Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BEAVER VALLEY 1 |
46 |
|
HOLDING POWER AT THIS LEVEL DUE TO GRID DEMAND - EHC POWER SUPPLY REPLACEMEN |
* |
|
BEAVER VALLEY 2 |
100 |
|
|
|
|
CALVERT CLIFFS 1 |
100 |
|
|
|
|
CALVERT CLIFFS 2 |
100 |
|
|
|
|
FITZPATRICK 1 |
91 |
|
INCREASING POWER FOLLOWING SCRAM RECOVERY AND A FORCED OUTAGE |
* |
|
GINNA 1 |
98 |
|
INCREASING POWER AFTER PERFORMING A LOAD REDUCTION TO APPROXIMATELY 50% POWE |
* |
|
HOPE CREEK 1 |
87 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING |
* |
|
INDIAN POINT 2 |
99 |
|
|
|
|
INDIAN POINT 3 |
61 |
|
HOLDING POWER AT THIS LEVEL - PREPARING TO PLACE MAIN BOILER FEED PUMP ON LI |
* |
|
LIMERICK 1 |
100 |
|
|
|
|
LIMERICK 2 |
100 |
|
|
|
|
MILLSTONE 2 |
100 |
|
|
|
|
MILLSTONE 3 |
100 |
|
|
|
|
NINE MILE POINT 1 |
1 |
|
EXITING A MAINTENANCE OUTAGE FOR RECIRC PUMP SEAL REPLACEMENT |
* |
|
NINE MILE POINT 2 |
100 |
|
|
|
|
OYSTER CREEK 1 |
100 |
|
|
|
|
PEACH BOTTOM 2 |
100 |
|
|
|
|
PEACH BOTTOM 3 |
75 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM PCIS GROUP 1 LOGIC TESTING |
* |
|
PILGRIM 1 |
100 |
|
|
|
|
SALEM 1 |
100 |
|
|
|
|
SALEM 2 |
93 |
|
INCREASING POWER AFTER PERFORMING MAINTENANCE ON MAIN FEEDWATER PUMP |
* |
|
SEABROOK 1 |
100 |
|
|
|
|
SUSQUEHANNA 1 |
100 |
|
|
|
|
SUSQUEHANNA 2 |
100 |
|
|
|
|
THREE MILE ISLAND 1 |
100 |
|
|
|
|
VERMONT YANKEE 1 |
0 |
10/29/1999 |
REFUELING OUTAGE - FUEL PARTIALLY OFFLOADED |
* |
|
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
100 |
|
|
|
|
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
0 |
10/23/1999 |
EXITING REFUELING OUTAGE |
* |
|
CLINTON 1 |
100 |
|
|
|
|
COOK 1 |
0 |
09/08/1997 |
REFUELING OUTAGE - DEFUELED |
|
|
COOK 2 |
0 |
09/09/1997 |
REFUELING OUTAGE - DEFUELED |
|
|
DAVIS BESSE 1 |
100 |
|
|
|
|
DRESDEN 2 |
42 |
|
INCREASING POWER TO APPROXIMATELY 55% TO CONTINUE TROUBLESHOOTING CONDENSATE |
* |
|
DRESDEN 3 |
100 |
|
|
|
|
DUANE ARNOLD 1 |
0 |
10/22/1999 |
REFUELING OUTAGE - SECOND FUEL SHUFFLE COMPLETE |
* |
|
FERMI 2 |
97 |
|
|
|
|
KEWAUNEE 1 |
97 |
|
|
|
|
LASALLE 1 |
0 |
10/23/1999 |
REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS |
* |
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
99 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
PALISADES 1 |
0 |
10/15/1999 |
REFUELING OUTAGE - REDUCED INVENTORY (AT TOP OF HOT LEG) |
* |
|
PERRY 1 |
100 |
|
|
|
|
POINT BEACH 1 |
0 |
10/15/1999 |
REFUELING OUTAGE - FUEL RELOAD IN PROGRESS |
* |
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
100 |
|
|
* |
|
QUAD CITIES 2 |
60 |
|
HOLDING POWER AT THIS LEVEL FOR FLUX MONITORING TESTING TO IDENTIFY A POTENT |
* |
|