Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
100 |
|
|
|
|
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
100 |
|
MEASURED '2C' STEAM GENERATOR TUBE LEAKAGE = 1.37 GPD |
* |
|
CLINTON 1 |
93 |
|
100% ELECTRICAL CAPABILITY |
|
|
COOK 1 |
69 |
|
ALERT DECLARED AND TERMINATED ON 06/12/02 DUE TO A FIRE IN THE SWITCHYARD (Refer to event #38983) - HOLDING POWER AT THIS LEVEL TO PERFORM A SWITCHYARD EVALUATION |
* |
|
COOK 2 |
100 |
|
ALERT DECLARED AND TERMINATED ON 06/12/02 DUE TO A FIRE IN THE SWITCHYARD (Refer to event #38983) |
* |
|
DAVIS BESSE 1 |
0 |
02/15/2002 |
REFUELING OUTAGE - REFUELED |
|
|
DRESDEN 2 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
DRESDEN 3 |
100 |
|
|
|
|
DUANE ARNOLD 1 |
94 |
|
100% ELECTRICAL CAPABILITY |
|
|
FERMI 2 |
100 |
|
|
|
|
KEWAUNEE 1 |
100 |
|
|
|
|
LASALLE 1 |
100 |
|
|
|
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
51 |
|
HOLDING POWER AT THIS LEVEL DUE TO A COOLING TOWER PUMP TRIP |
|
|
PERRY 1 |
20 |
|
PREPARING TO PLACE THE UNIT ON LINE TO EXIT A MAINTENANCE OUTAGE |
* |
|
POINT BEACH 1 |
100 |
|
|
|
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
100 |
|
|
|
|
QUAD CITIES 2 |
98 |
|
100% ELECTRICAL CAPABILITY |
* |
|