Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BEAVER VALLEY 1 |
100 |
|
|
|
|
BEAVER VALLEY 2 |
100 |
|
|
|
|
CALVERT CLIFFS 1 |
0 |
02/15/2002 |
REFUELING OUTAGE - DEFUELED |
|
|
CALVERT CLIFFS 2 |
100 |
|
|
|
|
FITZPATRICK 1 |
100 |
|
|
|
|
GINNA 1 |
0 |
03/18/2002 |
REFUELING OUTAGE - PREPARING TO OFFLOAD FUEL |
* |
|
HOPE CREEK 1 |
80 |
|
INCREASING POWER AFTER DECREASING TO 75% POWER TO PERFORM ROD PATTERN ADJUSTMENTS |
* |
|
INDIAN POINT 2 |
100 |
|
|
* |
|
INDIAN POINT 3 |
100 |
|
|
|
|
LIMERICK 1 |
30 |
|
HOLDING POWER AT THIS LEVEL DUE TO A CONDENSATE PUMP PROBLEM AFTER EXITING A REFUELING OUTAGE |
* |
|
LIMERICK 2 |
80 |
|
INCREASING POWER AFTER HOLDING AT 80% POWER TO PERFORM WATERBOX CLEANING |
* |
|
MILLSTONE 2 |
0 |
02/15/2002 |
REFUELING OUTAGE |
|
|
MILLSTONE 3 |
100 |
|
|
|
|
NINE MILE POINT 1 |
100 |
|
|
|
|
NINE MILE POINT 2 |
0 |
03/15/2002 |
REFUELING OUTAGE - FIRST PHASE OF FUEL SHUFFLE COMPLETE - REMOVING CONTROL ROD DRIVES |
|
|
OYSTER CREEK 1 |
100 |
|
|
|
|
PEACH BOTTOM 2 |
100 |
|
|
* |
|
PEACH BOTTOM 3 |
82 |
|
HOLDING POWER AT THIS LEVEL DUE TO A CONDENSATE PUMP PROBLEM |
|
|
PILGRIM 1 |
100 |
|
|
|
|
SALEM 1 |
100 |
|
|
|
|
SALEM 2 |
100 |
|
|
|
|
SEABROOK 1 |
100 |
|
|
|
|
SUSQUEHANNA 1 |
0 |
03/02/2002 |
REFUELING OUTAGE - REFUELED |
|
|
SUSQUEHANNA 2 |
100 |
|
|
|
|
THREE MILE ISLAND 1 |
100 |
|
|
|
|
VERMONT YANKEE 1 |
91 |
|
HOLDING POWER AT THIS LEVEL DUE TO FUEL PIN LEAKS |
* |
|
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
BYRON 1 |
0 |
03/11/2002 |
REFUELING OUTAGE - REACTOR VESSEL HEAD TENSIONING IN PROGRESS |
* |
|
BYRON 2 |
100 |
|
MEASURED STEAM GENERATOR TUBE LEAKAGE LESS THAN 5 GPD |
* |
|
CLINTON 1 |
99 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
COOK 1 |
100 |
|
|
|
|
COOK 2 |
90 |
|
HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT A TURBINE CONTROL SYSTEM PROBLEM |
* |
|
DAVIS BESSE 1 |
0 |
02/15/2002 |
REFUELING OUTAGE - REFUELED |
|
|
DRESDEN 2 |
95 |
|
100% ELECTRICAL CAPABILITY |
|
|
DRESDEN 3 |
22 |
|
MAINTENANCE OUTAGE - STARTUP IN PROGRESS - PREPARING TO PLACE THE UNIT ON LINE |
* |
|
DUANE ARNOLD 1 |
94 |
|
100% ELECTRICAL CAPABILITY |
|
|
FERMI 2 |
100 |
|
|
|
|
KEWAUNEE 1 |
100 |
|
|
|
|
LASALLE 1 |
100 |
|
|
|
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
100 |
|
|
|
|
PERRY 1 |
100 |
|
|
|
|
POINT BEACH 1 |
68 |
|
INCREASING POWER AFTER DECREASING TO 33% POWER TO PERFORM REACTOR COOLANT SYSTEM PRESSURE TRANSMITTER WORK, MAIN FEEDWATER PUMP WORK, AND TURBINE CONTROL VALVE TESTING |
* |
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
100 |
|
|
|
|
QUAD CITIES 2 |
95 |
|
100% ELECTRICAL CAPABILITY |
|
|