skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

 

 

July 15, 2003

 

MEMORANDUM TO:

William D. Travers
Executive Director for Operations

    /RA/
   
FROM: John T. Larkins, Executive Director
Advisory Committee on Reactor Safeguards
   
SUBJECT:

DRAFT FINAL REGULATORY GUIDE DG-1105, “PROCEDURES AND CRITERIA FOR ASSESSING SEISMIC SOIL LIQUEFACTION AT NUCLEAR POWER PLANT SITES”

During the 504th meeting of the Advisory Committee on Reactor Safeguards, July 9-11, 2003, the Committee considered the draft final Regulatory Guide DG-1105, “Procedures and Criteria for Assessing Seismic Soil Liquefaction at Nuclear Power Plant Sites,” and decided not to review it. The Committee has referred this Regulatory Guide to the Advisory Committee on Nuclear Waste for possible consideration.

Reference:

Memorandum dated July 2, 2003, from Michael E. Mayfield, Director, Division of Engineering Technology, RES, to John T. Larkins, Executive Director, ACRS, Subject: Request for ACRS Review of Draft Final of DG-1105, “Procedures and Criteria for Assessing Seismic Soil Liquefaction at Nuclear Power Plant Sites”

 

cc: A. Vietti-Cook, SECY
I. Schoenfeld, OEDO
A. Thadani, RES
M. Mayfield, RES
Y. Li, RES
J. Garrick, ACNW, w/ref.
H. Larson, ACNW, w/ref.