skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Bulletin
2007
2005
2004
2003
2002
2001
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987
1986
1985
1984
1983
1982
1981
1980
1979
1978
1977
1976
1975
1974
1973
1972
1971

Bulletins: 1979 Index

File Name Date Description
BL-79-26r1 08/29/1980 Boron Loss from BWR Control Blades
BL-79-01bs3 10/24/1980 Environmental Qualification of Class IE Equipment
BL-79-01bs2 09/30/1980 Environmental Qualification of Class IE Equipment
BL-79-03a 04/04/1980 Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe
BL-79-01bs1 02/29/1980 Environmental Qualification of Class IE Equipment
bl7901b.pdf PDF Icon 01/14/1980 Environmental Qualification of Class IE Equipment [ includes all enclosures ]
BL-79-01b 01/14/1980 Environmental Qualification of Class IE Equipment
BL-79-28 12/07/1979 Possible Malfunction of NAMCO Model EA180 Limit Switches at Elevated Temperatures
BL-79-27 11/30/1979 Loss of Non-Class-1-E Instrumentation and Control Power System Bus During Operation
BL-79-26 11/20/1979 Boron Loss from BWR Control Blades
BL-79-02r2 11/08/1979 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts
BL-79-25 11/02/1979 Failures of Westinghouse BFD Relays in Safety-Related Systems
BL-79-17r1 10/29/1979 Pipe Cracks in Stagnant Borated Water Systems at PWR Plants
BL-79-13r2 10/16/1979 Cracking in Feedwater System Piping
BL-79-24 09/27/1979 Frozen Lines
BL-79-23 09/12/1979 Potential Failure of Emergency Diesel Generator Field Exciter Transformer
BL-79-14r1s2 09/07/1979 Seismic Analyses for As-Built Safety-Related Piping Systems
BL-79-22 09/05/1979 Possible Leakage of Tubes of Tritium Gas Used in Time Pieces for Luminosity
BL-79-13r1 08/30/1979 Cracking in Feedwater System Piping
BL-79-02r1s1 08/20/1979 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts
BL-79-14r1s1 08/15/1979 Seismic Analyses for As-Built Safety-Related Piping Systems
BL-79-21 08/13/1979 Temperature Effects on Level Measurements
BL-79-20 08/10/1979 Packaging, Transport and Burial of Low-Level Radioactive Waste
BL-79-19 08/10/1979 Packaging of Low-Level Radioactive Waste for Transport and Burial
BL-79-18 08/07/1979 Audibility Problems Encountered on Evacuation of Personnel from High-Noise Areas
BL-79-17 07/26/1979 Pipe Cracks in Stagnant Borated Water Systems at PWR Plants
BL-79-16 07/26/1979 Vital Area Access Controls
BL-79-05c 07/26/1979 Nuclear Incident at Three Mile Island - Supplement
BL-79-06c 07/26/1979 Review of Operational Errors and System Misalignments Identified During the Three Mile Island Incident
BL-79-15s1   Deep Draft Pump Deficiencies -
BL-79-15 07/11/1979 Deep Draft Pump Deficiencies -
BL-79-14r1 07/02/1979 Seismic Analyses for As-Built Safety-Related Piping Systems
BL-79-14 07/02/1979 Seismic Analyses for As-Built Safety-Related Piping Systems
BL-79-13 06/25/1979 Cracking in Feedwater System Piping
BL-79-02r1 06/21/1979 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts
BL-79-01a 06/06/1979 Environmental Qualification of Class IE Equipment (Deficiencies, ASCO Solenoid Valves)
BL-79-12 05/31/1979 Short Period Scrams at BWR Facilities
BL-79-11 05/22/1979 Faulty Overcurrent Trip Device in Circuit Breakers for Engineered Safety Systems
BL-79-10 05/11/1979 Requalification Training Program Statistics
BL-79-05b 04/21/1979 Nuclear Incident at Three Mile Island - Supplement
BL-79-06ar1 04/18/1979 Review of Operational Errors and System Misalignments Identified During the Three Mile Island Incident
BL-79-09 04/17/1979 Failures of GE Type AK-2 Circuit Breaker in Safety Related Systems
BL-79-08 04/14/1979 Events Relevant to Boiling Water Reactors Identified During Three Mile Island Incident
BL-79-07 04/14/1979 Seismic Stress Analysis of Safety-Related Piping
BL-79-06b 04/14/1979 Review of Operational Errors and System Misalignments Identified During the Three Mile Island Incident
BL-79-06a 04/14/1979 Review of Operational Errors and System Misalignments Identified During the Three Mile Island Incident
BL-79-06 04/11/1979 Review of Operational Errors and System Misalignments Identified During the Three Mile Island Incident
BL-79-05a 04/05/1979 Nuclear Incident at Three Mile Island
BL-79-05 04/01/1979 Nuclear Incident at Three Mile Island
BL-79-04 03/30/1979 Incorrect Weights for Swing Check Valves Manufactured by Velan Engineering Corporation
BL-79-03 03/12/1979 Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Mfg. by Youngstown Welding & Engrg
BL-79-02 03/08/1979 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts
BL-79-01r1 02/27/1979 Environmental Qualification of Class 1E Equipment
BL-79-01 02/08/1979 Environmental Qualification of Class IE Equipment


Privacy Policy | Site Disclaimer
Monday, February 19, 2007