, SW., Atlanta, Georgia 30303-8960. Such

[[Page 29102]]

deliveries are only accepted during the Regional Office's normal hours
of operation. The Regional Office's official hours of business are
Monday through Friday, 8:30 to 4:30, excluding Federal holidays.
    Please see the direct final rule which is located in the Rules
section of this Federal Register for detailed instructions on how to
submit comments.

FOR FURTHER INFORMATION CONTACT: Stacy Harder, Regulatory Development
Section, Air Planning Branch, Air, Pesticides and Toxics Management
Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth
Street, SW., Atlanta, Georgia 30303-8960. The telephone number is (404)
562-8965. Ms. Harder can also be reached via electronic mail at 
harder.stacy@epa.gov.

SUPPLEMENTARY INFORMATION: For additional information see the direct
final rule which is published in the Rules section of this Federal
Register.

    Dated: May 14, 2007.
Russell L. Wright, Jr.,
Acting Regional Administrator, Region 4.
[FR Doc. E7-10059 Filed 5-23-07; 8:45 am]
BILLING CODE 6560-50-P

 
 


Local Navigation


Jump to main content.