Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BEAVER VALLEY 1 |
100 |
|
|
|
|
BEAVER VALLEY 2 |
100 |
|
|
|
|
CALVERT CLIFFS 1 |
0 |
05/10/1999 |
MAINTENANCE OUTAGE |
|
|
CALVERT CLIFFS 2 |
97 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM POST-REFUELING OUTAGE TESTING |
|
|
FITZPATRICK 1 |
100 |
|
|
|
|
GINNA 1 |
96 |
|
OPERATING AT REDUCED LOAD DUE TO DELTA-T SETPOINT ISSUES |
|
|
HOPE CREEK 1 |
70 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM CONDENSER TUBE REPAIRS AND PLANNED MA |
* |
|
INDIAN POINT 2 |
99 |
|
MAXIMUM OPERATING POWER DUE TO STEAM FLOW DEMAND - TURBINE THROTTLE VALVES F |
|
|
INDIAN POINT 3 |
100 |
|
|
|
|
LIMERICK 1 |
100 |
|
|
|
|
LIMERICK 2 |
0 |
04/16/1999 |
REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS |
|
|
MILLSTONE 2 |
15 |
|
PREPARING TO TAKE UNIT OFF LINE TO PERFORM TURBINE OVERSPEED TESTING |
* |
|
MILLSTONE 3 |
0 |
05/01/1999 |
REFUELING OUTAGE - PREPARING TO PERFORM FUEL OFFLOAD |
* |
|
NINE MILE POINT 1 |
0 |
04/11/1999 |
REFUELING OUTAGE - DEFUELED |
|
|
NINE MILE POINT 2 |
100 |
|
|
|
|
OYSTER CREEK 1 |
100 |
|
|
|
|
PEACH BOTTOM 2 |
100 |
|
|
|
|
PEACH BOTTOM 3 |
100 |
|
|
|
|
PILGRIM 1 |
0 |
05/08/1999 |
REFUELING OUTAGE - PREPARING TO PERFORM FUEL SHUFFLE |
* |
|
SALEM 1 |
100 |
|
|
|
|
SALEM 2 |
0 |
04/03/1999 |
REFUELING OUTAGE |
|
|
SEABROOK 1 |
1 |
|
REFUELING OUTAGE - COMPLETED LOW POWER PHYSICS TESTING |
* |
|
SUSQUEHANNA 1 |
100 |
|
|
|
|
SUSQUEHANNA 2 |
100 |
|
|
|
|
THREE MILE ISLAND 1 |
100 |
|
|
|
|
VERMONT YANKEE 1 |
100 |
|
|
|
|