Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
96 |
|
NEAR 100% ELECTRICAL CAPABILITY - 4B FEEDWATER HEATER OUT OF SERVICE |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Dresden 3 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
94 |
|
100 % ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
15 |
|
TECH SPEC REQUIRED SHUTDOWN (SEE EN# 41423) |
* |
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
0 |
02/07/2005 |
REFUELING OUTAGE |
|
|
Monticello |
91 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Palisades |
100 |
|
|
|
|
Perry 1 |
92 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
0 |
02/18/2005 |
PLANNED MAINTENANCE OUTAGE |
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
85 |
|
LIMITED IN POWER (STEAM DRYER MONITORING) |
|
|
Quad Cities 2 |
85 |
|
LIMITED IN POWER (STEAM DRYER MONITORING) |
|
|