Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BEAVER VALLEY 1 |
62 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM PLANNED MAINTENANCE ON A FEEDWATER PU |
* |
|
BEAVER VALLEY 2 |
100 |
|
|
|
|
CALVERT CLIFFS 1 |
0 |
05/10/1999 |
MAINTENANCE OUTAGE |
* |
|
CALVERT CLIFFS 2 |
100 |
|
|
|
|
FITZPATRICK 1 |
100 |
|
|
|
|
GINNA 1 |
98 |
|
OPERATING AT REDUCED LOAD DUE TO DELTA-T SETPOINT ISSUES |
* |
|
HOPE CREEK 1 |
100 |
|
|
|
|
INDIAN POINT 2 |
99 |
|
MAXIMUM OPERATING POWER DUE TO STEAM FLOW DEMAND - TURBINE THROTTLE VALVES F |
|
|
INDIAN POINT 3 |
63 |
|
HOLDING POWER AT THIS LEVEL DUE TO A HEATER DRAIN TANK PUMP TRIP |
* |
|
LIMERICK 1 |
100 |
|
|
|
|
LIMERICK 2 |
0 |
04/16/1999 |
REFUELING OUTAGE - REACTOR VESSEL HEAD IN PLACE BUT NOT TENSIONED |
* |
|
MILLSTONE 2 |
63 |
|
INCREASING POWER TO 75% FOR AN NRC HOLD |
* |
|
MILLSTONE 3 |
0 |
05/01/1999 |
REFUELING OUTAGE - FUEL OFFLOAD SUSPENDED DUE TO PROBLEMS WITH SIGMA MACHINE |
|
|
NINE MILE POINT 1 |
0 |
04/11/1999 |
REFUELING OUTAGE - DEFUELED |
|
|
NINE MILE POINT 2 |
100 |
|
|
|
|
OYSTER CREEK 1 |
100 |
|
|
* |
|
PEACH BOTTOM 2 |
100 |
|
|
|
|
PEACH BOTTOM 3 |
100 |
|
|
|
|
PILGRIM 1 |
0 |
05/08/1999 |
REFUELING OUTAGE - FIRST PHASE OF FUEL SHUFFLE COMPLETE |
* |
|
SALEM 1 |
100 |
|
|
|
|
SALEM 2 |
0 |
04/03/1999 |
REFUELING OUTAGE |
|
|
SEABROOK 1 |
89 |
|
INCREASING POWER AFTER EXITING A REFUELING OUTAGE |
* |
|
SUSQUEHANNA 1 |
100 |
|
|
|
|
SUSQUEHANNA 2 |
100 |
|
|
|
|
THREE MILE ISLAND 1 |
100 |
|
|
|
|
VERMONT YANKEE 1 |
100 |
|
|
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
LOAD REDUCED TO 15% ON 05/16/99 DUE TO A TECH SPEC REQUIRED SHUTDOWN RESULTI |
* |
|
BRAIDWOOD 2 |
0 |
04/23/1999 |
REFUELING OUTAGE |
|
|
BYRON 1 |
0 |
05/13/1999 |
AUTOMATIC REACTOR TRIP FROM 100% POWER DUE TO AN INADVERTENT POWER RANGE HIG |
* |
|
BYRON 2 |
100 |
|
|
|
|
CLINTON 1 |
0 |
05/14/1999 |
REFUELING OUTAGE - MANUAL REACTOR SCRAM FROM 4% POWER DUE TO A LEVEL TRANSIE |
|
|
COOK 1 |
0 |
09/08/1997 |
MAINTENANCE OUTAGE |
|
|
COOK 2 |
0 |
09/09/1997 |
REFUELING OUTAGE |
|
|
DAVIS BESSE 1 |
100 |
|
|
|
|
DRESDEN 2 |
100 |
|
|
* |
|
DRESDEN 3 |
99 |
|
|
* |
|
DUANE ARNOLD 1 |
100 |
|
|
|
|
FERMI 2 |
97 |
|
ADMINISTRATIVE POWER LIMIT |
|
|
KEWAUNEE 1 |
97 |
|
POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING |
|
|
LASALLE 1 |
100 |
|
|
|
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
0 |
05/08/1999 |
MAINTENANCE OUTAGE |
|
|
PALISADES 1 |
0 |
05/07/1999 |
MAINTENANCE OUTAGE - AT NORMAL OPERATING TEMPERATURE AND PRESSURE |
* |
|
PERRY 1 |
100 |
|
|
|
|
POINT BEACH 1 |
0 |
05/14/1999 |
MANUAL REACTOR TRIP FROM 100% POWER AND MANUAL SAFETY INJECTION DUE TO A STE |
|
|
POINT BEACH 2 |
30 |
|
HOLDING POWER AT THIS LEVEL FOLLOWING INSPECTION OF THE #4 FEEDWATER HEATERS |
* |
|
PRAIRIE ISLAND 1 |
0 |
04/16/1999 |
REFUELING OUTAGE - REACTOR VESSEL HEAD ON AND TENSIONED - PREPARING FOR FILL |
* |
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
100 |
|
|
|
|
QUAD CITIES 2 |
100 |
|
|
|
|