Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
90 |
|
INCREASING POWER TO 100% |
* |
|
BRAIDWOOD 2 |
100 |
|
|
|
|
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
0 |
10/23/1999 |
ENTERING REFUELING OUTAGE |
* |
|
CLINTON 1 |
100 |
|
|
|
|
COOK 1 |
0 |
09/08/1997 |
REFUELING OUTAGE - DEFUELED |
|
|
COOK 2 |
0 |
09/09/1997 |
REFUELING OUTAGE - DEFUELED |
|
|
DAVIS BESSE 1 |
10 |
|
MAIN TURBINE OFF LINE - REPAIRING SEAL OIL LEAK ON THE MAIN GENERATOR |
|
|
DRESDEN 2 |
0 |
10/01/1999 |
REACTOR VESSEL HEAD HAS BEEN TENSIONED. |
|
|
DRESDEN 3 |
100 |
|
|
|
|
DUANE ARNOLD 1 |
0 |
10/22/1999 |
ENTERING REFUELING OUTAGE |
|
|
FERMI 2 |
97 |
|
|
|
|
KEWAUNEE 1 |
97 |
|
|
|
|
LASALLE 1 |
0 |
10/22/1999 |
ENTERING REFUELING OUTAGE |
|
|
LASALLE 2 |
95 |
|
WILL BE DECREASING POWER TO 90% TODAY FOR SCHEDULED SURVEILLANCE |
* |
|
MONTICELLO 1 |
40 |
|
REDUCED POWER FOR CONDENSER CLEANING |
* |
|
PALISADES 1 |
0 |
10/15/1999 |
REFUELING OUTAGE - MID LOOP OPERATION TO INSTALL STEAM GENERATOR NOZZLE DA |
* |
|
PERRY 1 |
100 |
|
|
|
|
POINT BEACH 1 |
0 |
10/15/1999 |
ENTERING REFUELING OUTAGE |
|
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
100 |
|
|
|
|
QUAD CITIES 2 |
100 |
|
|
|
|