Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BROWNS FERRY 1 |
0 |
03/03/1985 |
DDEFUELED |
|
|
BROWNS FERRY 2 |
90 |
|
WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE |
|
|
BROWNS FERRY 3 |
100 |
|
|
|
|
BRUNSWICK 1 |
27 |
|
ING POWER FOLLOWING REFUELING OUTAGE *INCREASING POWER FOLLOWING REFUELING OUTAGE |
|
|
BRUNSWICK 2 |
100 |
|
|
|
|
CATAWBA 1 |
100 |
|
|
|
|
CATAWBA 2 |
100 |
|
|
|
|
CRYSTAL RIVER 3 |
100 |
|
|
|
|
FARLEY 1 |
100 |
|
|
|
|
FARLEY 2 |
0 |
09/13/2002 |
NG OUTAGE - DEFUELEDREFUELING OUTAGE - DEFUELED |
|
|
HARRIS 1 |
100 |
|
|
|
|
HATCH 1 |
95 |
|
ING POWER *INCREASING POWER |
|
|
HATCH 2 |
100 |
|
|
|
|
MCGUIRE 1 |
0 |
09/13/2002 |
NG OUTAGEREFUELING OUTAGE |
|
|
MCGUIRE 2 |
100 |
|
|
|
|
NORTH ANNA 1 |
100 |
|
ARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.4 FT.UE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.4 FT. |
|
|
NORTH ANNA 2 |
0 |
09/07/2002 |
ARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.4 FT REFUELING OUTAGE - DEFUELEDUE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.4 FT REFUELING OUTAGE - DEFUELED |
|
|
OCONEE 1 |
100 |
|
|
|
|
OCONEE 2 |
99 |
|
WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE |
|
|
OCONEE 3 |
100 |
|
|
|
|
ROBINSON 2 |
100 |
|
|
|
|
SAINT LUCIE 1 |
45 |
|
POWER AT 45% FOR PRE-OUTAGE WORK *HOLDING POWER AT 45% FOR PRE-OUTAGE WORK |
|
|
SAINT LUCIE 2 |
100 |
|
|
|
|
SEQUOYAH 1 |
100 |
|
|
|
|
SEQUOYAH 2 |
100 |
|
|
|
|
SUMMER 1 |
100 |
|
|
|
|
SURRY 1 |
100 |
|
|
|
|
SURRY 2 |
100 |
|
|
|
|
TURKEY POINT 3 |
100 |
|
|
|
|
TURKEY POINT 4 |
100 |
|
|
|
|
VOGTLE 1 |
100 |
|
|
|
|
VOGTLE 2 |
96 |
|
WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE |
|
|
WATTS BAR 1 |
100 |
|
|
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
100 |
|
|
|
|
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
0 |
09/16/2002 |
NG OUTAGEREFUELING OUTAGE |
|
|
CLINTON 1 |
93 |
|
ECTRICAL CAPABILITY100% ELECTRICAL CAPABILITY |
|
|
COOK 1 |
100 |
|
|
|
|
COOK 2 |
100 |
|
|
|
|
DAVIS BESSE 1 |
0 |
02/15/2002 |
NG OUTAGE - DEFUELEDREFUELING OUTAGE - DEFUELED |
|
|
DRESDEN 2 |
95 |
|
ECTRICAL CAPABILITY *100% ELECTRICAL CAPABILITY |
|
|
DRESDEN 3 |
88 |
|
WN TO REFUELING OUTAGE *COASTDOWN TO REFUELING OUTAGE |
|
|
DUANE ARNOLD 1 |
94 |
|
ECTRICAL CAPABILITY100% ELECTRICAL CAPABILITY |
|
|
FERMI 2 |
69 |
|
POWER FOR TESTING *REDUCED POWER FOR TESTING |
|
|
KEWAUNEE 1 |
100 |
|
|
|
|
LASALLE 1 |
98 |
|
EDUCTION FOR ROD PATTERN ADJUSTMENTSPOWER REDUCTION FOR ROD PATTERN ADJUSTMENTS |
|
|
LASALLE 2 |
68 |
|
EDUCTION FOR ROD PATTERN ADJUSTMENTS *POWER REDUCTION FOR ROD PATTERN ADJUSTMENTS |
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
85 |
|
ING POWER FOLLOWING MAINTENANCE *INCREASING POWER FOLLOWING MAINTENANCE |
|
|
PERRY 1 |
0 |
09/21/2002 |
OUTAGEFORCED OUTAGE |
|
|
POINT BEACH 1 |
0 |
09/13/2002 |
NG OUTAGEREFUELING OUTAGE |
|
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
100 |
|
|
|
|
QUAD CITIES 2 |
100 |
|
|
|
|