File Name |
Date |
Description |
BL-83-08 |
12/28/1983 |
Elect. Circuit Breakers With Undervoltage Trip...in Safety-Related Applications
other than the Reactor Trip System |
BL-83-07s2 |
12/09/1983 |
Apparently Fraudulent Products Sold by Ray Miller, Inc. |
BL-83-07s1 |
10/26/1983 |
Apparently Fraudulent Products Sold by Ray Miller, Inc. |
BL-83-07 |
07/22/1983 |
Apparently Fraudulent Products Sold by Ray Miller, Inc. |
BL-83-06 |
07/22/1983 |
Nonconforming Materials Supplied by Tube-Line Facilities at Long Island
City, NY, Houston,TX, & Carol Stream,IL |
BL-83-05 |
05/13/1983 |
ASME Nuclear Code Pumps and Spare Parts Manufactured by the Hayward Tyler
Pump Company |
BL-83-04 |
03/11/1983 |
Failure of the Undervoltage Trip Function of Reactor Trip Breakers |
BL-83-03 |
03/10/1983 |
Check Valve Failures in Raw Water Cooling Systems of Diesel Generators
|
BL-83-02 |
03/04/1983 |
Stress Corrosion Cracking in Large-Diameter Stainless Steel Recirculation
System Piping at BWR Plants |
BL-83-01 |
02/25/1983 |
Failure of Trip Breakers (Westinghouse DB-50) to Open on Automatic Trip
Signal |