Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BROWNS FERRY 1 |
0 |
03/03/1985 |
Cold Shutdown DEFUELED |
|
|
BROWNS FERRY 2 |
85 |
|
Power Operation POWER REDUCED FOR REACTOR FEED PUMP MAINTENANCE |
* |
|
BROWNS FERRY 3 |
100 |
|
|
|
|
BRUNSWICK 1 |
94 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
BRUNSWICK 2 |
96 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
CATAWBA 1 |
100 |
|
|
|
|
CATAWBA 2 |
100 |
|
|
|
|
CRYSTAL RIVER 3 |
100 |
|
|
|
|
FARLEY 1 |
0 |
03/28/2003 |
Refueling REFUELING OUTAGE |
* |
|
FARLEY 2 |
100 |
|
|
|
|
HARRIS 1 |
100 |
|
|
|
|
HATCH 1 |
0 |
04/18/2003 |
Cold Shutdown MAINTENANCE OUTAGE |
* |
|
HATCH 2 |
100 |
|
|
|
|
MCGUIRE 1 |
100 |
|
|
* |
|
MCGUIRE 2 |
100 |
|
|
|
|
NORTH ANNA 1 |
0 |
04/19/2003 |
Hot Standby REACTOR TRIP - SEE EVENT # 39773 |
* |
1 |
NORTH ANNA 2 |
100 |
|
|
|
|
OCONEE 1 |
100 |
|
|
|
|
OCONEE 2 |
100 |
|
|
|
|
OCONEE 3 |
78 |
|
Power Operation COASTDOWN TO REFUELING OUTAGE |
* |
|
ROBINSON 2 |
100 |
|
|
|
|
SAINT LUCIE 1 |
100 |
|
|
|
|
SAINT LUCIE 2 |
85 |
|
Power Operation PLANT SHUTDOWN IN PROGRESS FOR OUTAGE |
* |
|
SEQUOYAH 1 |
0 |
03/16/2003 |
Refueling REFUELING OUTAGE - DEFUELED |
|
|
SEQUOYAH 2 |
100 |
|
|
|
|
SUMMER 1 |
100 |
|
|
|
|
SURRY 1 |
0 |
04/19/2003 |
Hot Shutdown SHUTDOWN FOR REFUELING OUTAGE |
* |
|
SURRY 2 |
100 |
|
|
|
|
TURKEY POINT 3 |
100 |
|
|
|
|
TURKEY POINT 4 |
100 |
|
|
|
|
VOGTLE 1 |
100 |
|
|
|
|
VOGTLE 2 |
100 |
|
|
|
|
WATTS BAR 1 |
100 |
|
|
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
0 |
04/14/2003 |
Refueling REFUELING OUTAGE |
|
|
BRAIDWOOD 2 |
100 |
|
|
|
|
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
100 |
|
|
|
|
CLINTON 1 |
91 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
COOK 1 |
100 |
|
|
|
|
COOK 2 |
100 |
|
|
|
|
DAVIS BESSE 1 |
0 |
02/15/2002 |
Cold Shutdown REFUELING OUTAGE |
|
|
DRESDEN 2 |
97 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
DRESDEN 3 |
97 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
* |
|
DUANE ARNOLD 1 |
3 |
|
Startup PREPARATION TO START UP |
* |
|
FERMI 2 |
0 |
03/28/2003 |
Refueling REFUELING OUTAGE |
|
|
KEWAUNEE 1 |
0 |
04/04/2003 |
Refueling REFUELING OUTAGE - DEFUELED |
|
|
LASALLE 1 |
64 |
|
Power Operation REDUCED POWER FOR LOW PRESSURE HEATER REPAIR |
* |
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
5 |
|
Startup PREPARATIONS TO GO ONLINE |
* |
|
PERRY 1 |
0 |
04/04/2003 |
Refueling REFUELING OUTAGE |
|
|
POINT BEACH 1 |
100 |
|
|
|
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
2 |
|
Startup HOLDING DUE TO 1GT TRANSFORMER OUT OF SERVICE |
* |
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
98 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
QUAD CITIES 2 |
0 |
|
Hot Shutdown REACTOR START UP |
* |
|