Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
50 |
|
INCREASING POWER AFTER EXITING A REFUELING OUTAGE |
* |
|
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
100 |
|
MEASURED STEAM GENERATOR TUBE LEAKAGE = 25 GPD |
* |
|
CLINTON 1 |
0 |
05/13/2002 |
AUTOMATIC REACTOR SCRAM FROM 86% POWER ON HIGH WATER LEVEL DUE TO THE FAILURE OF THE STARTUP LEVEL CONTROLLER DURING EXTENDED POWER UPRATE TESTING ON FEEDWATER LEVEL CONTROL (Refer to event #38916) |
* |
1 |
COOK 1 |
0 |
05/04/2002 |
REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS |
|
|
COOK 2 |
0 |
05/12/2002 |
AUTOMATIC REACTOR TRIP FROM 100% POWER DUE TO AN INSTRUMENTATION RACK POWER SUPPLY FAILURE WHICH CAUSED A STEAM GENERATOR FEEDWATER REGULATING VALVE TO FAIL CLOSED (Refer to event #38915) |
* |
1 |
DAVIS BESSE 1 |
0 |
02/15/2002 |
REFUELING OUTAGE - FUEL SHUFFLE COMPLETE |
|
|
DRESDEN 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
* |
|
DRESDEN 3 |
100 |
|
|
|
|
DUANE ARNOLD 1 |
94 |
|
100% ELECTRICAL CAPABILITY |
|
|
FERMI 2 |
100 |
|
|
|
|
KEWAUNEE 1 |
0 |
05/05/2002 |
MAINTENANCE OUTAGE |
|
|
LASALLE 1 |
100 |
|
|
|
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
100 |
|
|
|
|
PERRY 1 |
100 |
|
|
|
|
POINT BEACH 1 |
100 |
|
|
|
|
POINT BEACH 2 |
0 |
04/12/2002 |
REFUELING OUTAGE - STARTUP IN PROGRESS |
* |
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
100 |
|
|
* |
|
QUAD CITIES 2 |
96 |
|
100% ELECTRICAL POWER |
|
|