Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
0 |
04/14/2008 |
REFUELING OUTAGE |
|
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
98 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Hope Creek 1 |
100 |
|
500 KV LINE #5021 OOS |
|
|
Indian Point 2 |
8 |
|
HOLDING POWER TO RESOLVE RELAY ISSUE - GENERATOR OFFLINE |
* |
|
Indian Point 3 |
100 |
|
|
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
0 |
04/05/2008 |
DEFUELED |
|
|
Millstone 3 |
100 |
|
|
|
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
81 |
|
STARTUP TESTING IN PROGRESS |
* |
|
Oyster Creek |
92 |
|
HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES |
|
|
Peach Bottom 2 |
100 |
|
|
|
|
Peach Bottom 3 |
100 |
|
|
|
|
Pilgrim 1 |
100 |
|
|
|
|
Salem 1 |
100 |
|
500 KV LINE OOS FOR MAINTENANCE |
|
|
Salem 2 |
0 |
03/11/2008 |
DEFUELED - 500 KV LINE OOS FOR MAINTENANCE |
|
|
Seabrook 1 |
0 |
03/31/2008 |
345 KV (BUS 2) OOS - EXPECT RETURN TO SERVICE ON 4/20 |
* |
|
Susquehanna 1 |
72 |
|
HOLDING POWER FOR TESTING |
* |
|
Susquehanna 2 |
100 |
|
VOLTAGE REGULATOR IN MANUAL |
|
|
Three Mile Island 1 |
100 |
|
MINIMUM GENERATION ALERT FROM PJM - NO IMPACT ON PLANT |
* |
|
Vermont Yankee |
100 |
|
|
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
92 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Byron 1 |
95 |
|
HOLDING POWER FOR PRECONDITIONING |
* |
|
Byron 2 |
100 |
|
|
|
|
Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
0 |
03/25/2008 |
REFUELING OUTAGE |
* |
|
D.C. Cook 2 |
100 |
|
|
* |
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
99 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
98 |
|
TESTING HP CONTROL VALVES |
* |
|
Kewaunee |
0 |
03/28/2008 |
DEFUELED |
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
|
* |
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
GRID VOLTAGE IS EXPECTED TO DIP WHEN KEWAUNEE ENERGIZES NEW TRANSFORMER ON 04/22 |
* |
|
Point Beach 2 |
0 |
04/05/2008 |
DEFUELED - TRANSFORMERS 2X03 & 2X04 OOS - GRID VOLTAGE IS EXPECTED TO DIP WHEN KEWAUNEE ENERGIZES NEW TRANSFORMER ON 04/22 |
* |
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
* |
|