Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
85 |
|
Power Operation LOAD FOLLOW |
* |
|
BYRON 1 |
83 |
|
Power Operation LOAD FOLLOW |
* |
|
BYRON 2 |
0 |
09/16/2002 |
Refueling REFUELING OUTAGE - REFUELING |
* |
|
CLINTON 1 |
95 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
* |
|
COOK 1 |
100 |
|
|
|
|
COOK 2 |
100 |
|
|
|
|
DAVIS BESSE 1 |
0 |
02/15/2002 |
Refueling REFUELING OUTAGE - DEFUELED |
|
|
DRESDEN 2 |
98 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
DRESDEN 3 |
93 |
|
Power Operation COASTDOWN TO REFUELING OUTAGE |
* |
|
DUANE ARNOLD 1 |
94 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|
FERMI 2 |
92 |
|
Power Operation REDUCED POWER FOR MAINTENANCE |
* |
|
KEWAUNEE 1 |
100 |
|
|
|
|
LASALLE 1 |
97 |
|
|
* |
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
100 |
|
|
|
|
PERRY 1 |
0 |
09/21/2002 |
Hot Shutdown REACTOR SCRAM ON TURBINE TRIP DURING TURBINE SURVEILLANCE TEST - SEE EVENT#39207, MAKING PREPARATIONS FOR SHUTDOWN COOLING |
* |
|
POINT BEACH 1 |
0 |
09/13/2002 |
Refueling REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS |
|
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
100 |
|
|
* |
|
QUAD CITIES 2 |
97 |
|
Power Operation 100% ELECTRICAL CAPABILITY |
|
|