Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
99 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Dresden 3 |
91 |
|
REDUCED POWER FOR ROD PATTERN ADJUST |
* |
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
100 |
|
345 KV LINE "R304" WILL BE OOS FOR PLANNED MAINTENANCE STARTING BETWEEN 0500-0600 HRS FOR APPROXIMATELY 12 HRS |
* |
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
0 |
06/29/2007 |
PLANNED S/D FOR 'A' RECIRC PUMP REPAIRS. |
|
|
Point Beach 1 |
85 |
|
REDUCED POWER DUE TO 345 KV LINE "Q303" LIMITATION GOING TO KEWAUNEE UNTIL APPROXIMATELY 1700 HRS TODAY |
* |
|
Point Beach 2 |
85 |
|
REDUCED POWER DUE TO 345 KV LINE "Q303" LIMITATION GOING TO KEWAUNEE UNTIL APPROXIMATELY 1700 HRS TODAY |
* |
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
98 |
|
100% ELECTRICAL CAPABILITY. |
|
|
Quad Cities 2 |
98 |
|
100% ELECTRICAL CAPABILITY. |
|
|