Power Reactor Status Report for March 2, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
0 |
02/25/2007 |
REFUELING OUTAGE |
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
100 |
|
|
|
|
Indian Point 2 |
100 |
|
|
* |
|
Indian Point 3 |
100 |
|
OFFSITE 138kV FEEDER #95891 OOS FOR SCHEDULED MAINTENANCE |
* |
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
COASTDOWN TO REFUELING OUTAGE - INCREASED POWER BY REMOVING "5B" FEEDWATER HEATER |
* |
|
Millstone 2 |
100 |
|
PLANNED SWITCHYARD MAINTENANCE ON-GOING - NO IMPACT TO POWER OPERATIONS |
* |
|
Millstone 3 |
100 |
|
PLANNED SWITCHYARD MAINTENANCE ON-GOING - NO IMPACT TO POWER OPERATIONS |
* |
|
Nine Mile Point 1 |
89 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Oyster Creek |
100 |
|
|
|
|
Peach Bottom 2 |
100 |
|
|
|
|
Peach Bottom 3 |
100 |
|
3B RX FEEDPUMP RESTORED USING TEMP POWER |
* |
|
Pilgrim 1 |
90 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Salem 1 |
100 |
|
|
|
|
Salem 2 |
100 |
|
|
|
|
Seabrook 1 |
100 |
|
|
|
|
Susquehanna 1 |
100 |
|
MAIN GENERATOR VOLTAGE REGULATOR IN MANUAL |
* |
|
Susquehanna 2 |
100 |
|
MAIN GENERATOR VOLTAGE REGULATOR IN MANUAL |
* |
|
Three Mile Island 1 |
100 |
|
|
|
|
Vermont Yankee |
100 |
|
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
0 |
03/03/1985 |
500 KV (MADISON) LINE OOS
500 KV (UNION) LINE OOS |
|
|
Browns Ferry 2 |
0 |
02/20/2007 |
REFUELING OUTAGE
500 KV (MADISON) LINE OOS
500 KV (UNION) LINE OOS |
|
|
Browns Ferry 3 |
100 |
|
500 KV (MADISON) LINE OOS
500 KV (UNION) LINE OOS |
|
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
99 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Crystal River 3 |
100 |
|
|
* |
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
100 |
|
TORNADO WATCH IN EFFECT - 92 OF 100 COUNTIES HAVE ISSUED THUNDERSTORM WARNINGS - MINOR GRID DISTURBANCE OBSERVED |
* |
|
Hatch 1 |
100 |
|
|
|
|
Hatch 2 |
0 |
02/05/2007 |
REFUELING OUTAGE |
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
98 |
|
HOLDING POWER FOR CAL |
* |
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
100 |
|
TORNADO WATCH ISSUED UNTIL 0800 HRS LOCAL TIME |
* |
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
49 |
|
HOLDING POWER FOR WATERBOX CLEANING AND NORMAL CONTAINMENT COOLER REPAIRS |
* |
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Vogtle 2 |
100 |
|
|
|
|
Watts Bar 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
345 KV LINE TO BE TAKEN OOS ON 3/2/07 |
* |
|
Braidwood 2 |
100 |
|
345 KV LINE TO BE TAKEN OOS ON 3/2/07 |
* |
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
0 |
02/04/2007 |
REFUELING OUTAGE |
* |
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
0 |
02/27/2007 |
REACTOR TRIP. SEE EN #43196. |
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
0 |
02/25/2007 |
REFUELING OUTAGE |
* |
|
Monticello |
100 |
|
|
|
|
Palisades |
0 |
02/26/2007 |
MAINTENANCE OUTAGE |
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY |
|
|
Prairie Island 2 |
0 |
02/28/2007 |
MAINTENANCE OUTAGE - 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY |
* |
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Quad Cities 2 |
71 |
|
INCREASING POWER |
* |
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
* |
|
Arkansas Nuclear 2 |
100 |
|
|
* |
|
Callaway |
100 |
|
|
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
0 |
02/24/2007 |
REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS |
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
100 |
|
|
|
|
Diablo Canyon 1 |
100 |
|
|
* |
|
Diablo Canyon 2 |
100 |
|
|
* |
|
Fort Calhoun |
100 |
|
|
|
|
Grand Gulf 1 |
96 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Palo Verde 1 |
99 |
|
REDUCED FOR S/G BLOWDOWN |
* |
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
99 |
|
REDUCED FOR TURBINE VALVE TESTING |
* |
|
River Bend 1 |
94 |
|
REDUCED DUE TO CIRC WATER PUMP OOS |
* |
|
San Onofre 2 |
99 |
|
|
* |
|
San Onofre 3 |
98 |
|
REDUCED DUE TO FEEDWATER HEATER MAINTENANCE |
* |
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
91 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|