Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
99 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Byron 1 |
0 |
03/23/2008 |
REFUELING OUTAGE - WILL OPEN SWITCHYARD RINGBUS IN PREP OF UNIT 1 STARTUP |
* |
|
Byron 2 |
100 |
|
WILL OPEN SWITCHYARD RINGBUS IN PREP OF UNIT 1 STARTUP |
* |
|
Clinton |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
0 |
03/25/2008 |
DEFUELED |
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
98 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Dresden 3 |
80 |
|
INCREASING POWER - COMPLETED REPAIRS ON #3 TURBINE CONTROL VALVE |
* |
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
0 |
03/28/2008 |
DEFUELED |
* |
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
5 |
|
STARUP IN PROGRESS - CURRENTLY RAISING PRESSURE IN PREPARATION OF TURBINE STARTUP |
* |
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
0 |
04/05/2008 |
REFUELING OUTAGE - TRANSFORMERS 2X03 & 2X04 OOS |
* |
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
33 |
|
REDUCED POWER TO IDENTIFY TUBE LEAK IN MAIN CONDENSER |
* |
|
Quad Cities 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
* |
|