Home
> Electronic Reading Room
> Document Collections
> Reports Associated with Events
> Power Reactor Status Reports
> 2002
> September 7
Power Reactor Status Report for September 7, 2002
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BEAVER VALLEY 1 |
100.00000 |
|
|
|
|
BEAVER VALLEY 2 |
100.00000 |
|
|
|
|
CALVERT CLIFFS 1 |
100.00000 |
|
|
|
|
CALVERT CLIFFS 2 |
90.00000 |
|
G WATERBOXESCLEANING WATERBOXES |
* |
|
FITZPATRICK 1 |
100.00000 |
|
|
|
|
GINNA 1 |
100.00000 |
|
|
|
|
HOPE CREEK 1 |
100.00000 |
|
|
|
|
INDIAN POINT 2 |
100.00000 |
|
|
|
|
INDIAN POINT 3 |
100.00000 |
|
|
|
|
LIMERICK 1 |
100.00000 |
|
|
|
|
LIMERICK 2 |
100.00000 |
|
|
|
|
MILLSTONE 2 |
100.00000 |
|
|
|
|
MILLSTONE 3 |
0.00000 |
09/06/2002 |
NG OUTAGEREFUELING OUTAGE |
* |
|
NINE MILE POINT 1 |
100.00000 |
|
|
|
|
NINE MILE POINT 2 |
100.00000 |
|
|
|
|
OYSTER CREEK 1 |
100.00000 |
|
|
|
|
PEACH BOTTOM 2 |
87.00000 |
|
WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE |
|
|
PEACH BOTTOM 3 |
65.00000 |
|
ING SCRAM TIME TESTINGPERFORMING SCRAM TIME TESTING |
* |
|
PILGRIM 1 |
100.00000 |
|
|
|
|
SALEM 1 |
100.00000 |
|
|
|
|
SALEM 2 |
100.00000 |
|
|
|
|
SEABROOK 1 |
100.00000 |
|
|
|
|
SUSQUEHANNA 1 |
100.00000 |
|
|
|
|
SUSQUEHANNA 2 |
100.00000 |
|
|
|
|
THREE MILE ISLAND 1 |
100.00000 |
|
|
|
|
VERMONT YANKEE 1 |
100.00000 |
|
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BROWNS FERRY 1 |
0.00000 |
03/03/1985 |
DDEFUELED |
|
|
BROWNS FERRY 2 |
63.00000 |
|
UPPRESSION TESTINGPOWER SUPPRESSION TESTING |
* |
|
BROWNS FERRY 3 |
100.00000 |
|
|
|
|
BRUNSWICK 1 |
94.00000 |
|
ECTRICAL CAPABILITY100% ELECTRICAL CAPABILITY |
|
|
BRUNSWICK 2 |
100.00000 |
|
|
|
|
CATAWBA 1 |
100.00000 |
|
|
|
|
CATAWBA 2 |
100.00000 |
|
|
|
|
CRYSTAL RIVER 3 |
100.00000 |
|
|
|
|
FARLEY 1 |
100.00000 |
|
|
|
|
FARLEY 2 |
98.00000 |
|
WN FOR REFUELING OUTAGECOASTDOWN FOR REFUELING OUTAGE |
* |
|
HARRIS 1 |
100.00000 |
|
|
|
|
HATCH 1 |
100.00000 |
|
|
|
|
HATCH 2 |
69.00000 |
|
UENCE EXCHANGEROD SEQUENCE EXCHANGE |
* |
|
MCGUIRE 1 |
99.00000 |
|
|
|
|
MCGUIRE 2 |
100.00000 |
|
|
|
|
NORTH ANNA 1 |
100.00000 |
|
ARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.7 FT.UE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.7 FT. |
* |
|
NORTH ANNA 2 |
100.00000 |
|
ARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.7 FTUE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.7 FT |
* |
|
OCONEE 1 |
100.00000 |
|
|
|
|
OCONEE 2 |
100.00000 |
|
|
|
|
OCONEE 3 |
100.00000 |
|
|
|
|
ROBINSON 2 |
100.00000 |
|
|
|
|
SAINT LUCIE 1 |
100.00000 |
|
|
|
|
SAINT LUCIE 2 |
100.00000 |
|
|
|
|
SEQUOYAH 1 |
100.00000 |
|
|
|
|
SEQUOYAH 2 |
100.00000 |
|
|
|
|
SUMMER 1 |
100.00000 |
|
|
|
|
SURRY 1 |
74.00000 |
|
G POWER TO PERFORM FEED PUMP MAINTENANCEREDUCING POWER TO PERFORM FEED PUMP MAINTENANCE |
* |
|
SURRY 2 |
100.00000 |
|
|
|
|
TURKEY POINT 3 |
100.00000 |
|
|
|
|
TURKEY POINT 4 |
100.00000 |
|
|
|
|
VOGTLE 1 |
100.00000 |
|
|
|
|
VOGTLE 2 |
100.00000 |
|
|
|
|
WATTS BAR 1 |
100.00000 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100.00000 |
|
|
|
|
BRAIDWOOD 2 |
100.00000 |
|
|
|
|
BYRON 1 |
100.00000 |
|
|
|
|
BYRON 2 |
99.00000 |
|
WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE |
* |
|
CLINTON 1 |
94.00000 |
|
ECTRICAL CAPABILITY100% ELECTRICAL CAPABILITY |
|
|
COOK 1 |
100.00000 |
|
|
|
|
COOK 2 |
100.00000 |
|
|
|
|
DAVIS BESSE 1 |
0.00000 |
02/15/2002 |
NG OUTAGE - DEFUELEDREFUELING OUTAGE - DEFUELED |
|
|
DRESDEN 2 |
98.00000 |
|
ECTRICAL CAPABILITY100% ELECTRICAL CAPABILITY |
|
|
DRESDEN 3 |
90.00000 |
|
WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE |
* |
|
DUANE ARNOLD 1 |
0.00000 |
09/02/2002 |
HUTDOWN FOR MAINTENANCE. SEE EVENT # 39164.PLANT SHUTDOWN FOR MAINTENANCE. SEE EVENT # 39164. |
|
|
FERMI 2 |
100.00000 |
|
|
|
|
KEWAUNEE 1 |
100.00000 |
|
|
|
|
LASALLE 1 |
100.00000 |
|
|
|
|
LASALLE 2 |
60.00000 |
|
UPPRESSION TESTINGPOWER SUPPRESSION TESTING |
* |
|
MONTICELLO 1 |
100.00000 |
|
|
|
|
PALISADES 1 |
100.00000 |
|
|
|
|
PERRY 1 |
100.00000 |
|
|
|
|
POINT BEACH 1 |
100.00000 |
|
|
|
|
POINT BEACH 2 |
100.00000 |
|
|
|
|
PRAIRIE ISLAND 1 |
100.00000 |
|
|
|
|
PRAIRIE ISLAND 2 |
100.00000 |
|
|
|
|
QUAD CITIES 1 |
95.00000 |
|
WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE |
* |
|
QUAD CITIES 2 |
98.00000 |
|
ECTRICAL CAPABILITY100% ELECTRICAL CAPABILITY |
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
ARKANSAS NUCLEAR 1 |
99.00000 |
|
|
* |
|
ARKANSAS NUCLEAR 2 |
100.00000 |
|
|
|
|
CALLAWAY 1 |
100.00000 |
|
|
|
|
COLUMBIA GENERATING |
100.00000 |
|
|
|
|
COMANCHE PEAK 1 |
100.00000 |
|
|
|
|
COMANCHE PEAK 2 |
99.00000 |
|
ECTRICAL CAPABILITY100% ELECTRICAL CAPABILITY |
|
|
COOPER 1 |
100.00000 |
|
|
|
|
DIABLO CANYON 1 |
98.00000 |
|
due to high turbine vibrationLimited due to high turbine vibration |
|
|
DIABLO CANYON 2 |
100.00000 |
|
|
|
|
FT CALHOUN 1 |
100.00000 |
|
|
* |
|
GRAND GULF 1 |
87.00000 |
|
WN TO REFUELING OUTAGECOASTDOWN TO REFUELING OUTAGE |
|
|
PALO VERDE 1 |
99.00000 |
|
|
|
|
PALO VERDE 2 |
98.00000 |
|
|
|
|
PALO VERDE 3 |
99.00000 |
|
|
|
|
RIVER BEND 1 |
100.00000 |
|
|
|
|
SAN ONOFRE 2 |
100.00000 |
|
|
|
|
SAN ONOFRE 3 |
100.00000 |
|
|
|
|
SOUTH TEXAS 1 |
100.00000 |
|
|
|
|
SOUTH TEXAS 2 |
100.00000 |
|
|
|
|
WATERFORD 3 |
100.00000 |
|
|
* |
|
WOLF CREEK 1 |
100.00000 |
|
|
|
|
![To top of page](https://webarchive.library.unt.edu/eot2008/20081015195017im_/http://www.nrc.gov/images/navigation/go-top.gif)
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|