Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BEAVER VALLEY 1 |
60 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM PLANNED MAINTENANCE ON A FEEDWATER PU |
* |
|
BEAVER VALLEY 2 |
100 |
|
|
|
|
CALVERT CLIFFS 1 |
0 |
05/10/1999 |
MAINTENANCE OUTAGE - PREPARING TO ENTER MODE 4 |
* |
|
CALVERT CLIFFS 2 |
100 |
|
|
* |
|
FITZPATRICK 1 |
100 |
|
|
|
|
GINNA 1 |
98 |
|
OPERATING AT REDUCED LOAD DUE TO DELTA-T SETPOINT ISSUES |
|
|
HOPE CREEK 1 |
100 |
|
|
|
|
INDIAN POINT 2 |
99 |
|
MAXIMUM OPERATING POWER DUE TO STEAM FLOW DEMAND - TURBINE THROTTLE VALVES F |
|
|
INDIAN POINT 3 |
100 |
|
|
|
|
LIMERICK 1 |
100 |
|
|
|
|
LIMERICK 2 |
0 |
04/16/1999 |
REFUELING OUTAGE - FUEL MOVES COMPLETE - REACTOR REASSEMBLY IN PROGRESS |
* |
|
MILLSTONE 2 |
19 |
|
INCREASING POWER TO 29% FOR AN NRC HOLD |
* |
|
MILLSTONE 3 |
0 |
05/01/1999 |
REFUELING OUTAGE - FUEL OFFLOAD SUSPENDED DUE TO PROBLEMS WITH SIGMA MACHINE |
* |
|
NINE MILE POINT 1 |
0 |
04/11/1999 |
REFUELING OUTAGE - DEFUELED |
|
|
NINE MILE POINT 2 |
100 |
|
|
|
|
OYSTER CREEK 1 |
70 |
|
DECREASING TO 65% POWER TO PERFORM PLANNED MAINTENANCE ON A FEEDWATER HEATER |
* |
|
PEACH BOTTOM 2 |
72 |
|
INCREASING POWER AFTER REDUCING POWER TO THIS LEVEL TO PERFORM MAIN STEAM IS |
* |
|
PEACH BOTTOM 3 |
100 |
|
|
|
|
PILGRIM 1 |
0 |
05/08/1999 |
REFUELING OUTAGE - FUEL OFFLOAD AND FUEL SHUFFLE IN PROGRESS |
|
|
SALEM 1 |
100 |
|
|
|
|
SALEM 2 |
0 |
04/03/1999 |
REFUELING OUTAGE |
|
|
SEABROOK 1 |
49 |
|
INCREASING POWER AFTER EXITING A REFUELING OUTAGE |
* |
|
SUSQUEHANNA 1 |
100 |
|
|
|
|
SUSQUEHANNA 2 |
100 |
|
|
|
|
THREE MILE ISLAND 1 |
100 |
|
|
|
|
VERMONT YANKEE 1 |
100 |
|
|
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
0 |
04/23/1999 |
REFUELING OUTAGE |
|
|
BYRON 1 |
0 |
05/13/1999 |
AUTOMATIC REACTOR TRIP FROM 100% POWER DUE TO AN INADVERTENT POWER RANGE HIG |
* |
|
BYRON 2 |
100 |
|
|
|
|
CLINTON 1 |
0 |
05/14/1999 |
REFUELING OUTAGE - MANUAL REACTOR SCRAM FROM 4% POWER DUE TO A LEVEL TRANSIE |
* |
1 |
COOK 1 |
0 |
09/08/1997 |
MAINTENANCE OUTAGE |
|
|
COOK 2 |
0 |
09/09/1997 |
REFUELING OUTAGE |
|
|
DAVIS BESSE 1 |
100 |
|
|
|
|
DRESDEN 2 |
99 |
|
|
* |
|
DRESDEN 3 |
99 |
|
|
|
|
DUANE ARNOLD 1 |
100 |
|
|
|
|
FERMI 2 |
97 |
|
ADMINISTRATIVE POWER LIMIT |
|
|
KEWAUNEE 1 |
97 |
|
POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING |
|
|
LASALLE 1 |
100 |
|
|
|
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
0 |
05/08/1999 |
MAINTENANCE OUTAGE |
|
|
PALISADES 1 |
0 |
05/07/1999 |
MAINTENANCE OUTAGE - REACTOR COOLANT SYSTEM SOLID - HEATUP IN PROGRESS |
* |
|
PERRY 1 |
100 |
|
|
|
|
POINT BEACH 1 |
0 |
05/14/1999 |
MANUAL REACTOR TRIP FROM 100% POWER AND MANUAL SAFETY INJECTION DUE TO A STE |
* |
1 |
POINT BEACH 2 |
52 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM INSPECTION ON THE #4 FEEDWATER HEATER |
* |
|
PRAIRIE ISLAND 1 |
0 |
04/16/1999 |
REFUELING OUTAGE - FUEL RELOAD COMPLETE |
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
100 |
|
|
|
|
QUAD CITIES 2 |
100 |
|
|
|
|