Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
0 |
03/03/1985 |
500 KV (MADISON) LINE OOS
500 KV (UNION) LINE OOS |
|
|
Browns Ferry 2 |
0 |
02/20/2007 |
REFUELING OUTAGE
500 KV (MADISON) LINE OOS
500 KV (UNION) LINE OOS |
|
|
Browns Ferry 3 |
100 |
|
500 KV (MADISON) LINE OOS
500 KV (UNION) LINE OOS |
|
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
0 |
03/02/2007 |
REFUELING OUTAGE
THE UAT WILL BE OOS FOR MAINTENANCE |
* |
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Crystal River 3 |
100 |
|
|
|
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
100 |
|
|
|
|
Hatch 2 |
0 |
02/05/2007 |
REFUELING OUTAGE |
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
99 |
|
"B" RESERVE STATION SYSTEM TRANSFORMER OOS - 2H EMERGENCY BUS BEING SUPPLIED BY EDG
COASTDOWN TO REFUELING OUTAGE |
* |
|
Oconee 1 |
100 |
|
230 KV YELLOW BUS OOS FOR MAINTENANCE |
* |
|
Oconee 2 |
100 |
|
230 KV YELLOW BUS OOS FOR MAINTENANCE |
* |
|
Oconee 3 |
100 |
|
230 KV YELLOW BUS OOS FOR MAINTENANCE |
* |
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
100 |
|
|
|
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Vogtle 2 |
0 |
03/03/2007 |
ENTERING REFUELING OUTAGE |
|
|
Watts Bar 1 |
100 |
|
|
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
* |
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
0 |
02/04/2007 |
REFUELING OUTAGE |
|
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
0 |
02/27/2007 |
REACTOR TRIP. SEE EN #43196. |
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
0 |
02/25/2007 |
REFUELING OUTAGE |
|
|
Monticello |
98 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Palisades |
90 |
|
INCREASING POWER TO 100% - 345kV FRONT BUS MAINTENANCE SCHEDULED FOR TODAY |
* |
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY |
|
|
Prairie Island 2 |
0 |
02/28/2007 |
MAINTENANCE OUTAGE - 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY |
* |
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|