Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
100 |
|
POWER SUPPLY ALERT |
* |
|
Browns Ferry 2 |
89 |
|
2A CONDENSER CIRCULATING WATER PUMP OOS - POWER SUPPLY ALERT |
* |
|
Browns Ferry 3 |
99 |
|
POWER REDUCTION DUE TO FALSE LOW THERMAL POWER INDICATION ON FW FLOW INDICATOR/TRANSMITTER - POWER SUPPLY ALERT |
* |
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
100 |
|
|
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Crystal River 3 |
100 |
|
|
|
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
100 |
|
POTENTIAL RELIABILITY ALERT AT 1000 |
* |
|
Hatch 1 |
100 |
|
|
* |
|
Hatch 2 |
100 |
|
|
* |
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
90 |
|
HOLDING POWER TO REPAIR "1A" HEATER DRAIN PUMP DISCHARGE VALVE |
* |
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
ALERT 1 DUE TO SYSTEM LOAD |
|
|
Sequoyah 2 |
100 |
|
ALERT 1 DUE TO SYSTEM LOAD |
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
100 |
|
|
|
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
97 |
|
100% ELECTRICAL CAPABILITY - ANTICIPATE HIGH HEAT LOAD |
* |
|
Vogtle 2 |
98 |
|
100% ELECTRICAL CAPABILITY - ANTICIPATE HIGH HEAT LOAD |
* |
|
Watts Bar 1 |
99 |
|
CONDENSER BACK PRESSURE CONCERNS; POWER SUPPLY/TRANSMISSION ALERT |
|
|