Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
0 |
04/14/2003 |
Refueling REFUELING OUTAGE |
* |
|
BRAIDWOOD 2 |
100 |
|
|
|
|
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
100 |
|
|
|
|
CLINTON 1 |
91 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
COOK 1 |
100 |
|
|
|
|
COOK 2 |
100 |
|
|
|
|
DAVIS BESSE 1 |
0 |
02/15/2002 |
Cold Shutdown REFUELING OUTAGE |
|
|
DRESDEN 2 |
97 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
DRESDEN 3 |
97 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
DUANE ARNOLD 1 |
2 |
|
Startup STARTUP IN PROGRESS - CURRENTLY HOLDING FOR TESTING |
* |
|
FERMI 2 |
0 |
03/28/2003 |
Refueling REFUELING OUTAGE |
|
|
KEWAUNEE 1 |
0 |
04/04/2003 |
Refueling REFUELING OUTAGE - DEFUELED |
|
|
LASALLE 1 |
96 |
|
Power Operation REDUCED POWER TO MAINTAIN CONDENSATE BOOSTER PRESSURE DUE TO TUBE LEAK IN 14C HEATER |
* |
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
0 |
03/16/2003 |
Hot Standby RCS HEATUP IN PROGRESS |
* |
|
PERRY 1 |
0 |
04/04/2003 |
Refueling REFUELING OUTAGE |
|
|
POINT BEACH 1 |
100 |
|
|
|
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
1 |
|
Startup HOLDING DUE TO 1GT TRANSFORMER OUT OF SERVICE |
* |
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
98 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
QUAD CITIES 2 |
0 |
04/16/2003 |
Cold Shutdown SRV STUCK OPEN EVENT/MANUAL SCRAM, SEE EN #39765 |
|
|