Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BROWNS FERRY 1 |
0 |
03/03/1985 |
DEFUELED |
|
|
BROWNS FERRY 2 |
93 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
BROWNS FERRY 3 |
100 |
|
|
|
|
BRUNSWICK 1 |
100 |
|
|
|
|
BRUNSWICK 2 |
100 |
|
|
* |
|
CATAWBA 1 |
100 |
|
|
|
|
CATAWBA 2 |
100 |
|
|
|
|
CRYSTAL RIVER 3 |
100 |
|
|
|
|
FARLEY 1 |
100 |
|
|
|
|
FARLEY 2 |
100 |
|
|
|
|
HARRIS 1 |
0 |
03/12/1999 |
MAINTENANCE OUTAGE DUE TO AN AUTOMATIC REACTOR TRIP/TURBINE TRIP FROM 100% P |
* |
|
HATCH 1 |
0 |
03/01/1999 |
REFUELING OUTAGE - INSPECTING FUEL PRIOR TO PERFORMANCE OF A FUEL SHUFFLE |
|
|
HATCH 2 |
98 |
|
MAXIMUM OPERATING POWER |
|
|
MCGUIRE 1 |
100 |
|
|
|
|
MCGUIRE 2 |
0 |
03/12/1999 |
ENTERING REFUELING OUTAGE |
|
|
NORTH ANNA 1 |
98 |
|
HOLDING POWER AT THIS LEVEL TO CONVERT FROM A STEAM FLOW CALORIMETRIC TO A F |
* |
|
NORTH ANNA 2 |
100 |
|
|
|
|
OCONEE 1 |
100 |
|
|
|
|
OCONEE 2 |
100 |
|
|
|
|
OCONEE 3 |
100 |
|
|
|
|
ROBINSON 2 |
99 |
|
INCREASING POWER FOLLOWING A LOAD REDUCTION TO 98% POWER FOR THE PERFORMANCE |
* |
|
SAINT LUCIE 1 |
100 |
|
|
|
|
SAINT LUCIE 2 |
100 |
|
|
|
|
SEQUOYAH 1 |
100 |
|
|
|
|
SEQUOYAH 2 |
81 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
SUMMER 1 |
100 |
|
|
|
|
SURRY 1 |
100 |
|
|
|
|
SURRY 2 |
87 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
TURKEY POINT 3 |
100 |
|
|
|
|
TURKEY POINT 4 |
0 |
03/15/1999 |
ENTERING REFUELING OUTAGE |
* |
|
VOGTLE 1 |
0 |
02/27/1999 |
REFUELING OUTAGE - FUEL RELOAD COMPLETE |
* |
|
VOGTLE 2 |
100 |
|
|
|
|
WATTS BAR 1 |
0 |
02/27/1999 |
REFUELING OUTAGE - DEFUELED |
|
|