Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
97 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Duane Arnold |
0 |
02/04/2007 |
REFUELING OUTAGE. 1 OF 2 345KV LINES OOS, 2 OF 4 161 KV LINES OOS. |
* |
|
Fermi 2 |
100 |
|
EDG # 11 IS OSS FOR PLANNED MAINTENANCE. STILL HAVE EDGs #12, # 13, & # 14 FULLY OPERABLE IF NEEDED. ONLY NEED TWO TO SUPPORT VITAL BUSSES. |
|
|
Kewaunee |
100 |
|
FEED FLOW MEASURING INSTRUMENT CALIBRATION ISSUE |
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
0 |
02/25/2007 |
REFUELING OUTAGE. 345 KV 0102 PLANO LINE DOWN FOR PLANNED MAINTENANCE. |
* |
|
Monticello |
100 |
|
|
|
|
Palisades |
0 |
02/26/2007 |
ENTERING PLANNED MAINTENANCE OUTAGE. |
* |
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY |
|
|
Prairie Island 2 |
100 |
|
345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY |
|
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|