Power Reactor Status Report for December 17, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

To top of page
Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 25   REDUCED POWER FOR VOLTAGE REGULATOR WORK - CURRENTLY INCREASING POWER TO 100% *  
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100     *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 94   REDUCED LOAD FOR SCHEDULED TESTING *  
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   OFFSITE POWER LINE "220-34" IS INOP BUT AVAILABLE *  
Peach Bottom 3 100   OFFSITE POWER LINE "220-34" IS INOP BUT AVAILABLE *  
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100   GENERATOR VOLTAGE REGULATOR IN MANUAL    
Susquehanna 2 100     *  
Three Mile Island 1 100     *  
Vermont Yankee 100        

Region 2

To top of page
Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 REFUELING OUTAGE - CORE RELOAD IN PROGRESS - ANTICIPATE COMPLETION ON 12/25 *  
Browns Ferry 2 100   1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE 1 OF 2 161 KV LINES OOS FOR PLANNED MAINTENANCE    
Browns Ferry 3 100   1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE 1 OF 2 161 KV LINES OOS FOR PLANNED MAINTENANCE    
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 0 11/10/2006 REFUELING OUTAGE - CORE RELOAD IN PROGRESS *  
Catawba 2 100   CURRENTLY SUPPLYING AUX STEAM TO UNIT 1    
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100     *  
North Anna 2 100     *  
Oconee 1 20   HOLDING POWER - TURBINE GENERATOR TESTING *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 11/26/2006 REFUELING OUTAGE - RV HEAD SET BUT NOT TENSIONED *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 98        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

To top of page
Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 96   FW PUMP SWAP *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 97   100% ELECTRICAL CAPABILITY    
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 99        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 0 12/13/2006 FORCED OUTAGE - INSTRUMENT AIR REPAIRS COMPLETED *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100     *  
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

To top of page
Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100   1 X 500 KV LINE (BREAKER 632) WILL BE TAKEN OOS FOR PLANNED MAINTENANCE    
Diablo Canyon 2 54   UNIT WILL RETURN TO FULL POWER ONCE CIRC WATER PUMP REPAIRS ARE COMPLETED NEXT WEEK    
Fort Calhoun 98   REDUCED POWER IN PREPARATION FOR MTC TESTING ON 12/17    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 99   S/G BLOWDOWN *  
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 34   INCREASING POWER *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 11/25/2006 REFUELING OUTAGE    
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.