Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
92 |
|
REDUCING REACTOR POWER LEVEL FOR TURBINE VALVE TESTING |
* |
|
BRAIDWOOD 2 |
100 |
|
|
|
|
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
100 |
|
|
|
|
CLINTON 1 |
100 |
|
|
|
|
COOK 1 |
0 |
09/08/1997 |
REFUELING OUTAGE - DEFUELED |
|
|
COOK 2 |
0 |
09/09/1997 |
REFUELING OUTAGE - DEFUELED |
|
|
DAVIS BESSE 1 |
96 |
|
REDUCED REACTOR POWER LEVEL FOR MODERATOR TEMPERATURE COEFFICIENT TESTING. |
* |
|
DRESDEN 2 |
100 |
|
|
|
|
DRESDEN 3 |
0 |
12/11/1999 |
Reactor Scrammed during the oil trip test portion of the Turbine Weekly Surv |
* |
|
DUANE ARNOLD 1 |
98 |
|
|
* |
|
FERMI 2 |
64 |
|
REDUCED REACTOR POWER LEVEL FOR ROD SHUFFLE AND TURBINE VALVE TESTING. |
* |
|
KEWAUNEE 1 |
97 |
|
|
|
|
LASALLE 1 |
100 |
|
|
|
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
90 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
PALISADES 1 |
3 |
|
WAITING TO SYNCHRONIZE THE MAIN TURBINE. |
* |
|
PERRY 1 |
100 |
|
|
|
|
POINT BEACH 1 |
29 |
|
HOLDING POWER LEVEL UNTIL UNIT 2 COMPLETES TESTING |
* |
|
POINT BEACH 2 |
79 |
|
REDUCED REACTOR POWER LEVEL FOR TURBINE VALVE TESTING |
* |
|
PRAIRIE ISLAND 1 |
40 |
|
REDUCED REACTOR POWER LEVEL FOR TURBINE VALVE TESTING |
* |
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
83 |
|
REDUCING REACTOR POWER TO RETURN SOME RODS TO SERVICE. |
* |
|
QUAD CITIES 2 |
100 |
|
|
|
|