Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
94 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
AUX TRANSFORMER OUTAGE ON UNIT 2 |
* |
|
Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
0 |
09/14/2007 |
DEFUELED |
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
0 |
09/29/2007 |
REFUELING OUTAGE. PLANNED MAINTENANCE ON 345 KV BROWNSTONE LINE STARTING 9/30/07. |
* |
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
80 |
|
REDUCED FOR CONTROL ROD TESTING |
* |
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
0 |
09/09/2007 |
REFUELING OUTAGE |
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
6 |
|
BALANCING MAIN GENERATOR |
* |
|
Quad Cities 1 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Quad Cities 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|