Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
92 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
0 |
01/17/2005 |
MID CYCLE OUTAGE |
|
|
Dresden 2 |
96 |
|
CHECKING FOR STEAM DRYER MOISTURE CARRYOVER |
* |
|
Dresden 3 |
96 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Duane Arnold |
94 |
|
100 % ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
0 |
01/24/2005 |
NORMAL STARTUP IN PROGRESS |
* |
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
98 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
68 |
|
READJUSTING ROD LINE PRIOR TO POWER ASCENSION |
* |
|
Point Beach 1 |
100 |
|
|
* |
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
98 |
|
GENERATOR HYDROGEN SEAL OIL SYSTEM ISSUE |
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
85 |
|
LIMITED IN POWER (STEAM DRYER MONITORING) |
|
|
Quad Cities 2 |
85 |
|
LIMITED IN POWER (STEAM DRYER MONITORING) |
|
|