Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BEAVER VALLEY 1 |
98 |
|
MAXIMUM OPERATING POWER DUE TO AN OUT OF SERVICE MOISTURE SEPARATOR REHEATER |
|
|
BEAVER VALLEY 2 |
0 |
02/26/1999 |
REFUELING OUTAGE |
|
|
CALVERT CLIFFS 1 |
100 |
|
|
|
|
CALVERT CLIFFS 2 |
0 |
03/12/1999 |
REFUELING OUTAGE - DEFUELED |
* |
|
FITZPATRICK 1 |
100 |
|
|
|
|
GINNA 1 |
0 |
03/01/1999 |
REFUELING OUTAGE - FUEL RELOAD IN PROGRESS |
* |
|
HOPE CREEK 1 |
56 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM MAINTENANCE ON A MOISTURE SEPARATOR R |
* |
|
INDIAN POINT 2 |
99 |
|
MAXIMUM OPERATING POWER |
|
|
INDIAN POINT 3 |
100 |
|
|
|
|
LIMERICK 1 |
100 |
|
|
|
|
LIMERICK 2 |
85 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
MILLSTONE 2 |
0 |
02/20/1996 |
REFUELING OUTAGE - UNIT AT NORMAL OPERATING TEMPERATURE AND PRESSURE - WAITI |
|
|
MILLSTONE 3 |
100 |
|
|
|
|
NINE MILE POINT 1 |
100 |
|
|
|
|
NINE MILE POINT 2 |
100 |
|
|
|
|
OYSTER CREEK 1 |
100 |
|
|
|
|
PEACH BOTTOM 2 |
100 |
|
|
|
|
PEACH BOTTOM 3 |
100 |
|
|
|
|
PILGRIM 1 |
85 |
|
HOLDING POWER AT THIS LEVEL DUE TO AN INOPERABLE MAIN STEAM ISOLATION VALVE |
* |
|
SALEM 1 |
100 |
|
|
|
|
SALEM 2 |
0 |
04/03/1999 |
ENTERING REFUELING OUTAGE |
|
|
SEABROOK 1 |
0 |
03/27/1999 |
ENTERING REFUELING OUTAGE - PLAN TO ENTER MODE 6 (REFUELING) LATER TODAY |
* |
|
SUSQUEHANNA 1 |
94 |
|
INCREASING POWER AFTER DECREASING TO 75% FOR PERFORMANCE OF A ROD PATTERN AD |
* |
|
SUSQUEHANNA 2 |
0 |
03/12/1999 |
REFUELING OUTAGE - FUEL PARTIALLY OFFLOADED - PLAN TO COMMENCE FUEL SHUFFLE |
* |
|
THREE MILE ISLAND 1 |
100 |
|
|
|
|
VERMONT YANKEE 1 |
100 |
|
|
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BROWNS FERRY 1 |
0 |
03/03/1985 |
DEFUELED |
|
|
BROWNS FERRY 2 |
86 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
BROWNS FERRY 3 |
100 |
|
|
|
|
BRUNSWICK 1 |
100 |
|
|
|
|
BRUNSWICK 2 |
96 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
CATAWBA 1 |
100 |
|
|
|
|
CATAWBA 2 |
100 |
|
|
|
|
CRYSTAL RIVER 3 |
60 |
|
HOLDING POWER AT THIS LEVEL FOLLOWING A CONDENSATE PUMP TRIP - TROUBLESHOOTI |
* |
|
FARLEY 1 |
100 |
|
|
|
|
FARLEY 2 |
50 |
|
OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD |
|
|
HARRIS 1 |
100 |
|
|
|
|
HATCH 1 |
0 |
03/01/1999 |
REFUELING OUTAGE - FUEL SHUFFLE COMPLETE |
|
|
HATCH 2 |
98 |
|
MAXIMUM OPERATING POWER |
|
|
MCGUIRE 1 |
100 |
|
|
|
|
MCGUIRE 2 |
0 |
03/12/1999 |
REFUELING OUTAGE - FUEL RELOAD COMPLETE |
|
|
NORTH ANNA 1 |
100 |
|
|
|
|
NORTH ANNA 2 |
100 |
|
|
|
|
OCONEE 1 |
100 |
|
|
|
|
OCONEE 2 |
100 |
|
|
|
|
OCONEE 3 |
100 |
|
|
|
|
ROBINSON 2 |
100 |
|
|
|
|
SAINT LUCIE 1 |
100 |
|
|
|
|
SAINT LUCIE 2 |
100 |
|
|
|
|
SEQUOYAH 1 |
100 |
|
|
|
|
SEQUOYAH 2 |
69 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
SUMMER 1 |
0 |
04/03/1999 |
ENTERING REFUELING OUTAGE |
* |
|
SURRY 1 |
100 |
|
|
|
|
SURRY 2 |
74 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
TURKEY POINT 3 |
100 |
|
|
|
|
TURKEY POINT 4 |
0 |
03/15/1999 |
REFUELING OUTAGE |
|
|
VOGTLE 1 |
100 |
|
|
|
|
VOGTLE 2 |
100 |
|
|
|
|
WATTS BAR 1 |
0 |
02/27/1999 |
REFUELING OUTAGE |
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
95 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
BYRON 1 |
0 |
03/27/1999 |
REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS |
* |
|
BYRON 2 |
74 |
|
HOLDING POWER AT THIS LEVEL TO REPAIR A LOW PRESSURE HEATER LEAK (ONE STRING |
* |
|
CLINTON 1 |
0 |
09/06/1996 |
REFUELING OUTAGE |
|
|
COOK 1 |
0 |
09/08/1997 |
MAINTENANCE OUTAGE |
|
|
COOK 2 |
0 |
09/09/1997 |
REFUELING OUTAGE |
|
|
DAVIS BESSE 1 |
100 |
|
|
|
|
DRESDEN 2 |
99 |
|
POWER LIMITED BY TURBINE CONTROL VALVES |
* |
|
DRESDEN 3 |
100 |
|
|
|
|
DUANE ARNOLD 1 |
100 |
|
|
|
|
FERMI 2 |
97 |
|
POWER LIMITED DUE TO POWER UPRATE ISSUES |
|
|
KEWAUNEE 1 |
98 |
|
POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING |
|
|
LASALLE 1 |
65 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM TESTING TO IDENTIFY A FUEL LEAK |
|
|
LASALLE 2 |
0 |
09/20/1996 |
REFUELING OUTAGE |
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
100 |
|
|
|
|
PERRY 1 |
0 |
03/26/1999 |
REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS |
* |
|
POINT BEACH 1 |
100 |
|
|
|
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
99 |
|
MAXIMUM OPERATING POWER DUE TO JET PUMP RISER BRACE LIMITATIONS |
* |
|
QUAD CITIES 2 |
100 |
|
|
|
|