Power Reactor Status Report for April 18, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
0 |
04/14/2008 |
REFUELING OUTAGE |
* |
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Hope Creek 1 |
100 |
|
500 KV LINE #5021 OOS |
|
|
Indian Point 2 |
0 |
03/23/2008 |
REFUELING OUTAGE. |
|
|
Indian Point 3 |
100 |
|
|
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
0 |
04/05/2008 |
DEFUELED |
* |
|
Millstone 3 |
100 |
|
|
|
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
30 |
|
INCREASING POWER |
* |
|
Oyster Creek |
93 |
|
HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES |
* |
|
Peach Bottom 2 |
100 |
|
|
|
|
Peach Bottom 3 |
100 |
|
|
|
|
Pilgrim 1 |
100 |
|
|
|
|
Salem 1 |
100 |
|
500 KV LINE OOS FOR MAINTENANCE |
|
|
Salem 2 |
0 |
03/11/2008 |
DEFUELED - 500 KV LINE OOS FOR MAINTENANCE |
|
|
Seabrook 1 |
0 |
03/31/2008 |
345 KV (BUS 2) OOS |
|
|
Susquehanna 1 |
38 |
|
HOLDING POWER FOR TESTING |
* |
|
Susquehanna 2 |
100 |
|
VOLTAGE REGULATOR IN MANUAL |
|
|
Three Mile Island 1 |
100 |
|
|
|
|
Vermont Yankee |
100 |
|
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
100 |
|
|
|
|
Browns Ferry 2 |
100 |
|
|
|
|
Browns Ferry 3 |
0 |
03/18/2008 |
REFUELING OUTAGE |
|
|
Brunswick 1 |
0 |
03/14/2008 |
REFUELING OUTAGE |
|
|
Brunswick 2 |
100 |
|
|
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Crystal River 3 |
100 |
|
|
|
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
100 |
|
|
* |
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
99 |
|
PROCEDURAL LIMIT |
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
29 |
|
HOLDING POWER FOR TESTING |
* |
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
0 |
04/11/2008 |
REFUELING OUTAGE |
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
92 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Summer |
99 |
|
REDUCED POWER FOR "C" FEED REG VALVE REPAIR |
* |
|
Surry 1 |
0 |
04/16/2008 |
MAINTENANCE OUTAGE - SHUTDOWN TO REPAIR FEEDWATER HEATER |
* |
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
100 |
|
|
|
|
Turkey Point 4 |
0 |
03/30/2008 |
DEFUELED |
|
|
Vogtle 1 |
0 |
03/15/2008 |
REFUELING OUTAGE |
* |
|
Vogtle 2 |
98 |
|
100% ELECTRICAL CAPABILITY. |
|
|
Watts Bar 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
82 |
|
INCREASING POWER |
* |
|
Byron 1 |
87 |
|
INCREASING POWER |
* |
|
Byron 2 |
100 |
|
|
|
|
Clinton |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
0 |
03/25/2008 |
REFUELING OUTAGE |
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
0 |
03/28/2008 |
DEFUELED |
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
100 |
|
|
* |
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
0 |
04/05/2008 |
REFUELING OUTAGE - TRANSFORMERS 2X03 & 2X04 OOS |
|
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Quad Cities 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
|
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
100 |
|
|
* |
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
0 |
03/29/2008 |
REFUELING OUTAGE |
* |
|
Cooper |
0 |
04/11/2008 |
REFUELING OUTAGE |
|
|
Diablo Canyon 1 |
100 |
|
|
|
|
Diablo Canyon 2 |
100 |
|
|
|
|
Fort Calhoun |
100 |
|
|
* |
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
100 |
|
|
|
|
Palo Verde 2 |
0 |
03/28/2008 |
DEFUELED |
|
|
Palo Verde 3 |
100 |
|
|
|
|
River Bend 1 |
100 |
|
|
|
|
San Onofre 2 |
99 |
|
|
|
|
San Onofre 3 |
0 |
04/16/2008 |
PLANNED SHUTDOWN IN ORDER TO CONSERVE FUEL FOR SUMMER LOADS - WILL MAINTAIN UNIT IN MODE 3 (HOT STANDBY) |
|
|
South Texas 1 |
0 |
03/29/2008 |
REFUELING OUTAGE |
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
0 |
03/17/2008 |
REFUELING OUTAGE |
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|