Home > Electronic Reading Room > Document Collections > Reports Associated with Events
> Power Reactor Status Reports
> 2007
> May 21
Power Reactor Status Report for May 21, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
60 |
|
FEEDWATER PUMP MAINTENANCE
POTENTIAL ISSUE WITH 115KV DUE TO NMP UNIT 1 SHUTDOWN AND FITZPATRICK EDG OUTAGE |
* |
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
100 |
|
SWITCHYARD WORK 5/20 |
|
|
Indian Point 2 |
100 |
|
MAINTENANCE ON FEEDER 95891 (1 OF 3) |
|
|
Indian Point 3 |
100 |
|
MAINTENANCE ON FEEDER 95891 (1 OF 3) |
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
99 |
|
CIRCULATING WATER PUMP OOS |
|
|
Millstone 3 |
75 |
|
INCREASING POWER |
* |
|
Nine Mile Point 1 |
0 |
05/17/2007 |
MAINTENANCE OUTAGE - TURBINE OIL SYSTEM |
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Oyster Creek |
100 |
|
|
|
|
Peach Bottom 2 |
100 |
|
|
|
|
Peach Bottom 3 |
100 |
|
|
|
|
Pilgrim 1 |
100 |
|
|
|
|
Salem 1 |
100 |
|
|
|
|
Salem 2 |
100 |
|
|
* |
|
Seabrook 1 |
100 |
|
SWITCHYARD BREAKER 169 OOS UNTIL 23MAY07 |
|
|
Susquehanna 1 |
100 |
|
|
|
|
Susquehanna 2 |
100 |
|
|
|
|
Three Mile Island 1 |
100 |
|
|
|
|
Vermont Yankee |
0 |
05/13/2007 |
REFUELING OUTAGE, STARTUP XFORMER OOS - FEED THRU AUX XFORMER |
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
0 |
03/03/1985 |
STARTUP TO COMMENCE TODAY
TRINTY-1 500 KV AND ATHENS 161 KV LINE MAINTENANCE ON 5/21 |
* |
|
Browns Ferry 2 |
100 |
|
TRINTY-1 500 KV AND ATHENS 161 KV LINE MAINTENANCE ON 5/21 |
* |
|
Browns Ferry 3 |
100 |
|
TRINTY-1 500 KV AND ATHENS 161 KV LINE MAINTENANCE ON 5/21 |
* |
|
Brunswick 1 |
100 |
|
|
* |
|
Brunswick 2 |
100 |
|
|
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Crystal River 3 |
100 |
|
|
|
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
12 |
|
MAIN GENERATOR RELAYING ISSUES |
* |
|
Harris 1 |
100 |
|
SWITHYARD WORK SCHEDULED FOR 5/21 -5/22 |
* |
|
Hatch 1 |
100 |
|
|
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
0 |
03/10/2007 |
REFUELING OUTAGE. |
* |
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
0 |
04/27/2007 |
REFUELING OUTAGE |
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
100 |
|
115 KV SWITCHYARD MAINTENANCE - NO OFFSITE POWER IMPACT |
* |
|
Saint Lucie 1 |
0 |
04/01/2007 |
REFUELING OUTAGE - HEATING UP |
|
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
100 |
|
|
|
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
99 |
|
100% ELECTRICAL CAPABILITY. |
|
|
Vogtle 2 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
Watts Bar 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
* |
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
* |
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
80 |
|
CONDENSATE PUMP REPAIRS; SWITCHYARD BUS K OOS 5/21 |
* |
|
Dresden 2 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
100 |
|
|
* |
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
55 |
|
DIGITAL FEED WATER ISSUES |
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
|
* |
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
0 |
05/04/2007 |
REFUELING OUTAGE - REACTOR HEAD INSTALLED |
|
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
|
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
100 |
|
|
|
|
Columbia Generating Station |
0 |
05/12/2007 |
REFUELING OUTAGE |
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
0 |
05/18/2007 |
NOT CRITICAL YET |
* |
|
Diablo Canyon 1 |
0 |
04/30/2007 |
REFUELING OUTAGE |
|
|
Diablo Canyon 2 |
100 |
|
|
|
|
Fort Calhoun |
100 |
|
|
|
|
Grand Gulf 1 |
0 |
05/19/2007 |
SCRAM DUE TO LOSS OF CONDENSER VACUUM SEE EN #43376 |
|
|
Palo Verde 1 |
0 |
05/18/2007 |
REFUELING OUTAGE |
|
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
100 |
|
MTC TESTING 5/22 |
* |
|
River Bend 1 |
100 |
|
|
|
|
San Onofre 2 |
99 |
|
|
* |
|
San Onofre 3 |
100 |
|
|
|
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|