skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Power Reactor Status Report for April 19, 2002

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

To top of page
Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 0 02/15/2002 REFUELING OUTAGE - DEFUELED    
CALVERT CLIFFS 2 100        
FITZPATRICK 1 94   INCREASING POWER *  
GINNA 1 7   MAKING PREPARATIONS TO PLACE GENERATOR ONLINE *  
HOPE CREEK 1 100        
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 99   INCREASING POWER *  
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 89   INCREASING POWER *  
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 92   INCREASING POWER *  
SALEM 2 0 04/04/2002 REFUELING OUTAGE - DEFUELED    
SEABROOK 1 100        
SUSQUEHANNA 1 0 03/02/2002 REFUELING OUTAGE    
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 91   HOLDING POWER DUE TO FUEL PROBLEMS    

Region 2

To top of page
Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100     *  
BRUNSWICK 2 100        
CATAWBA 1 96   COASTDOWN TO REFUELING OUTAGE *  
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 13   HOLDING POWER - GENERATOR OFFLINE *  
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 0 03/23/2002 REFUELING OUTAGE    
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 0 04/14/2002 REFUELING OUTAGE    
SUMMER 1 85   HOLDING POWER *  
SURRY 1 100        
SURRY 2 0 03/24/2002 MAINTENANCE OUTAGE    
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 1   HOLDING POWER - SECONDARY PLANT STARTUP IN PROGRESS *  
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

To top of page
Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 93   100% ELECTRICAL CAPABILITY - COASTDOWN TO REFUELING OUTAGE    
BYRON 1 100        
BYRON 2 100   MEASURED STEAM GENERATOR TUBE LEAKAGE 2.89 GPD *  
CLINTON 1 0 04/01/2002 REFUELING OUTAGE    
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 0 02/15/2002 REFUELING OUTAGE    
DRESDEN 2 97   100% ELECTRICAL CAPABILITY    
DRESDEN 3 100        
DUANE ARNOLD 1 94   100% ELECTRICAL CAPABILITY    
FERMI 2 100        
KEWAUNEE 1 100        
LASALLE 1 100        
LASALLE 2 0 04/08/2002 PLANNED MAINTENANCE OUTAGE    
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 0 04/12/2002 REFUELING OUTAGE *  
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 97   100% ELECTRICAL CAPABILITY    

Region 4

To top of page
Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 0 04/12/2002 REFUELING OUTAGE    
CALLAWAY 1 100        
COLUMBIA GENERATING 65   LOAD FOLLOWING    
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 0 03/30/2002 REFUELING OUTAGE *  
COOPER 1 85   REDUCED POWER DUE TO RWCU OUT OF SERVICE *  
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 98        
GRAND GULF 1 100        
PALO VERDE 1 98   REDUCED POWER FOR SG HI RATE BLOWDOWNS *  
PALO VERDE 2 60   INCREASING POWER *  
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 68   HOLDING POWER FOR PHYSICS TESTING *  
WOLF CREEK 1 0 03/23/2002 REFUELING OUTAGE *  

To top of page

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.