Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
82 |
|
CONDENSER WATER BOX CLEANING & LEAK DETECTION |
* |
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
SWITCHYARD WORK |
|
|
Calvert Cliffs 2 |
100 |
|
SWITCHYARD WORK |
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
100 |
|
|
|
|
Indian Point 2 |
100 |
|
MAINTENANCE ON FEEDER 95331 & 95891 |
|
|
Indian Point 3 |
100 |
|
MAINTENANCE ON FEEDER 95331 & 95891 |
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
100 |
|
SWITCHYARD WORK THRU 5/12/07 |
|
|
Millstone 3 |
0 |
04/07/2007 |
REFUELING OUTAGE AND SWITCHYARD WORK THRU 5/12/07 |
|
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Oyster Creek |
100 |
|
MAINTENANCE ON STARTUP TRANSFORMER "S1B" |
* |
|
Peach Bottom 2 |
100 |
|
|
|
|
Peach Bottom 3 |
82 |
|
"C" RFP TURBINE TESTING
ROD PATTERN ADJUSTMENT |
* |
|
Pilgrim 1 |
100 |
|
|
* |
|
Salem 1 |
100 |
|
|
* |
|
Salem 2 |
100 |
|
|
|
|
Seabrook 1 |
100 |
|
SWITCHYARD BREAKER 169 OOS UNTIL 23MAY07 |
|
|
Susquehanna 1 |
100 |
|
|
|
|
Susquehanna 2 |
100 |
|
|
|
|
Three Mile Island 1 |
100 |
|
|
|
|
Vermont Yankee |
95 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
97 |
|
REDUCING POWER TO 90% FOR TURBINE VALVE/GOVERNOR VALVE SURVEILLANCE |
* |
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
90 |
|
HOLDING FOR FUEL CONDITIONING |
|
|
Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
0 |
05/08/2007 |
SERVICE WATER PUMP "A" SHAFT REPLACEMENT IN PROGRESS |
* |
|
Perry 1 |
12 |
|
GENERATOR OFFLINE |
* |
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
55 |
|
REDUCED POWER FOR PLANNED WORK ON FEED AND CONDENSATE SYSTEM |
* |
|
Prairie Island 1 |
0 |
05/11/2007 |
FEEDWATER PUMP REPAIR IN PROGRESS |
* |
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
0 |
05/04/2007 |
REFUELING OUTAGE |
|
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
0 |
05/01/2007 |
REFUELING OUTAGE - ANTICIPATE RESTART ON 5/13 |
* |
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
82 |
|
HOLDING POWER UNTIL APPROXIMATELY 0600 HRS FOR FUEL CONDITIONING |
* |
|
Columbia Generating Station |
12 |
|
GENERATOR OFFLINE - SHUTDOWN IN PROGRESS TO ENTER REFUELING OUTAGE |
* |
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
100 |
|
TRANSMISSION LOADING REQUEST (TLR-1) IN EFFECT DUE TO HEAVY DEMAND SOUTH |
* |
|
Diablo Canyon 1 |
0 |
04/30/2007 |
DEFUELED - ONLY 1 OFFSITE SOURCE - TRANSFORMER MAINT |
* |
|
Diablo Canyon 2 |
100 |
|
|
|
|
Fort Calhoun |
69 |
|
REDUCED POWER FOR CONDENSER CLEANING |
* |
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
100 |
|
|
* |
|
Palo Verde 2 |
99 |
|
REDUCED POWER DUE TO HIGH RATE STEAM GENERATOR BLOWDOWN |
* |
|
Palo Verde 3 |
100 |
|
|
* |
|
River Bend 1 |
100 |
|
|
|
|
San Onofre 2 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
San Onofre 3 |
55 |
|
SHUTDOWN IN PROGRESS TO REPLACE MAIN TRANSFORMER |
* |
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
100 |
|
|
|
|