Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
* |
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
1 |
|
REACTOR AT THE POINT OF ADDING HEAT |
* |
|
D.C. Cook 1 |
17 |
|
LOWERING POWER DUE TO TURBINE HIGH VIBRATIONS |
* |
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
18 |
|
HOLDING POWER WHILE BALANCING MG ROTOR |
* |
|
Dresden 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY. |
|
|
Fermi 2 |
85 |
|
HOLDING POWER FOR ROD PATTERN ADJUSTMENT |
* |
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
0 |
02/03/2008 |
REFUELING OUTAGE |
* |
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
30 |
|
INCREASING POWER |
* |
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
89 |
|
COASTDOWN TO REFUELING OUTAGE
BUS 2 OOS FOR MAINTENANCE |
* |
|
Prairie Island 2 |
100 |
|
BUS 2 OOS FOR MAINTENANCE |
* |
|
Quad Cities 1 |
85 |
|
LOWERED POWER FOR ROD PATTERN ADJUSTMENT |
* |
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|