skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Letter Reports
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999

Advisory Committee on Reactor Safeguards (ACRS) 2008 Letter Reports

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Date Title EDO
Response
09/09/2008 Draft Final Regulatory Guide 10.7, 10.8, and 10.9 No Response Required
09/09/2008 Draft Regulatory Guides DG-1205, DG-1187, DG-1197, DG-1196, DG-3031, DG-0020, DG-5026, DG-1141, DG-3035, DG-5027, and DG-1203 No Response Required
09/09/2008 Purposed Interim Staff Guidance (ISG) DC/COL-ISG-06 No Response Required
09/09/2008 Withdrawal of Regulatory Guide 8.1, “Radiation Symbol” No Response Required
07/15/2008 Draft Regulatory Guides 1149 and 1189 No Response Required
07/23/2008 Stretch Power Uprate Application for the Millstone Power Station, Unit 3 08/13/2008
07/21/2008 Interim Letter 4: Chapter 3 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design  
07/18/2008 Security and Aircraft Impact Rulemaking for Nuclear Power Plants  
06/13/2008 Artist Test Program  
06/09/2008 Withdrawl of Regulatory Guide 1.139, "Guidance for Residual Heat Removal" No Response Required
06/09/2008 Draft Regulatory 1186, 4013, and 3034 No Response Required
06/09/2008 Draft Final Revision to 10 CFR 50.55a, "Codes and Standards" No Response Required
06/09/2008 Draft Final Regulatory Guide 4.21, "Minimization of Contamination and Radioactive Waste Generation: Life-Cycle Planning" No Response Required
06/03/2008 Response to the January 17, 2008, EDO Letter Regarding Susquehanna Steam Electric Station Units 1 and 2 Extended Power Uprate

 

05/30/2008 PHEBUS Fission Product (PHEBUS-FP) Progam  
05/23/2008 Interim Letter 3: Chapters 4, 6, 15, 18, and 21 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design 07/08/2008
05/19/2008 Draft Report NUREG/CR-6962, "Approaches to Using Traditional Probabilistic Rsik Assessment Methods for Digital Systems," and Related Matters 07/08/2008
05/15/2008 Withdrawal of Regulatory Guide 3.42 No Response Required
05/15/2008 Multiple Draft Regulatory Guides to be Issued as Final No Response Required
05/15/2008 Draft Regulatory Guides 3024 and 3033 No Response Required
05/15/2008 Draft Regulatory Guides 1178, 1190, 1198, and 1200 No Response Required
05/02/2008 Hope Creek Generating Station Extended Power Uprate Application 05/27/2008
04/29/2008 Digital Instrumentation and Control Systems Interim Staff Guidance  
04/23/2008 Regulatory Guide 1.210 No Response Required
04/23/2008 Proposed Stretch Power Uprate to Millstone Power Station, Unit 3  
04/23/2008 Proposed Regulatory Guides/Withdrawl of Certain Regulatory Guides No Response Required
04/23/2008 ACRS Review of Power Uprates

06/23/2008

04/21/2008 Response to Your April 7, 2008 Letter Regarding State-of-the Art Reactor Consequences Analyses (SOARCA) Project

 

03/20/2008

Report on the Safety Aspects of the License Renewal Application for the Vermont Yankee Nuclear Power Station

 
03/20/2008

Report on the Safety Aspects of the License Renewal Application for the James A. Fitzpatrick Nuclear Power Plant

04/24/2008
03/20/2008

Interim Letter: Chapters 9, 10, 13, and 16 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design

04/24/2008
03/06/2008

Review and Evaluation of the NRC Safety Research Program

04/11/2008
02/28/2008

Cable Response to Live Fire (Carolfire) Testing and Fire Model Improvement Program

04/01/2008
02/25/2008 State-of-the-Art Reactor Consequence Analyses (SOARCA) Project 04/07/2008
02/22/2008 Draft Final Revision 1 to Regulatory Guide 1.45, "Guidance on Monitoring and Responding to Reactor Coolant System Leakage"

 

02/19/2008

Final ACRS Review of the Vermont Yankee License Renewal Application

No Response Required


Privacy Policy | Site Disclaimer
Monday, September 22, 2008