Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
REVIEWING SYSTEM PLANNING OPERATING GUIDE FOR SOLAR FLARE RESPONSE |
* |
|
Braidwood 2 |
90 |
|
COASTDOWN TO REFUELING OUTAGE
REVIEWING SYSTEM PLANNING OPERATING GUIDE FOR SOLAR FLARE RESPONSE |
* |
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
47 |
|
OFFGAS INLEAKAGE INVESTIGATION |
* |
|
D.C. Cook 1 |
0 |
10/17/2003 |
DEFUELED |
* |
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
0 |
02/15/2002 |
MAINTENANCE OUTAGE |
|
|
Dresden 2 |
0 |
10/14/2003 |
REFUELING OUTAGE |
|
|
Dresden 3 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
94 |
|
100% ELECTRICAL CAPABILITY
NO D/G OR SWITCHYARD WORK DUE TO SOLAR FLARE RESPONSE |
* |
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
COMPENSATORY MONITORING OF RELAYS IN CONTROL ROOM FOR SOLAR FLARE RESPONSE |
* |
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
83 |
|
INCREASING POWER FOLLOWING A DECREASE IN POWER DUE TO GRID GEO-MAGNETIC DISTURBANCES |
* |
|
Point Beach 2 |
0 |
10/03/2003 |
REFUELING OUTAGE |
|
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
Quad Cities 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
HOLDING OFF ON SWITCHYARD MAINTENANCE FOR SOLAR FLARE RESPONSE |
* |
|
Arkansas Nuclear 2 |
100 |
|
HOLDING OFF ON SWITCHYARD MAINTENANCE FOR SOLAR FLARE RESPONSE |
* |
|
Callaway |
100 |
|
|
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
100 |
|
CANCELLED D/G SURVEILLANCE DUE TO SOLAR FLARE RESPONSE |
* |
|
Comanche Peak 2 |
28 |
|
HOLDING FOR TURBINE TESTING |
* |
|
Cooper |
0 |
10/28/2003 |
SWITCHYARD REPAIR |
* |
|
Diablo Canyon 1 |
100 |
|
LIMITING UNPLANNED WORK ON TRIP MIDIGATION EQUIPMENT |
* |
|
Diablo Canyon 2 |
100 |
|
LIMITING UNPLANNED WORK ON TRIP MIDIGATION EQUIPMENT |
* |
|
Fort Calhoun |
1 |
|
PERFORMING LOW POWER PHYSICS TEST @ <1% POWER |
* |
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
98 |
|
T-HOT LIMITED
TAKING EXTRA READINGS ON PLANT COMPUTER DUE TO SOLAR FLARE RESPONSE |
* |
|
Palo Verde 2 |
0 |
09/26/2003 |
DEFUELED |
|
|
Palo Verde 3 |
99 |
|
T-HOT LIMITED
TAKING EXTRA READINGS ON PLANT COMPUTER DUE TO SOLAR FLARE RESPONSE |
* |
|
River Bend 1 |
100 |
|
NO D/G OR RELAY TESTING DUE TO SOLAR FLARE RESPONSE |
* |
|
San Onofre 2 |
100 |
|
NEAREST FIRE IS 30 MILES AWAY IN SAN BERNADINO |
* |
|
San Onofre 3 |
100 |
|
NEAREST FIRE IS 30 MILES AWAY IN SAN BERNARDINO |
* |
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
0 |
10/19/2003 |
REFUELING OUTAGE |
|
|
Wolf Creek 1 |
0 |
10/18/2003 |
DEFUELED |
|
|