Power Reactor Status Report for October 6, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
0 |
09/23/2007 |
DEFUELED
REFUELING OUTAGE |
|
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
90 |
|
COASTDOWN TO REFUELING OUTAGE. 500 KV INFEED LINE (5023) OOS |
|
|
Indian Point 2 |
100 |
|
|
|
|
Indian Point 3 |
100 |
|
|
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
100 |
|
|
|
|
Millstone 3 |
100 |
|
|
|
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Oyster Creek |
100 |
|
|
|
|
Peach Bottom 2 |
100 |
|
|
|
|
Peach Bottom 3 |
0 |
09/23/2007 |
REFUELING OUTAGE |
|
|
Pilgrim 1 |
100 |
|
|
|
|
Salem 1 |
100 |
|
500 KV HOPE CREEK TIE LINE (5023) OOS TILL 10/9 |
|
|
Salem 2 |
100 |
|
500 KV HOPE CREEK TIE LINE (5023) OOS TILL 10/9 |
|
|
Seabrook 1 |
100 |
|
POWER REDUCTION THREAT DUE TO GRID WORK IN NEW ENGLAND UNTIL JANUARY |
|
|
Susquehanna 1 |
100 |
|
VOLTAGE REGULATOR IN MANUAL |
|
|
Susquehanna 2 |
100 |
|
VOLTAGE REGULATOR IN MANUAL |
|
|
Three Mile Island 1 |
99 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Vermont Yankee |
86 |
|
DOWNPOWER DUE TO LIMITED HOTWELL TEMP TO CONTROL COPPER CONTENT AND RIVER TEMPERATURE INCREASE |
* |
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
100 |
|
|
|
|
Browns Ferry 2 |
100 |
|
|
|
|
Browns Ferry 3 |
100 |
|
|
|
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
100 |
|
|
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
0 |
09/14/2007 |
DEFUELED |
|
|
Crystal River 3 |
100 |
|
|
|
|
Farley 1 |
0 |
09/28/2007 |
REFUELING OUTAGE |
|
|
Farley 2 |
27 |
|
HOLDING POWER FOR NI CAL |
* |
|
Harris 1 |
0 |
09/28/2007 |
REFUELING OUTAGE. |
|
|
Hatch 1 |
100 |
|
|
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
0 |
09/08/2007 |
REFUELING OUTAGE |
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
100 |
|
|
* |
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
0 |
09/30/2007 |
REFUELING OUTAGE |
|
|
Sequoyah 1 |
0 |
10/03/2007 |
REFUELING OUTAGE |
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
0 |
09/02/2007 |
REFUELING OUTAGE |
|
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Vogtle 2 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Watts Bar 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
0 |
10/01/2007 |
REFUELING OUTAGE |
* |
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
* |
|
Byron 2 |
100 |
|
SYSTEM AUX TRANSFORMER (242) OFFLINE FOR PLANNED MAINTENANCE |
* |
|
Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
0 |
09/14/2007 |
DEFUELED |
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
99 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Dresden 3 |
100 |
|
|
|
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
0 |
09/29/2007 |
REFUELING OUTAGE. PLANNED MAINTENANCE ON 345 KV BROWNSTOWN LINES 2 AND 3 STARTING 9/30/07. |
|
|
Kewaunee |
0 |
10/04/2007 |
PLANNED SHUTDOWN TO REPAIR LEAKING HYDROGEN COOLERS IN THE MAIN GENERATOR |
* |
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
0 |
09/09/2007 |
REFUELING OUTAGE |
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
72 |
|
AT 0500 ON 10/6/07 BUS SECTION 3-4 WILL BE REMOVED FROM SERVICE. UNIT 2 WILL DOWNPOWER TO 50% |
* |
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Quad Cities 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
|
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
100 |
|
|
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
100 |
|
|
|
|
Diablo Canyon 1 |
100 |
|
|
|
|
Diablo Canyon 2 |
100 |
|
|
|
|
Fort Calhoun |
100 |
|
|
|
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
100 |
|
|
|
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
0 |
09/29/2007 |
REFUELING OUTAGE |
|
|
River Bend 1 |
84 |
|
INCREASING POWER |
* |
|
San Onofre 2 |
98 |
|
INCREASING POWER
STEAM GENERATOR LIMITATIONS |
* |
|
San Onofre 3 |
100 |
|
|
|
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|